Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[0:01] Chair: We are the Newcastle Select Board, 9th of November meeting, calling for order at 7-0-1. And are there any amendments to the agenda? I know the police attorney manager had one. Yeah. Go ahead, Eric.
[0:15] Eric: I'm just adding an additional proposal to the item. So if you need to change it, just recognize that I'm looking to discuss the third proposal
[0:23] Speaker C (unidentified): that I shared this afternoon. Okay.
[0:25] Chair: So, yeah, we're just adding that to the alternative project. Anything else? Hearing none, moving on to item three, meeting minutes from previous meetings, and tonight we do not have them because the staff has been swamped over the last weekend, so they've been election or something, so understandable. Okay, so there's no meeting this, moving on to item number four, public comments on items not on the agenda. Is Roger come with them up? All right, we'll talk about the castle. Yeah.
[1:08] Public commenter: Tonight for a couple of things reasons I found the last few weeks, and I'd like an update on what's going on across the street from my house. Has that come to a resolution?
[1:28] Chair: So it is not, so yeah, it's in the works, Roger. Now I've been hearing, yeah, it's slow, it's always slow. Yeah, so you go through your list and then let's, let's see what you have. I
[1:58] Public commenter: you know, I was told the last time that he wasn't going to give answers, and you know, the reason I guess, you know, you don't want to talk about this is because not much has been done. It's, you know, this is not in January, this would be six years that we've been dealing with this process and still hasn't come to a resolution, so I wouldn't be very proud of that either. I wouldn't
[2:26] Chair: want to talk about it. Well, it doesn't fit in the footer like what it does not fit in for closure.
[2:32] Public commenter: Six years, no, but the process, okay, is three years before you can foreclose. You foreclose in January 25 is what I understand, so January 25 to January 26, that's another year, okay, and then from January of 26 to now November, that's another 10 or 11 months. There's five from January 1st, that'll be six. You're going on six years you've been doing this. I disagree. I've been on this board
[3:09] Chair: for six years, we have not been discussing this for six years. No, it was three years before you
[3:14] Public commenter: can foreclose, so you probably can't find it at all in them three years. There's no reason to, so what I'm saying is how long is this going to go on before you're going to take care of it,
[3:27] Speaker E (unidentified): deal with this? Okay, you
[3:33] Public commenter: know i 've said right along but this board has never been open and transparent and talk about you know what's really going on and after last year's so-called town people referendum or whatever you want to call it i heard a lot more people say the same thing that i've been saying that there wasn't enough information it wasn't open there wasn't trick is painful they needed more information and it's about time that other people have seen
[4:04] Chair: What I've been seeing, you know, also the property that you're questioning right now is got legal, it's got a real issue with that story, okay? So we don't have, we just cannot talk about legal issues.
[4:26] Public commenter: Sorry. I've been hearing that.
[4:28] Chair: Yeah, I'm sorry, but it's time.
[4:32] Public commenter: You know, I've been a town manager or a cycle. It's not all peaches and cream, but I get it. You know, you have to make some hard decisions, some unpleasant decisions. But at the end of the day, you signed on for this. So I can do the hard work and get some results here like, you know, our government has grown so much in the past few years that, you know, it's hard to think that where's it going. I mean, we only had three selectors, they were overseers of the poor, they were assessments, they were road commissioners, they're part of the town now. We got five selectors, we got a full-time town manager, and so what do we need five select before anymore? Basically you guys are figureheads, he does all the work, he brings you. The results and you write yes, I mean, it's just it's true so much that I just don't, I don't see where it's going, and we're not getting any quicker results either with all this help. So you know why you're coming to the town meetings, a lot of these, and all I hear is we've got to increase the tax base, gotta increase the tax base, gotta increase the tax base, but yet you have little to no interest to go after these delinquent taxes, but you gotta increase the tax base. I get it, next is the road out of. The road, okay, numerous times have come to this, these meetings, and there again, you know, the issue is still going on eight months now, and I asked about what it's going to be taken care of, when this damage is going to be repaired, dead that's been damaged the last two years, and it's still not fixed. I went to one of the, you spoke up and you says, that hasn't been fixed yet, and I said, no, and it's still not fixed. I met with you, Kevin, shortly after you went back from medical leave, and that was the two issues I wanted to meet with you on. There was a property next door and the road. And I thought at that time, you know, you were gonna take it up with Seth and you were gonna get it fixed. So after that, nothing happened. And so September 19th, I got an email and said, the Hot Top Plants is gonna be closing in the next couple of weeks. So this emergency to get this done and get it fixed, okay, and so nothing, I thought any day now they'd be coming down the road and they're going to fix this. So November 6th, last Friday, I sent you another message and you said, well, I'm going to meet you about this week and that's one of the things we're going to talk about. Well, we only got another couple weeks to get this happened. Why has it taken this long to get this done? It's it's, you know, I thank you Kevin and Rufus and for coming out and seeing the damage firsthand this spring, so there's no denying whether the damage was done or not. The damage was there and it's real, and I think coming out to see that and expectant. And our road, by any stretch of the imagination, is not a paved portion. It's not in excellent shape. I get it, you know, but it's in fairly good condition and it's not adequate for the amount of traffic we get on our road that the road has to give. And with that being said, it's also 30 years old, so it's an extremely good condition for its age. Two years I've been complaining about Hagas working on that road. When the road was posted the first year I complained about it, you, Karen, said, well, he's a town official, he can work on closely. Well, you can't work on a coastal road if he's doing damage to our world. Nobody has the right to do damage to town profit, nobody. So in the end of this, like, it's like he, I will, in the spring, cannot stand 70,000 pound trucks rambling over our roads, crushing and polarizing our pavement that we got left, and they have no business being on there, but yet they keep doing it. And all the years I've looked at, I didn't ask for much and I don't think it's asking for too much to hold his feet to the fire and make him fix his road at his expense. His crew caused the damage, he should fix it. And I asked the day they were doing this, I asked, was a supervisor I could talk to on the job? No, I have no supervisor. So they're Out there working with no supervision. And so I think it's time that we have a policy or an agreement put in place that they have no longer going to work on our roads when it's posted, when the roads do not support that heavy equipment. I think it's high time we had that agreement, our policy. And the only time they're allowed to work on that road when it's posted is if there's an emergency and the cars can't go, vehicles can't get in and out. Then they should bring up six wheels gravel and get out. Until the road dries out and it's and it can support that heavy equipment. And it's high time we did that because I'm going to tell you something right now, I'll make you this promise. If he comes back in the spring when that road is posted and it cannot not support that kind of weight, you can put every vehicle and every piece down in that road.
[11:20] Chair: No threats, all right. Well I'm just, that's a promise, okay, it's a threat, so just.
[11:28] Public commenter: Please finish what you have to say, come on, okay. You know I mean you and the pride board members complicit in this matter, because the day this was going on I told you and I told you what was going on, and they were damaging the room and you could have stopped it. You put them in a phone call and you could have stopped it, but apparently you didn't because they continued to work the rest of the day. One of the trucks got stuck in that bad place, a real bad place, many deep ruts. Before they left they. Filled it in with their famous rocks, filled it in and left it, and that's how it is.
[12:08] Speaker E (unidentified): It today, so.
[12:12] Chair: I'll kind of get this done the next couple weeks, could happen, we could say.
[12:18] Eric: That my text message is that's tomorrow to review outstanding things for the season, yeah.
