LIVE scanner
MaineScannerMaine, as it happens.
City Hall·Standish·Agenda

Ordinance Committee

  • 1. Approve minutes of 10/20/2026 meeting New Business:
  • 1. Update to shoreland zoning ordinance for compliance with state law
  • 2. Council member compensation To ensure your participation in this meeting, please inform us of any special requirements you have regarding a disability at 642-3466 Planning & Development Department Standish Town Hall 175 Northeast Rd Standish, Maine 04084 Scott Hastings Town Planner
  • 1. Public Works facility impact fee ordinance The committee reviewed the proposed language which would create an impact fee for the purposes of building a new, larger public works facility to support the growing town. The committee recommended that the language be sent to the full council for their consideration.
  • 2. Changes to road weight limit restrictions The committee reviewed language to allow vehicle weight limits on town roads to be enforced by the registered weight instead of only being able to use the gross vehicle weight. These changes were being considered at the request of the Public Works Director. The committee recommended that the language be sent to the full council for their consideration. Planning & Development Department Standish Town Hall 175 Northeast Rd Standish, Maine 04084 Scott Hastings Town Planner
  • Shoreland Zoning
  • • ● ● § 237-3. Applicability. This chapter applies to all land areas within 250 feet, horizontal distance, of the normal high-water line of any great pond or river; areas within 250 feet, horizontal distance, of the upland edge of a freshwater wetland; and within 75 feet, horizontal distance, of the normal high-water line of a stream. This chapter also applies to any structure built on, over or abutting a dock, wharf or pier, or other structure extending or located beyond the normal high-water line of a water body or within a wetland. For a determination of normal high-water line on Sebago Lake, the elevation of 266.5267.1 (NAVD88 datum) feet (above mean sea level) may be used.
  • • ● ● § 237-9. Districts and Zoning Map.
  • • ● ●
    • B. Scale of map. The Official Shoreland Zoning Map shall be drawn at a scale of one inch equals 1,5002,000 feet. District boundaries shall be clearly delineated, and a legend indicating the symbols for each district shall be depicted on the map.
  • • ● ● § 237-12. Nonconformance.
  • • ● ●
    • C. Nonconforming structures.
      • (1) Expansions. All new principal and accessory structures, excluding functionally water- dependent uses, must meet the water body, tributary stream, or wetland setback requirements contained in § 237-15 B. A nonconforming structure may be added to or expanded after obtaining a permit from the same permitting authority as that for a new structure, if such addition or expansion does not increase the nonconformity of the structure and is in accordance with Subsection C(1)(a) and (b) below.
    • a. Expansions of nonconforming structures must comply with the standards of § 237-15B.
    • b. Whenever a new, enlarged, or replacement foundation is constructed under a nonconforming structure: the structure and new foundation must be placed such that the setback requirement is met to the greatest practical extent as determined by the Planning Board or its designee, basing its decision on the criteria specified in § 237-12C(2), Relocation, below; if the completed foundation does not extend beyond the exterior dimensions of the structure it shall not be considered an expansion of the structure. [1] the structure and new foundation must be placed such that the setback requirement is met to the greatest practical extent as determined by the Planning Board or its designee, basing its decision on the criteria specified in § 237-12C(2), Relocation,
  • • ● ● § 237-13. Establishment of districts.
    • A. Resource Protection District. The Resource Protection District includes areas in which development would adversely affect water quality, productive habitat, biological ecosystems, or scenic and natural values. This district shall include the following areas when they occur within the limits of the Shoreland Zone, exclusive of the Stream Protection District, except that areas which are currently developed and areas which meet the criteria for the WOC District need not be included within the Resource Protection District:
      • (1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands, and wetlands associated with great ponds and rivers, which are rated "moderate"- or "high"-value waterfowl and wading bird habitats, including nesting and feeding areas, by the Maine Department of Inland Fisheries and Wildlife (MDIF&W) that are depicted on a geographic information system (GIS) data layer maintained by either MDIF&W or the Department as of
  • • ● ● § 237-14. Table of Land Uses. All land use activities, as indicated in § 237 attachment 1, “Table 1, Land Uses in the Shoreland Zone”, [Editor's Note: The Table of Land Uses in the Shoreland Zone is included as an attachment to this chapter.] shall conform with all of the applicable land use standards in § 237-15. The district designation for a particular site shall be determined from the Official Shoreland Zoning Map. § 237-15. Land use standards. All land use activities within the Shoreland Zone shall conform with the following provisions, if applicable:
    • A. Minimum lot standards.
      • (1) The minimum size of any lot, located partially or completely within the Shoreland Development and Water Oriented Commercial Districts, shall be equal to or greater than the larger of: the minimum lot size for the underlying zone as specified in Chapter 181, Land Use; or 1 acre per dwelling unit and 1.5 acres per non-residential use.
  • • ● ●
    • B. Principal and accessory structures.
  • • ● ●
  • (3) All other legally existing nonconforming principal and accessory structures that do not meet the water body, tributary stream, or wetland setback requirements may be expanded or altered as follows, as long as other applicable Town Ordinances are met and the expansion is not prohibited by Subsection B(1) or (2).
  • • ● ●
    • (d) Notwithstanding the limitations on height imposed under subsection B(3)(a), (b), and (c), the height of a structure that is a legally existing nonconforming principal or accessory structure may be raised to, but not above, the minimum elevation necessary to be consistent with the floodplain management elevation requirement set forth in Chapter 146 (Floodplain Management) or to 3 feet above the base flood elevation, whichever is greater, as long as the structure is relocated, reconstructed, replaced, or elevated within the boundaries of the parcel so that the water body or wetland setback requirement is met to the greatest practical extent. This paragraph applies to structures that: (i) have been or are proposed to be
