City Hall·Rockland·Agenda

Planning Board

  • City Of Rockland
  • 1. Call to Order and Roll Call:
  • 2. Communications:
  • 3. Old Business:
  • 4. New Business:
  • 1. Review an application and site plan (PB27-7) submitted by Penobscot Rentals LLC for the conversion of the existing commercial building at 30 School Street to 14 residential units -PUBLIC HEARING-
  • 2. Review an application for subdivision (PB27-9) submitted by LeVigeon LLC for an existing development at 20 Elm Street:
    • a. Sketch Subdivision Plan -PUBLIC HEARING-
    • b. Preliminary Subdivision Plan -PUBLIC HEARING-
    • c. Final Subdivision Plan -PUBLIC HEARING-
  • 5. Other:
  • 6. Public Comment:
  • 7. Previous Meetings Minutes:
  • 8. Adjournment: cc: City Manager Department Heads Applicants Planning Board Findings of Fact 11-17-2026 Planning & Code Department 1 30 School Street Site Plan Application Penobscot Rentals, Applicant Submitted to: Rockland Planning Board Prepared By: Elias Kann, City Planner Public Hearing Date: 11/17/2026 Date: 11/12/2026
    • I. INTRODUCTION Penobscot Rentals LLC has submitted a Site Plan for the conversion of an existing commercial building to 14 residential units at 30 School Street. The subject parcel is located in the Downtown (DT) zone. This application is reviewed by the Planning Board for compliance with the City of Rockland’s Site Plan Review Standards (Chapter 16, Article II). This project is reviewable as a major site plan in accordance with 16-201.D.1.b. The project was elevated to major site plan review due to the number of residential units and proximity to Downtown. The first meeting regarding this project was held on November 17, 2026. A public hearing was also held on November 17, 2026. The meeting and hearing were duly noticed to the
  • Ii. Required Reviews
  • Iii. Existing Conditions And Surrounding Area
  • Iv. Proposed Development
    • V. RIGHT, TITLE, & INTEREST The applicant is property development company and is the owner of the subject parcel an international marina, boat storage, and boat repair operator and is the current owner for the parcel recorded in the Knox County Registry of Deeds in Book 6307 page 294 and has demonstrated sufficient right, title, and interest to the parcel involved in this application.
  • Vi. Financial And Technical Capacity
  • Vii. Zoning Analysis
  • Viii. Site Development And Technical Standards
    • A. Traffic and Circulation Maine DOT average daily traffic volume for School Street was estimated at 1,550 vehicles in 2025. The applicant is proposing a total ADT of 18 trips which is the total vehicle trips not accounting for current traffic volume from commercial uses.. This is a low-end estimate due to the lack of on site parking. Sidewalks are present on school street, the applicant proposes indoor trash storage in the basement. Snow removal will only be required for walkways and sidewalks. Finding of Fact: Based on the submitted application materials, the project's description of components related to traffic, access, and circulation, the Board finds that this standard is determined to be met.
    • B. Parking and ADA No parking is provided on site. 0 parking spaces is allowed by right. Zoning Dimensional Review Chapter 19 Citation Standard Requirement Proposed Finding Front Setback (min) 0 10’(existing) Met Front Setback (max) 5-15’ 10’ (existing) Met Side Setback (min) 12’ ~3’ (existing) Met Rear Setback (min) 0 10’ (existing) Met Maximum Building Height 65’ 42’ (existing) Met Planning Board Findings of Fact 11-17-2026 Planning & Code Department 3 Finding of Fact: Based on the submitted application materials, the project's description of components related to parking, the Board finds that this standard is determined to be met.
    • C. Significant Natural Features Protection The property is fully developed, and no significant natural features are present. Finding of Fact: Based on the submitted application materials and the project's description of components related to significant natural features protection, this standard is determined to be met.
    • D. Landscaping and Screening (16-402) The property is full developed and no changes to existing landscaping are proposed. Finding of Fact: Based on the submitted application materials and the project's description of components related to landscaping, buffering, and screening, the Board finds that this standard is determined to be met.
    • E. Stormwater Management No changes to the site are proposed. Drainage will remain the same. Finding of Fact: Based on the submitted application materials and the project's description of components related to drainage this standard is determined to be met.
    • F. Sediment and Erosion Control No site work is proposed. Finding of Fact: Based on the submitted application materials and the project's description of components related to sedimentation and erosion control, this standard is determined to be met.
    • G. Public Utility Infrastructure (16-404) The applicant is not proposing a significant increase in utility demand. Documentation of capacity to serve has been provided by the Wastewater Department and MaineWater. Finding of Fact: Based on the submitted application materials and the project's description of components related to Public Utility Infrastructure, this standard is determined to be met.