[12:29] Speaker F (unidentified): Anybody else have any comments.
[12:47] Public commenter: And asked wanted to know about the status on the crosswalk signal at Academy Hill Road and Mills Road, what the status of that is, so.
[13:12] Eric: This is a more expensive cost to prepare this. We're still waiting for the insurance company from the truck driver to send us the chip. We've ordered the new light, but we can't install it until I can schedule all the electrical work that has to be done to it. So it shouldn't be put in a big spot again, but I don't have... I think there's a design problem there. There's a bigger problem.
[13:41] Public commenter: Excuse me, but there are options, right? I mean I've seen intersections where there is just a setback little that is for setting off the lights so didn't seem like that 's could be looked at I think that also there's
[14:10] Chair: Your evidence, where it is on the corner, I mean, you can't have a pile on or a pillar are right where it is when the trucks make that make that turn. I know, but if you had this button
[14:24] Public commenter: that's set back, that's next to the existing pole that's already there, and it's only for turning on the lights that are that are set out, you know, on poles someplace else, like it for Newcastle public accounts, you know. He said we see people that are could look for some way to be able to set off a signal to be able to go across from the Newcastle. It's a business, you know, and you said it, they
[14:53] Chair: have to be someplace else, and that's the big that's the big issue. It's just where they have to be excavated. It has to be a new foundation. It has to be a pole set somewhere, so be wires on
[15:15] Public commenter: It's been a year and a half, two years since it got replaced, it got run over again, not
[15:27] Eric: even two months after we installed the last one. And that's been a year, not even a year.
[15:35] Public commenter: It just seemed like a long time. I mean, the kids are walking across. And two, with the safety issue, the other part of it is that there are people, including myself, who are out at 530 and walking. Dogs are just getting out before they had to go to work. Or women who are out walking on the street in areas. That particular, you know, walking along Mills road doesn't see that it slows people down anytime along there too and so anything that can be done to address help mitigate the possibility of somebody it's important yeah any other comments anybody else oh excuse me i have one other comment yeah having you know it goes to i was seven but having my wife and i've been raised in texas spent the majority of our life there 's one thing about texas that seems to be kind of prevalent as far as this Mills road project, and that is if somebody doesn't pay their taxes, somebody doesn't do something that harms the public right, that particular entity comes in and says you owe us this money. You don't have it to us by this time, we're seizing your property, and we're taking and we're putting your post, your property up for sale at public auction at the county courthouse on this particular day, and whoever walks in with that $50 in taxes or $100 or whatever, if several people come in, they go, and that property is theirs at the end of it, and it takes, it takes away from us possibly having a long-term burden placed upon us as citizens, or but it's going to happen in the future. I think I can just say Kevin.
[18:05] Chair: That all the state to a team, yeah, okay, that's the last comment. Move on those and public comments, moving on to item 5a, good soft day school district. So I think we have August and Mark here. Hey guys, would you mind coming here just so we can touch this little? Thanks for your time, Mark. Do you want to, August, do you want to throw that up on those?
[18:55] Public commenter: I was wondering if there was an audience to see it.
[18:59] Chair: Oh, you have the mic. Six of us.
[19:17] Speaker H (unidentified): Yeah. You got everything?
[19:43] Chair: Okay, great. So I want to start by thanking you for coming in. I think this kind of started when Ben and I, and Thomas was there, we ended that kind of planning meeting back in. And so we got sort of the introduction to, I think what you got on board there, some design concepts and discussion about the planning process and some of the concerns around.
[20:18] Speaker E (unidentified): We kind of talked
[20:22] Chair: to, you know, I think that I think you have a meeting with them, Scott, August, and so we know that I saw it was written in the paper, so we had some kind of what happened. So I think we just want to, this point we just want to understand what the board is kind of pursuing and what the thought process is and just kind of bring us up to speed so we can kind of be part of the conversation. Definitely where we were with Damer Scott was essentially kind of what we expect this to be here, which is just an update on what they, because they had not the meeting that three of you were at, there was kind of in the tent. We just wanted to make sure that we knew that we were looking at options, didn't want the room to get back to them, thinking that we were planning to build a school without any funding. Essentially what we told them, what I think you are aware of and what the board's attention is, just to be responsibly planning for the future needs of the school and the space needs and to have something that is ready to go if and when enrollment needs change. Right now the trend of the state is down and the trend of the district is pretty stable, but we all know the housing needs of the state with new administrations, focuses change, funding changes, and yet the pace of town governance and school board governance is geologically slow, so the board just wants to be prepared if there's a enrollment decrease with developments that may come in or funding changes that might arise that tend to benefit people that are ready to go instead of starting a five-year planning project. [Speaker E (unidentified): Yeah, I] Think what we were talking about too is that junior high has been in that school for so long, so we kind of looked at this, you know, what can we do separate. We looked at, as you guys know, those on the committee that you're looking at, what would it cost to renovate the existing school, what can we do. You'll see it, what they did is they came up and they raised the top so that's a junior high with high students who can use the same foundation and stay within the space that we have there. We've been also looking at parking. Parking is a big issue that we have. When I was on the board of the Dam Scotter there was a gentleman that came in and he had 12 acres that he sold to the town of Dam Scotter for a real reasonable rate. What he was saying that someday at the school needed that he wanted to make sure that he put it in Dam Scotter's hands so that it will be available, and that's something that we've talked about amongst ourselves about, we need to look at that to put something formalize that no matter what we're doing we need to have more land there to grow what we're going to do for parking, for one thing. That's a big issue is that the property running towards the back where the farm sheds are, that's what it is. Yeah, so it's. These are just a few pictures of some things that might help you understand.
[24:29] Eric: The space that we have.