  • • ● ●
    • C. Piers, docks, wharves, bridges and other structures and uses extending over or below the normal high- water line of a water body or within a wetland.
  • • ● ●
  • (9) No more than one pier, dock, wharf or similar structure extending or located below the normal high- water line of a water body or within a wetland is allowed on a single lot; except that when a single lot contains at least twice the minimum shore frontage as specified in Section 15(A), a second structure may be allowed and may remain as long as the lot is not further divided.
  • • ● ●
    • I. Signs. Standish Land Use Code § 181-17 shall govern the use of signs in the Resource Protection, Stream Protection, Shoreland Development and Water Oriented Commercial Districts. expect that:
      • (1) Properties shall be limited to 2 signs.
      • (2) Signs shall not be larger than 6 square feet in the Resource protection, Stream Protection, and Shoreland Development zones; and 16 square feet in the Water Oriented Commercial zone.
      • (3) No sign shall extend higher than 20 feet above the ground.
      • (4) Signs may only be illuminated by shielded, non-flashing lights.
  • • ● ●
    • N. Agriculture.
  • • ● ●
  • (2) Manure shall not be stored or stockpiled within 100 feet, horizontal distance, of a great pond or a river, or within 75 feet, horizontal distance, of other water bodies, tributary streams, or wetlands. All manure storage areas within the shoreland zone must be constructed or modified such that the facility produces no discharge of effluent or contaminated storm water.
  • • ● ●
    • P. Clearing or removal of vegetation for activities other than timber harvesting.
      • (1) Within a strip extending 100 feet inland from the normal high-water line of a great pond classified as GPA under Section 465-A [Editor's Note: See 38 M.R.S.A. § 465-A.] or a river that flows to a great pond classified as GPA under Section 465-A or within a strip extending 75 feet inland from the normal high-water line of other water bodies or the upland edge of a wetland, there may be no cleared opening or openings, greater than 250 square feet, and a well-distributed stand of vegetation must be retained. However, a single footpath not to exceed six (6) feet in width as measured between tree trunks and/or shrub stems is allowed for accessing the shoreline provided that a cleared line of sight to the water through the buffer strip is not created. The
      • (2) Within a shoreland area zoned for resource protection abutting a great pond there may be no cutting of vegetation within the strip of land extending 75 feet inland from the normal high-water line except to remove safety hazards. Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be limited to that which is necessary for uses expressly authorized in that district.; and
  • • ● ●
    • Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
      • (1) Hazard trees in the shoreland zone may be removed without a permit after consultation with the Code Enforcement Officer if the following requirements are met:
    • (a) Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening in the tree canopy greater than two hundred and fifty (250) square feet, replacement with native tree species is required, unless there is new tree growth already present. New tree growth must be as near as practicable to where the hazard tree was removed and be at least two (2) inches in diameter, measured at four and one half (4.5) feet above the ground level. If new growth is not present, then replacement trees shall consist of native species and be at least four (4) feet in height, and be no less than two (2) inches in diameter. Stumps may not be removed.
    • (b) Outside of the shoreline buffer, when the removal of hazard trees exceeds forty (40) percent of the volume of trees four (4) inches or more in diameter, measured at four and one half (4.5) feet above ground level in any ten (10) year period, and/or results in cleared openings exceeding twenty-five (25) percent of the lot area within the shoreland zone, or ten thousand (10,000) square feet, whichever is greater, replacement with native tree species is required, unless there is new tree growth already present. New tree growth must be as near as practicable to where the hazard tree was removed and be at least two (2) inches in diameter, measured at four and one half (4.5) feet above the ground level. If new growth is
    • (c) The removal of standing dead trees, resulting from natural causes, is permissible without the need for replanting or a permit, as long as the removal does not result in the creation of new lawn areas, or other permanently cleared areas, and stumps are not removed. For the purposes of this provision dead trees are those trees that contain no foliage during the growing season.
    • (d) The Code Enforcement Officer may require the property owner to submit an evaluation from a licensed forester or arborist before any hazard tree can be removed within the shoreland zone.
    • (e) The Code Enforcement Officer may require more than a one-for-one replacement for hazard trees removed that exceed eight (8) inches in diameter measured at four and one half (4.5) feet above the ground level.
      • (2) Storm-damaged trees in the shoreland zone may be removed without a permit after consultation with the Code Enforcement Officer if the following requirements are met:
    • (a) Within the shoreline buffer, when the removal of storm-damaged trees results in a cleared opening in the tree canopy greater than two hundred and fifty (250) square feet, replanting is not required, but the area shall be required to naturally revegetate, and the following requirements must be met:
    • (i) The area from which a storm-damaged tree is removed does not result in new lawn areas, or other permanently cleared areas;
      • (ii) Stumps from the storm-damaged trees may not be removed;
      • (iii) Limbs damaged from a storm event may be pruned even if they extend beyond the bottom one-third (1/3) of the tree; and
      • (iv) If after one growing season, no natural regeneration or regrowth is present, replanting

Where this came from

Standish Agenda Center
The town's own agenda, 14 pages. The outline above is read from the first pages of that document; the packet behind it has the memos and exhibits. Links open in a new tab.

The summary and transcript follow the meeting, once reviewed.