    • H. Community Safety The proposed development was reviewed by the Fire and Police Departments and has adequate space for emergency services access. There are two fire hydrants in close proximity to the project. The building is sprinkled and has Knox box for access by Planning Board Findings of Fact 11-17-2026 Planning & Code Department 4 emergency personnel. There is no street construction associated with this project (16-405 is not applicable). Finding of Fact: Based on the submitted application materials and the project's description of components related to Community Safety, this standard is determined to be met.
    • I. Exterior Lighting (Sec 16-401) The applicant is not proposing any new lighting. The applicant discussed alcove lighting for entrances, but it is unclear whether these existing or proposed. If new lighting is proposed, the applicant must provide a photometric plan or lighting cut sheets as applicable. Any non-conforming luminaires that are replaced must conform with Sec 16-401. Finding of Fact: Based on the submitted application materials and the project's description of components related to lighting, this standard is determined to be met.
    • J. Noise and Vibration The applicant is not altering existing HVAC systems. No significant change in noise or vibration is anticipated. Finding of Fact: Based on the submitted application materials and the project's description of components related to noise and vibration, this standard is determined to be met.
    • K. Architectural and Visual Appearance (16-403) The applicant is proposed a conversion of an existing building. No new structures are proposed. Finding of Fact: Based on the submitted application materials and the project's description of components related to Architectural and Visual Appearance, this standard is determined to be met.
  • Ix. 16-206 Performance Gurantee
    • X. PUBLIC COMMENT AND FEEDBACK The Board has not received any written or verbal comments from abutters to the proposed property.
  • Xi. Proposed Motions
    • a. Site Plan Review On the basis of the application, plans, reports and other information submitted by the applicant; findings and recommendations contained in the Planning Board Report for the public hearing on November 17, 2026, relevant to the Site Plan Standards of Chapter 16 of the Rockland City Code; and the testimony presented at the Planning Board hearing, the Planning Board finds that the plan is in conformance with the site plan standards of Chapter 16.
  • Xii. Limitations Of Approval
  • 1. Approved Project Scope: Approval is limited to the above findings, PB-27-5A Application, and attached materials. Any improvement not included in the PB27-5A application or proposed site plan is not authorized by this approval unless separately reviewed and permitted.
  • 2. Traffic, Parking, and Accessibility: The existing site access points shall remain as shown on the approved plans. Parking and circulation improvements shall be installed substantially as depicted on the approved site plan and shall comply with the applicable requirements of Sections 16-205.A, 16-205.B, and Chapter 19-301. The accessible parking space, access aisle, and accessible route shall comply with applicable accessibility requirements. If compliant bicycle parking is not already available to serve the tenant, a rack or similar bicycle-parking facility shall be provided outside the motor-vehicle parking area prior to occupancy. Snow storage or removal shall not obstruct required parking, accessible routes, pedestrian walkways, or site
  • 3. Separate Permits and Approvals: This Major Site Plan Review does not replace any required building permit, inspection, license, environmental approval, or other permit or approval required by the City of Rockland or another authority having jurisdiction.
  • 4. Underground Storage Tank and Site Work: Decommissioning, removal, handling, and disposal of the existing underground storage tank and any related materials shall be completed in accordance with all applicable requirements of the authorities having jurisdiction. Any site condition discovered during removal that requires a material change to the approved site plan shall be submitted for review before the affected work proceeds. Planning Board Findings of Fact 11-17-2026 Planning & Code Department 6
  • 5. Consistency with Approved Plans; The site shall be developed and maintained in accordance with the approved application and plans. Any material deviation from the approved scope shall require prior review and approval in accordance with Rockland Code Sections 16-208.D and 16-208.E.
  • 6. Expiration: This approval is subject to the expiration and extension provisions of Rockland Code Section 16-208.C. Staff Signature:__________________________ Date:________________ Submitted Materials:
  • 1. Site Plan Review Application
  • 2. Project Narrative
  • 3. Warranty Deed
  • 4. Abutters List
  • 5. Wastewater Ability to Serve
  • 6. MaineWater Ability to Serve
  • 7. National Flood Hazard Layer
  • 8. Aerial Imagery and Street views
  • 9. Staff Draft Findings of Fact
  • 10. Staff Completeness Report Site Plan Submittal Report Planning and Code Department 1 | Page 30 School St Major Site Plan Completeness Penobscot Rentals LLC, Applicant Submitted to: Rockland Planning Board Prepared By: Elias Kann, City Planner Date of Meeting: 11/17/2026 Date: 11/01/2026
    • I. 16-201.D Site Plan Review Thresholds This project is reviewable as a major site plan in accordance with 16-201.D.1.g. The project has been elevated to a major site plan due to the size of the proposed residential development and the location of the project in proximity to Downtown. II. Completeness review An applicant may make a request to the Planning and Code Enforcement to waive certain submittal requirements. Waiver requests shall be in writing and may be granted by the Planning Board. Unless waived by the Planner or their designee, the following items are required for a for a complete initial major site plan submission, items confirmed to be submitted by City staff are indicated by a check mark.