[24:33] Chair: We're really looking for just, as you can see, those are the locker rooms where we have a lot of the equipment that needs to be in a community area. If you go outside with the locker rooms gets a lot of information, a lot of our equipment. I'm sorry I didn't bring it up, yeah, but it's, yeah, the main thing was is, you know, we have a junior high that is just somehow we could open that up to have some other things for them, that's just everybody's so crowded and in the rooms too, what I hear from teachers. is we have these temporary walls that you can close and the teachers next to each other can hear each other teaching so it's frustrating for them you'll see in here too one of the last pictures is the gym floors dropped about two inches on one side actually today we took a vacuum out where the volleyball mats go and had to suck the water out of the bottom level because there was something that was stuck in the bottom of just some things that we're trying to be proactive to take care of the Building we have, so no matter where we head, there's things that we might have to look at doing down the road that will just being proactive looking at what's the. So do you have a, have you addressed this with the board, you have a committee, or is it just we don't have a committee yet? I think the responsible kind of move forward to have some real, some standard discussions regarding the land, you know. I don't, I think that's the course and then go to the car. Yeah, so I think that a former committee to kind of start to retry to get something that some base is my intention. I was like remark about this earlier that I think it's important to have in order all rolling to have, you know, and real benchmarks that we can work towards so that whenever there's more changeover or stop changeover or administrative sort of change over, it doesn't just look like a square one and that's, you know, we're still in this. I think, I think it should be said is a concept, it's not what we're doing, we're not ready to, you know, go to taxpayers and ask for money, that's still down the road, and we're just trying to recognize the fact that classes fluctuate every now and again, there's room for students, still a little bit depends on the grade levels, despite in one grade level things get tight, things need to shift, but again, you know, one or two housing projects pop up and enrollment increases like 40 or 80 students, that becomes a real problem. Yeah, I've seen referenced a few times
[27:52] Public commenter: the, if the Mills Road project, there's no kids, there's never going to be kids left there, right, and so that doesn't really need to be part of the conversation, and some of the other ones that are intended to be workforce housing too, like that, when you're talking about 150 square foot apartment, you're not having a couple of two kids in there, so I don't think that factors in. But are there, for something like this, it looks like there are some needs currently, yeah, space-wise, but are there, what's the projection of a student body that would type of families are based
[28:26] Eric: on that was maybe do a hundred more students. Yeah, and I think our goals we shared with the
[28:34] Chair: Jim Scott award that would like to build a facility that would hold 500 in the house, so if we're looking down the road for something, we said, well, if we build it to 500, we have space, means we don't have anything for like the trains to do anything, no rooms for them to do anything, any sort of updated science facilities, there's no real science lab anymore, I think that would be
[29:02] Eric: considered was taken for classroom space it's still a science room but i don't think there's
[29:09] Chair: really you know there's no bunsen burners and nothing like that with sexual lab yeah it's just now a science classroom so there's a 397 what's current enrollment can you can you just tell us what we're looking at here this is enrollment this is from i think lindsay said that it's like i don't know the exact report but this is what gets submitted to the state so the official number as of october 1st And this is just the trend from 2017 through the present and it includes K-8 students in total enrollment with the secondary as well as the three-time total. Do
[30:05] Public commenter: you think it's possible, I'm not a contractor, so tell me I might be crazy, but is it possible to look at this in stages like addressing sooner some of the things are really necessary not 100 more students and then having planned for if it looks like we're trending upward then let's do phase two of this and make the capacity for more kids yeah absolutely and
[30:32] Chair: i think what it was is when we met as a committee we said okay we talked about all the things where we would like to have this is what the concept is but I think reality is for the amount of money that's because taxpayers a lot of money so August and I were talking earlier and said you know okay we have this wish list here but then we got to get to reality of what can the taxpayer actually afford and if we can have to phase that over three stages to do it we're gonna have to do but if we go ahead and kick that off down the road like other schools have done, we can't do that. We've got to be proactive to take care of what we have now and to make it take care of our schools. Right now you have a kitchen that's pretty
[31:20] Speaker C (unidentified): tight. I don't know how they do it, but there's some things that could be done
[31:24] Chair: in there to free up some room, like the stage, how they use that. I'm lucky to have Katie on there doing that but this memory is it definitely can make things better but like all this and I were talking earlier we need to go ahead put this thing down so that we say okay this is the different projects this is yes this is an elect but let's see what else we got to do what we can actually afford is community and then we can see that trying like you just said let's see what that's doing for the next couple years to see what's going on for them i hope i hope we Have 100 students in the next eight or ten years. And being a service center, what we've noticed is a lot of, when the economy goes down, we get a lot of service center students that come to the other scholar because that's the service center that they come to. So we do pick up students there, even the homeless kids. I don't want any of those around here. Yeah, but there is, we don't want them, we don't have homes. Yeah, you know, we're trying, we're trying to solve the problem in our, the thing too, because You know, we need housing. I mean, and what is, you know, how do we as a town, as select boarders, as you know, staff administration, what can we do to kind of move the needle on that? And then, you know, we have to stick around after this, we'll be talking about the development on Military, and that's 24 to 30 unit development. And you know, gentleman behind mind it, Rob Nelson, you know, he's been in 16 units the last couple of years. The problem is it's important to develop for the demographic that we're going to see here to go to schools. So it's like you have affordable, low, something that could be subsidized by, you know, by government, and they're looking at small units like parents said, you know, maybe one bedroom that doesn't necessarily raise a fan, you know. So that's one part of one part of the spectrum, you know. And then we have, okay, I want to build two and three bedroom houses that families can actually use and you know put kids in. We just don't have money, the subsidies to make those ends be, because you know cost of construction is crazy. Yeah, and so in the middle with like, where do we, where do we find that? Like I don't know where it's gonna come from. So I think that's the question, you know, how do we, you know, how do we, it would be nice if we were leading the problem. And you know, it's up to the school board to say okay, how do we, how do we address the problem, because it's an awesome job. Yeah, so I don't, you know, I don't know where it is. Has been, we have been disillusioned through the pandemic last five years to at least about to the last six months until it seems like the housing market. Yeah, people stuck in that kind of idea, like people again, you move in here from cities telecommuting, like I don't see it anymore. It's
[35:01] Eric: Just like they're coming through well, and there isn't, there's these thousands, but it is good to be to have a ten-year plan. To be proactive, because I think you're doing the right thing. You know, to know, okay, all of a sudden something happens and we've got more students next year and 50 after that, but yeah, you got to have a like, you know, like I think you said, you know, shovel ready, something to move into, so I think I think you're on the right track.
[35:40] Speaker H (unidentified): Well, yeah, I mean, you know, I don't know when I was a great self a, you know, fourth grade was.
[35:45] Eric: Out in the trailer, you know, and that wasn't a great solution, but it was the best.
[35:51] Chair: Solution that we had, yeah, and that's what, you know, we'd like to try to avoid the best degree possible. There was a whole, there were ramps and pathways and yes, there's at least six, I think, what do you think is the maximum, he says under 100, it seems like I can't imagine I'm just getting another hundred kids in this, no, not currently, that's what we would be looking at now, I guess. Oh, do you have an idea what the curve is like, it was the enrollment number when you look five years like 450 is kind of. The.
[36:36] Eric: Max on the 10 year look back, I'll bet that was pretty tight, yeah, I mean I.
[36:42] Chair: Think my kids were there then and what it was, yeah, I asked because I had a feeling I'm gonna question, yes, the ribbon and Johnson and her thoughts on that, every great you take a few students, the two or three grades got hit with a handful more students, we'll be getting shorter classrooms and forget get shoes can only give one number, it's how they come in and allocate it among grade levels, so you know, we're bumping, we're beginning to bump up against, that's not a huge amount of money and you know. I think it should be addressed, that the question is often asked, you know, you know, back in the day ten years ago there were more students and there was ways to form, circumstances have changed, regulations have changed, needs, special education students have changed, and you know, spacing needs to be allocated for those programs that are federally mandated because they take both funds, so it's not like comparing apples to apples with space, you know, square footage per head doesn't directly compute 1990. Levels so I was so I did a little mapping today. I was kind of kind of curious to see if I could come up with like a number of units where you say okay now how many units are on the schedule to be permitted before you're like now we got a problem. So just consider some of these statistics right. So there's in Bremen and residents or something so population. So in Lincoln County, not necessarily, but in Lincoln County as a whole, the number of kids, and this is based on the census of 2020, each household has 15.9% of the housing is 59.9% of the houses have kids under the age of 18. So if you take, okay, that's zero to 18. So if you take the primary school middle school ages, it's about 7%, so 7% of the housing. It checks out a little bit, so it's actually pretty close because when I did it, I took it, was 7%. We have 2,116 homes, households within three towns. So if you take 7% of that, there's about 146 households in those three towns that are serving the primary grades of the GSB school district. So, and that tracks, there's 2.1, 2.3 people per household. School. So it's about kids per house. Kids per house, yeah. So there's about, the math comes out to be close to 400 kids. So just looking at 146 households. So what you have to look at, you're going to do say a 10% goal. So let's say you're going from 366 and adding 37 kids or so. So how many how many permits do you have to see what's what's the increase in housing units in those three towns based on the average kids in the household because not every house that's going to be built 37 houses are going to be built in every place that's three different those houses it's going to be it's going to be a demographics with everybody you know so using the 7% or the 15.9%, I said, well, how many houses, how many housing units do you need to see being built? And he said, okay, 37 of those housing, 37 kids are coming from that number of housing units being built, and that number I came up with was 103 units. So he saw permits for 103 housing units over the next two years. You're gonna say, "Holy crap, we gotta do something quick." But you know, that's the only point is a trigger. You can look at it that way. Just where do we keep an eye on the towns, on the, on the planning department? We haven't had relevancy two, three. Well, so I mean, we're trying to get these things built, you know, like the ones I mentioned. They're not all serving the primary school families, you know. That's what I'm saying. So, you know, you've got the retired people, you know, the state groups in the retired community that they have to divide these things so a market rate, you know, those houses get, you know, this, the families unfortunately out of the market, which is what we see, which is hence our problem. Exactly. So the other thing I looked at, which I think is just interesting, I said, what if this project was $50 million? Started in two years, let's say. So what is the, what is the, what is the debt service of $50 million? $2.8 million a year? Okay, so that would increase your school budget by about 24%. Just to carry the debts with us. Okay. I said, okay, that's, that's a lot of light to, I mean, the point is you're building it because there's people to fill it and there's, there's kids to fill it, there's kids to fill it because there's more housing stuff, right? Each one of those units represents taxable valuation. So I looked at it this way too, which is what do we see evaluation in place to cover the 2.8 million that service at the school would have to turn to expand it and cover two million dollars in renovation and that number was, so I came up with a total, a total unit where I said in square footage of about 63,000 square feet of new residential space in the three districts and three towns to cover the valuation of the two neighborhoods. So it's a $25 million valuation, [Speaker C (unidentified): which isn't] crazy, it's 1.6 percent. So the total valuation of three towns is 1.5, point five three billion, so 25 million dollars increase is not crazy, but you still have to increase it like so at the general cost of say 750,000 dollars, which should really give you the opportunity to even build a house for something like $50,000, which is crazy, but what you're looking at is you need about a patient increase of about 30, 33 houses to cover the debts for those schools across three towns. So it's not crazy, but you got to consider too, those three houses, those 37 houses, which is three houses are great probably only we're looking at which is 103 and then if you do the tax value three units go to town the map works yeah they sweat you have to build this because we can't housing with stairs or at the breast.
[44:54] Public commenter: What you would not wait on weed so it's good well that's on 50 million and this.
[45:01] Chair: 50 million dollars this is 25.
[45:03] Speaker C (unidentified): If you go to that today yeah three years from now.
[45:08] Chair: And that's where we're at is yeah the knowledge that every day construction costs take up and you know we're in this little bit of a 22 environment the needs not there the need might.
[45:23] Speaker F (unidentified): Be there soon you.
[45:28] Chair: Know the whole thing to do is to be prepared so that if you need to come who can and that's you know like I said we're not here asking to get ready to put up a bond initiative we're just letting you know this is where we're at this is where we're thinking you know we're hiring we're in the middle of hiring a new superintendent and then you know one of the criteria is kind of strategic.
[45:54] Speaker E (unidentified): Forward thinking there's.
[45:58] Eric: The hope that the candidate has.
[46:05] Chair: The board would love to have a candidate that can bring some experience in long-term strategic planning in the facilities and kind of lens. So don't forget, we're spending $4 million just to get to that point and we're not even breaking records yeah and then i think to argue with you mark but i think this is i think this is 35 to 45 dollars if you go for tomorrow and definitely i'm going to split yeah i'm not crazy yeah and as i said the other thing is that 's presumption that this is a taxpayer project i think the goal would be to have the state and federal funding again there's things that programs right and that's what we see Before I've seen it with the dim sky when I was on the board was we always tried to have a shovel ready project yeah because if the economy goes to hell and the government.
[47:18] Public commenter: Needs to do this project.
[47:21] Chair: 75 because they want this thing done so I should always the other the thing is we built on that 20,000 square feet on the right hand side plus we did the cafeteria area I was on that committee in 1998 and it was just under three million dollars and we were like. [Speaker E (unidentified): Yeah I.] Mean, you know, I think, yeah, I mean, I think it's all, you know, I did look at the DOE's website. We have a lot of good information about the process, and they also, I could see why nobody guess, I don't know how much no horror got, but it wasn't much money for the state. There's just no money for this, right? Yeah, the other thing is I'm friends with the director and Winder. They were lovely people working with the state, but they finally did get
[48:39] Public commenter: almost 100 percent of the state that paid for it, yeah.
[48:45] Chair: That'd be great, I mean, I think, I guess the point is you got to keep the state's rules in check because they have a lot of responsibility to follow up too, so yeah, it'd be nicer if we could just survive as far as tomorrow. Yeah, absolutely, yeah, that's that's given as far as being responsible.
[49:20] Speaker F (unidentified): It's a little bit of, and I'm not bragging on you, but I was a little peppy when having the sort of theoretical planning conversations about needs, and everybody's talking about that 's the most important, and it's absolutely not. You know, I think it is a, in the history of just GSB is that, Mark, I think we talked to the damage credit board, is that every time, from the moment the school was built, it wasn't big enough. And then we did an addition.
[50:03] Speaker E (unidentified): And so I know
[50:14] Speaker F (unidentified): looking at GSB is a little bit of an interesting boat. You look around at other schools and none of the other schools are doing this. Cassie Southport Bristol world steady doing all right enrollment funding, so two things I guess I would say is our session and I know there's benefit that you can solve, you know, there's a lot of hassles to go with that, but more often that's something ignored especially now. And the second thing and this is my biggest question, let's not keep making the same mistake, it's good think big. Yeah, oh yeah, Ben and I had this conversation
[51:27] Chair: after where she just she spilled this in the bag and that property that you're talking about
[51:33] Speaker E (unidentified): out there, yeah, and
[51:37] Speaker F (unidentified): I don't, I don't want to hear any dirty language just saying that conversation and hearing from the teachers specifically since they kind of got going, you know, wouldn't like me out there often to which the there's some juggling is happening your audience honestly I learned details on marketing but I was shocked the details about our lunch procedure. [Speaker E (unidentified): It's] Up to pages, but we got, we got to think bigger. We got to think beyond just solving for 500 students because we built the school thinking it would be enough. Conversation was left by how much it's going to cost taxpayers. I don't like things that started how much it's going to cross the taxpayers. That's not especially getting children, so I'm not exactly schooling, but I am the most important part of the conversation. Most important part of the conversation is laying a foundation for a plan that's sustainable going into the future and meets needs, the educational needs of our children. Don't take that. What I'm saying is we made a good plan, then we find the money. Nothing beyond reason, just saying conversation, planning effort that's led by how much it's gonna cost in taxes is doomed to fail quickly, and the history of that is already been proven. So let's just not make the same mistake again.
[54:13] Eric: There's a one question you may or may not be able to answer, but in the of the 366 students, how many of those would be considered, you know, junior high, like the six through eight? Is it, I mean, is it, does it break down evenly throughout the grades, or would it be that
[54:35] Chair: at 133? You know, sorry, I don't know junior high. You bring up an interesting point, like
[54:44] Eric: oh, I don't think separate high
[54:49] Speaker E (unidentified): school you're
[54:54] Public commenter: going to put them upstairs, which
[54:58] Eric: logistically it makes sense, right? And you know, the central office is still the central office and
[55:02] Chair: you know, condenses everything, but one of the things I heard though in the meeting was that it was in May was there was just a lot of power. Yep, I think the school's limited, so I think the other might be a section expansions because the culprits are right, the pursuant sacred ground with the special money into that, we can't go to pocket on it or anything. I have it, yeah. Sometimes we may have mistakes, yeah, it does, yeah. This isn't set in stone, you know, this is developed because it's cheaper. You don't have to take out the
[56:19] Speaker F (unidentified): and we're not we
[56:23] Chair: haven't gotten into details yet to the point of being like, well, we're gonna ask this, we gotta access, we gotta, you know, I think it just, we're approaching you from a responsible because when you do look at that, this is whatever was, you know, two out of ten households have kids, yeah, but
[56:47] Speaker F (unidentified): it's not just those household responsibility to educate, not at all.
[56:57] Chair: Exactly, and that's, you know, we're not, we're on the same page, we're not that, as I said in the beginning, the next realistic step for the board to be taken is to have a serious conversation about trying to secure land because nothing really happens before for that. Parking, and just where does it go. That gives us options to, I think you're taking the idea of, maybe it is, I mean, no school on staff, you know, going out, two separate things, you know, logistically, and not have to, I mean, you can't build that and have function normally in session.
[58:24] Speaker F (unidentified): To think ahead, yeah, being ready, obviously, are really important, so I'm all in favor, the possibility is a great way to think about it, I just come at it from the responsibilities actually to the children, not the taxpayers, yeah.
[58:49] Chair: Board member, that's what the, you know, our constituents are the children, you know, not really the people that cook for us, and she's like, funny, a funny simple post, yeah, I mean, Thomas has got kids there, I've got, you know, GSB, yeah, but you know, I couldn't, I couldn't be happier with this and for what the school does with the resources, even though there's not clutter, it's, you know, it doesn't affect the quality of education, that's the business, but yeah, everybody, it's a space, yeah, before long kids will be having class, Mr. Belch's class, right, yeah, so great. Thank you for this.
[59:50] Public commenter: Hey, thanks, everyone. Nothing back. Yeah. Gee, thanks. Yeah.
[1:00:08] Chair: Okay. We've got this. Hey, Halloween. I'm losing street.
[1:00:15] Public commenter: So you need to look out. We don't take them. Sorry.
[1:00:17] Speaker C (unidentified): I didn't think there's occurred to me halfway.
[1:00:21] Chair: You know, I think that's you
[1:00:25] Public commenter: know, even despite the
[1:00:27] Chair: lights right off the essence of the mood, well, how did the lights make it, pretty cool, maybe more
[1:00:37] Speaker F (unidentified): they helped, but it was like my family landed there and like, where are the lights, like, there's some over there somewhere there, and they're like, okay, it was a little bit of a wall, like, yeah, it was a good, easily could have had two or three times this number, how many did we have, eight, well, yeah, 16 actors, yeah, but they were just, they were put
[1:01:06] Eric: out in pairs, but did it change the utility poles, so where do they work
[1:01:15] Chair: especially from sort of the town right away by the, because that's whatever, there's that satisfying, yeah, it gets really dark, yeah, there was
[1:01:33] Speaker F (unidentified): still quite a few dark spots, well, I mean, it's got to be a little sweet, no, I mean, it was fine, it did get to that point where you're like, okay, I've lost my family, I can't find them, yeah, but it's a great attitude, everybody was. So goodbye, everybody.
[1:01:51] Speaker E (unidentified): It was a hell of a experience.
[1:01:52] Chair: In fact, when you walk through the gates down the upper property to the end, there's no lights. [Speaker C (unidentified): It's so dark.] And it's like shoulder-to-shoulder people. And you literally have to make sure you don't run into somebody.
[1:02:08] Public commenter: It's just dirt. What about having to do the candy thing?
[1:02:18] Eric: Yeah, I'll be in that this time, talked about it, just more ready to do go that route. I mean, the legal advice was we would buy the candy and then offer it to some of the homes, and I did hear, you know, one person ran out of candy after handing out 700 and just had to turn the lot off, and it was like seven. Maybe that's a popular thing, maybe that's okay, maybe. And some residents have reached out now and said, can we have some informal conversations? So I'm going to start doing that, the neighborhood, see what their thoughts are on how you group this for the
[1:02:58] Chair: future, what do we do next year. I mean, I think I have this idea that would be, what if we did something over at Redmond's Park and created something over there, and you know, town sponsored surface space, you know, and then we'd have a crossing guard that's going to say the one
[1:03:17] Eric: issue is getting people across the street, because it's already an issue just like you said before, like the drop off, and yeah, you know, kids running out in the middle of the road,
[1:03:29] Speaker F (unidentified): so I don't know how much of a validity of veracity there is to this, but I refer to the room now, there's potentially talks of moving the trunk or treat that happened, the great thing, moving to that parking lot space. Oh yes, the impact to Glidden Street will be huge, would be enormous, yeah. So there's a lot of people that already do both, but if it's a simple matter of literally just walking on the back parking lot where most people park anyway, Glidden Street next year, if that happen next year, could be considerably better, yeah. I could, I think
[1:04:11] Chair: GSB over the street, yeah, that would be interesting, it would be interesting, but you know, I think you gotta remember that it's not our event, we're just supporting it, and an idea of safety on the streets because of their town streets, so I think we're, we're doing good there, but at the end of the day, people's, their residents can't have community, so yeah, I mean, there's a burden on the citizens, and so I think kind of private conversations, just kind of like hearing what the residents say, it's very approachable, yeah, and luckily there's always
[1:05:01] Public commenter: the option to try to do a light off if you're done, yeah, let's do that, so
[1:05:09] Chair: More like if we do it next year, I think we have to do at least just twice, I guess. We can't do a beer garden.
[1:05:19] Eric: Why not, why not talent sponsor? I don't know, it's not talent sponsoring. I mean, I know of several beer gardens.
[1:05:42] Chair: Yeah, it's never too much. There's a positive. Okay, and I think it was safe to it. You know, there was enforcement was there. It just felt.
[1:06:00] Eric: That's got our department, they had, we kind of know into apparatus. Add to the to the says they were hanging on candy. So usually they would have their event here and have like an open house, but it just worked out better to have them as part of this too. Good. A lot more track, which is the whole point of the whole idea, and that was the discussion that reached more kids, and that's it, that's it, that's it, go where they are.
[1:06:37] Chair: I don't think, I don't, I'm sure there's quite a few of the red junior firefighter guys that are kicking around. Those
[1:06:48] Public commenter: six-year-olds want to be firefighters. You have to wait a few years.
[1:06:53] Chair: It's a good time. Yeah. Okay. So we'll talk about...
[1:07:01] Eric: Next September. Yeah. Well, I mean, we did have a little conversation about, you know, the batteries worked well. There was plenty of juice in them to handle that load. Why not run an extension cord from that up the other direction so we're not carrying more batter batteries out? That's a good, yeah, by running extension cords off of them so you can have the lights right there, you'd be able to have lights that go one way. Yeah.
[1:07:32] Public commenter: The extension cords wouldn't be for people walking, right? No, they're all up.
[1:07:36] Eric: Okay, where the utility poles are so.
[1:07:42] Speaker E (unidentified): Sorry, I don't.
[1:07:47] Public commenter: Need to carry 25 batteries.
[1:07:49] Eric: No, I mean, you guys did okay. Ben and Tor did the heavy lifting. Oh, it was great.
[1:07:55] Chair: Took a half hour to send them out, a half hour. Yeah, so I'll have some conversations with the
[1:08:03] Eric: neighborhood. They've requested that, so I'll do that next, bring you guys recommendations in September. Okay, all
[1:08:13] Chair: right, we'll put that one to rest, and then we're going to go down at six B, because I'm just going to special account. Yes, it's crazy. How are our endemic signs for surplus? I can't, the percentages are like almost exactly less than one percent differential between, I mean, how does that happen? That's crazy.
[1:08:36] Speaker H (unidentified): I think it's a very popular idea.
[1:08:38] Chair: Yeah, but I can see if it was like 20% off or something. There was literally like 16 people in 1,300 or something that had a different opinion. But I think that means
[1:09:02] Eric: You've got to get work. That's what that means. I'm glad that it is as clear as it is, so we don't feel like we're dragging 47% of the population into something that they don't. It's really, it's nice to see such clarity for me. That was how I, my takeaway from that was just like, okay, good. We're for the most part we're all on the same page and we want to see if the next step
[1:09:36] Chair: You know if this is viable. Yeah I was talking to a sub board member today and we're like you know one concern that they had was you know did everybody understand what they were doing obviously you know it's kind of complex and some like proposal but I'm thinking I mean a like they're so close everybody the votes were supposed to be the same numbers basically even in margin if say 15 didn't understand what they're already on there's still a wide margin there's still enough of a margin here to say okay I really didn't Understand what you're looking at majority of people or more than majority of people really got so I
[1:10:41] Eric: Assume you want to move forward yeah well I mean I think yeah okay I drafted Tuesday woke up Wednesday morning's crap pretty much put together that's preliminary design and timeline of sort of phase two. So phase one was, this doesn't make sense, here's also how to do it. Now we'd be in phase two where we'd actually want to pull together the joint oversight. Ideally what we'd do is, this is the time to send an all call. Hey, anybody interested in volunteering to start on the board, on the oversight board. Board and we put that out now in the paper for Thursday I've already submitted the paperwork and I said please consider this uphold until I talk to the court on Monday night so that's the link for the article in the paper was included there the form is live too now we keep this open until the end of November and then in early December we'd have to split towards me codify by give the manager's direction to sign the local agreement and theoretically choose who you want on your representing your Side of the site. So that would then give us time to work on the draft bylaws to bring back to the select boards, do an RFP to do the preliminary design work and identify sites that could potentially be utilized for facility. Facility in that process in the next year and a half. So I think what we're looking at is ideally we'd be looking at collection in June of 2028, communities consider funding for the construction and equipment purchases. So that's, you know, it's laid out there this at this stage, but I just wanted feedback before just marching forward. Or no feedback.
[1:13:00] Speaker F (unidentified): Feedback is not really ours. It's 75% both towns.
[1:13:10] Eric: I think your timeline looks realistic. I mean, for town government, it's a little bad. A little optimistic, but we have to be optimistic here. I mean, we've this we've sort of going back to when we signed our snowfall contracts like this has been, you know, we've known that if we went this route it was going to have to happen in five year window. But yeah, five year window. So I think what you've laid out here, you know, the steps make sense chronologically and
[1:13:52] Public commenter: Of development. Yeah, I mean, I think the only way to completely derail this is
[1:13:59] Speaker E (unidentified): I mean
[1:14:04] Speaker H (unidentified): I think I think if we can't find the ideal site we'll just have to
[1:14:09] Public commenter: Be more creative, you
[1:14:13] Eric: Know. I think it's out there and then we'll find it. Good. And in a local agreement states that no more than two select board members which community can serve on the joint oversight board. It doesn't necessarily have to always be some other member in a select board members, so don't rule yourself out. Just put your name first.
[1:14:41] Public commenter: How I don't care. Remember how many did we have from them?
[1:14:46] Eric: Each has three members who sit on the joint oversight board in order to have four, and we have to have four, and at least, you know, obviously that means one person from one community. That's right. Yeah, okay, so
[1:15:03] Chair: All we need to do is get
[1:15:04] Eric: Is seven. That's all I'm asking you. Assuming you're okay with us launching this timeline and trying to stick to it, is pretty aggressive. I agree, it's pretty aggressive and optimistic. So we recognize like only go till the end of the 30, so we still have, so I have to have that conversation with our contractor. That is Andy. He's he dropped it. So he did a lot of the legwork. I just provided comments and some targets for him. Okay, so he feels pretty good about it. He does, he does. Can I make a motion for A special spot meeting during the dinner Scott on Sunday 26th at usually there's a six o'clock there's a thing. It's a Monday. It's a Monday, right?
[1:16:21] Public commenter: It's the week before our
[1:16:23] Eric: Or yeah, I'll be we'll have three months now, yeah.
[1:16:29] Chair: 14th of June.
[1:16:35] Public commenter: Anybody need a second? Maybe. Oh, I second that. Jeez, yes.
[1:16:39] Chair: So I'm sorry, that was really good. All right, you always got my back.
[1:16:49] Speaker E (unidentified): Oh, you're welcome. Wait here, what was it?
[1:17:03] Eric: I think, I think they had the last one, they had the last one when we just met about the housing thing. So let's do it here, let's do it here. I think we have a little more space.
[1:17:15] Public commenter: Yeah, it's just like that. I'm just going to change [Speaker C (unidentified): chairs for that.] Not for us. Oh, did I get a good one last time?
[1:17:31] Chair: There's nothing else. Let's take a look all the time project with an additional piece of application, which is a proposal from Haley Ward, who came through.
[1:17:57] Eric: That's been added to the list, but now the other two are attached to the package.
[1:18:05] Public commenter: So for those of us who did not spend our life anywhere near construction projects, we've, we've got three organizations, how the hell do they all fit together? What's- They do differently. Yeah, so kind of because of what we just got was saying, oh, we'll do the architectural, we'll do this too, but I don't think we're gonna do that.
[1:18:29] Eric: So I'm not comfortable with moving forward with what we did in the first round. Right, okay. So this is why I'm sort of saying, we got good information and useful information to help us move forward. So at this stage, the way I see Haley Ward's relationship is to do the design work. They are working with the architect to make sure that what road that gets designed matches what they intend of what we're going to do on the site. So they're working closely on the landscaping architecture side of it, and identifying which type of buildings we're going to do. The architect is essentially a team member on Team Newcastle to see this project. The architect and the developer. The developer will carry a lot of the identifying the funding and ensuring that we get to our goal to cross the threshold.
[1:19:23] Public commenter: It sounded like the architect was also a general contractor. No,. How come they were looking for a half a million
[1:19:31] Eric: dollar fee? No, that would be concluded as part of the design the project inflation and all different steps of getting all of the processes so yes there is about 500 000 in development that includes the general contractor who the architect would
[1:19:54] Public commenter: oversee okay so it is that they might not be the general contractor but they're going to be
[1:20:01] Eric: responsive to the power contract we helped okay we have a role always but these are our partners to get it done that's the way i see it right now all i'm asking for is use of our remaining grants that we have to spend by the end of december folks on to help us take the next few steps
[1:20:26] Public commenter: Okay, and the one we just added in would be responsible for helping with the moving of and the installation of utilities. Correct. The rope coming in. And the architect at this point will assist
[1:20:44] Eric: in making sure all of that gets done in a timely fashion. And they're not
[1:20:48] Public commenter: going to do any concept. They're going to do concept plans.
[1:20:52] Eric: What you got from Kaplan-Thompson, basically taking that to the next level, okay, coming back and saying, you know, we had I limited that information, but I think it needs to go to the next level. What does it really look like? So a couple iterations of what that is. He's more willing to come in and have a conversation with you about design and then figuring out marching orders to go refinery. So, you know, I have an idea based on what Free World did for us, and that was part of my advisory group that I put together to help in understanding, you know, this project might cost, you know, eight to ten million dollars. I gotta go find eight to ten million dollars. That's part of what Ann's gonna help me do, and I'm not necessarily looking at the traditional main housing approach because of the underground tape that comes with it. As I mentioned before, a lot of the focus is, I think, energy-efficient housing that we're showcasing. There's some grants out there to finance that, not all, some of it. Little problem solve this, and I've met elders do this like the prop up. I've written so much about it, I'm kind of nauseous from it, but I envision a really interesting and unique project that we could package up and say, here's the focus. With municipal land, my vision is that there's either a land trust that's formed or a housing development fund that's a trust that's formed that helps make sure that whoever buys one of these homes or units, when they go to sell it, gets some equity out of it, but not market grade equity, so can stay within that affordable range. Preferably finance, I'm going to be strict to 80 to 120, in part because I know sheriff's deputy can make it more than 120 percent of a month, but still can't find housing, or can i can't afford housing because it's the cost of it's still greater than 120.
[1:23:19] Public commenter: I don't recall us discussing and deciding on any kind of mix. Well, I think that's what, oh, first, everything that I've read, it's like everything's building possible ownership, not just these sections. This section, it's just always rentals. Yeah, we haven't, and we're still not defined. We
[1:23:41] Eric: I haven't defined any of that. I mean, I think that's, isn't that what this next step is? But you know what, that makes sense. The units are going to be single months. Are they going to be doing taxes, rental market approach? Something I've been learning about is those who are in those rental markets, some of their contribution to covering the cost of their rent is something they get to take with them when they do. So I've seen models where you pay 30 percent of what you [Speaker E (unidentified): make. Half] of that 30 percent goes into a fund that you get to take when you leave. So you are generating, you're building your own. And I want to ensure that, I'd like to ensure that this project involves some level of equity for whoever ends up living there. But obviously if you're trying, can get, you're just taking 50 percent of rent pay for the building itself, there's got to be a lot, huge subsidy to make that work. So I don't, I don't know what it looks like yet. It's more about, that's part of the reason I want to work with Dan. He's done unit models in the past and he's done a lot of happy support. But he's, he's excited about this approach and trying to figure out how to make it work. It's taken me about a year to find the right mix that I'd like to consider are working with again. Here they are for now. I mean, if there's an ownership model that's different, there's other partners that are going to be brought on and I'll figure out what this looks like, because we're just building a shell.
[1:25:35] Chair: We're spending grand money, so that's not, yeah, to pursue more information on some paper to get a professional
[1:25:52] Eric: services cover all three of these contracts, professional services, or these three contracts, it's entirely covered with grant funds we have remaining, and it happens then before the end, but they're still, even some will still be clear
[1:26:10] Chair: about, they're not good other than 15, 44, and 20. Excuse
[1:26:19] Eric: me, 20. Yeah, just a quick recap on this entire project so far, how many taxpayer dollars, maybe some of my time, but okay, great, it's a good deal, okay.
[1:26:41] Chair: The way I read the developer agreement, that's committed to using that developer throughout out the entire project, not for this year, is that correct? Yeah, only if it goes forward, right? But if there's no sort of opportunity or you chose not to, because you, how long would you say you took time to go for RFP just so you've selected this piece? And that's what I'm asking the board is eight percent of a normal developer fee. I really don't know if it seems like it. Did you say a big number or a good number? Big number.
[1:27:28] Eric: I have seen development change up to 15% and it's a contingent of 15%. So if the cost of, let's say it's a $10 million project and 8% of that is $800,000, then let's Let's say the project overruns and it's 11 million for the project to come in. I [Speaker E (unidentified): mean,] there'd be a negotiation about that, but if there's no way to pay for the project other than the contingent is that the developer gets paid, the difference between the final project cost and what was contracted.
[1:28:18] Chair: I think 10 million is- Well,
[1:28:26] Eric: that's why I'm chasing down unique grant opportunities as part of this.
[1:28:30] Speaker C (unidentified): I mean, I think all the goals,
[1:28:34] Chair: yeah, that's, I think that's going to be, not going to be close. So, the percent, we think of it kind of as a management fee. That's it. That's included, that includes construction. It does.
[1:28:50] Eric: I mean, some of the weak points that I was reviewing in the agreement is, you know, we already own the land, so that's a risk diversion for the developer. And that's the kind of pushback I had on it regarding negotiations. Know that typically when a developer takes on a project, they are putting down money on a piece of land and they're going through a planning board process where they may or may not end up with the land. So if it goes south, they may have to pay earners money on the land that they inherited when they decided to develop this project. We own the land. And in terms of community bias, you know, we're going to be every step of the way with that person. So we're mitigating some of that risk too. And that's where he said, well, in many other cases, you know, you're looking at a 10% developer fee season and you can still go for 10% and then you keep 2% of that as the town. I was like, well, we're not interested in making money. He's like, well, what you could do is you could use that 2% to help subsidize a specific program, reduce the rent for someone, or create a fund to do that. So I was like, OK, well, figure that out. But whatever we set as a development fee, it's got to be at least 8% to cover his fortune. It could be higher to at least establish a project cost.
[1:30:40] Chair: There's both the Haley Ward and the ARCHITECT scope include site layout.
[1:30:46] Eric: Yeah, I want them to work together to find the right solution.
[1:30:49] Speaker C (unidentified): But there's budget I guess in both of those. There is.
[1:30:54] Eric: The timing of getting things for people, we're saying I haven't signed any, I didn't even have a conversation with Haley Ward about maybe scaling back some of that. So if I do, then I got my other funds to spend the money. But no, I've already told whole parties to work together to design this. So I'm thinking more landscape approach from Kelly Ward and more process didn't.
[1:31:26] Public commenter: The awards say that the landscape architect is not included.
[1:31:32] Eric: That's what I'm talking about revising so that, okay, all of these things get covered and I still spend the grant money that. [Public commenter: Is now where.] is the access where is the access to the property there's a fire hydrant that's right there between the eight unit project and there's a single family house there 's a fire hydrant that sits that's there that's a part of the so
[1:32:07] Public commenter: Has, I know this is in content, but has this access way right enough for a fire truck to get back to it? Yep, and they, you, that is the fire department. So that's, that's back there and be able to get back there. Okay, with maybe 26 cars, 26 units, it doesn't seem like it's very safe thing to be.
[1:32:51] Chair: I just want to read this last paragraph here and which developer proposal dance proposal page 204, your retainer is due 30 days. So next paragraph down, the contingent really is considered portion of the overall developer generated by this project. Is this just the hypothetical? I mean, what is, I wonder if this is about, I'm.
[1:33:28] Public commenter: Sorry, can you bring me to where you are?
[1:33:30] Chair: Yeah, page two of four, signature page on Dan's fan, the final paragraph. Oh, okay, final paragraph. Gotta go through this twenty thousand one, you know. Yeah, a lot of these sort of.
[1:33:47] Eric: Experience with chair and he's trump, maybe. Yeah, I was, I was confused by this for a while and I sat with him and worked through. So this is what I was kind of, so if we looked at this project and we said we want to have a development fee of 15 and let's say we wanted a million other developers to help finalize this project or come up with potential ideas to find funding or whatever it is. So under.
[1:34:23] Chair: Agreement you would be receiving a fee basically construction manager developer project, right, based on percent. Mm-hmm, so let's start your.
[1:34:39] Eric: Project at 15%, a development fee of 15%. When we're going out looking for money or asking for money, we have an estimation of the cost of the project. We have development fees, we have architectures, they're all part of that package that we say we have. With this, we need to do this project for physical construction and all the soft costs and the development. And if we set it at 15 percent, if we're not, we're
[1:35:08] Chair: setting it at eight percent. Well, you're hiring one development or eight percent. And if you have, if you want, if your budget can afford to have [Eric: more developer fee] Because you think there might be other things outside of disco. You might put in your, we develop your budget. You might make more than that. What that language is saying, he just gets the 8%. It's more if your budget has a number. That's your, that's the town's or whatever to do. Yeah, exactly. So, I mean, that doesn't seem like it's really necessary.
[1:35:43] Eric: It isn't necessary. Yeah,
[1:35:47] Chair: so it's kind of confusing, but your problem is, that's what I'm trying to tell you. It's not really relevant to the agreement. Oh, yeah. It isn't.
[1:35:57] Eric: I'm trying to make the argument that if it is higher, it is yours to do with what
[1:36:03] Public commenter: you wish. This is 8% of the total. Yeah. So the first he's gonna get, he's gonna get or more depending on the total cost, it's gonna get the similar. I'm just trying to get me here on the class, so he's going to get similar feed then, but more or more, it's going to be important. Yeah, 80 of the
[1:36:28] Chair: projects, where's the number of them, that's in one of these 13.
[1:36:36] Eric: He's giving an example of what those are estimated, yes. He's not, that's not part of his contract. Between the architect fees and salt, the biggest commitment right now is with Dan. Why, that's part of this, it
[1:37:39] Speaker F (unidentified): goes forward. If something goes forward, no, if a different project happens, not that project, we're not tied. What had, I mean, that's gonna be, I mean, what's like if a housing project, so for the test, but they develop, if it goes forward, use them. It's not if anything ever gets built on that site, is that
[1:38:14] Chair: the project, is so. Yes, I guess they're going to define a project, yeah, right. And then if that
[1:38:21] Speaker F (unidentified): project goes forward, they're our guy, right? If that project doesn't go forward, something else happens, it's not like, you know, oh, sure, yeah, five years, whatever reason, five years from now, yeah,
[1:38:39] Chair: right, the broad scope of this discussion, yeah, is your car, excuse
[1:38:53] Public commenter: me, so then what is the public
[1:38:55] Speaker F (unidentified): to buy in, do you
[1:39:00] Chair: Mean the cost you want to go to taxpayers? No, there is one thing overall, irregardless of who does it, yeah, for big bucks down the road, Kevin. I think this is, yeah, this would be something to reveal with item four. There's gonna be process, you know.
[1:39:19] Speaker F (unidentified): Review processes any other project would be, does.
[1:39:25] Public commenter: That make sense? Yes, but it just seems like that this is being pursued very quickly and certainly wouldn't want to, well.
[1:39:34] Chair: Nothing's being pushed through. All we're talking about is a certain grant money that are, yeah, we're just talking about planning. We're not talking about doing a project, breaking ground. We're just talking about how do we scope this out to understand what can be built and then, you know, where to get money to make this actually happen. There's a fee associated with that and we're really not going beyond that. I mean, if it comes to be that it's just not doable, then it's not doable, you know. I don't know. I mean.
[1:40:07] Public commenter: Sure, but it also, excuse me, so then one of my concerns too is for water, you know, if you have 26 even, does it, how does that get into the Great Salt, is water consumption being able to put it down based on a drought, based upon, you know, I mean, this is, doesn't that's down the road, but.
[1:40:38] Chair: It's a great question. I mean, I guess like the answer, it kind of, my feeling would be that GSB is fine. They probably have an eight inch main that goes right down the road right there. This is a small development for it. There's a stump, there's a stump, yeah, a new stop line going straight out of that property. There's natives going mills eight inch going up Academy Hill too, so you got two, you got two ways to get water even, and if you want to talk capacity of Green.
[1:41:11] Eric: Salt Bay, they are undergoing a study right now that's supposedly due in December.
[1:41:16] Chair: As part of the planning process, you have to demonstrate that the water and sewer district can accommodate our project. Therefore, you can care for a minute, all right, so this, so the sewer.
[1:41:28] Public commenter: For this particular one, for them going into this and having sewer capabilities, and how does that make it so that people down the mills rather later on are going to be able to have.
[1:41:43] Chair: That type, actually, awesome, that's part of the study that's being done now, yeah. I mean, that's, these are all good questions, but it's all part of the discovery process, right? We don't know because we don't know right now, but the discovery process is a way to understand what capacity is.
[1:42:06] Eric: We really until we have someone like this contract to do a design that we can actually look at to comprehend, okay, how many units are we talking, how many gallons of wastewater are we going to need to deal with, how many gallons of water are we going to need to bring in, like without an actual plan on paper we can't understand anything. So this is this is the next step in the process is coming up with how many how many toilets are we going to be flushing, you know, so that we can then do the discovery. On, okay, that's fine, yeah, so the way GST runs.
[1:42:50] Chair: It is they charge impact fee for a unit, so how many units, but you know what their impact fee is per unit, it went up right after I paid, yeah, it's a lot more, so they charge you an impact fee is say $35,000 or $47,000.
[1:43:14] Public commenter: Yeah, oh, no, I know.
[1:43:17] Chair: So on a project like this, you have 30 units, yes, $150,000, yeah, it's a significant number, that has to be accounted for, we'll have to figure it out, it's covered, but that's the way to handle it.
[1:43:33] Eric: And then that money is earmarked specifically for increasing the capacity, should no that's not it's to.
[1:43:50] Chair: Keep costs lower for existing customers, right, they do not plan for future, and I.
[1:43:55] Eric: Believe their impact is illegal in the state of Maine, could be that they do not plan for.
[1:44:04] Speaker F (unidentified): Future customers ever under any circumstance, right, so then so then this cost per unit.
[1:44:13] Public commenter: Could be that there would be four homes on this one acre place would make it because there's only that amount per unit makes the cost of that house.
[1:44:27] Chair: Come down versus the more you as you have the as much as the impact, it seems it's a big number, it's really not, it's really not a big number in terms of the whole process, yeah, just look at it this way, if you had to put in a private septic system to manage 30 units it would be more than a thousand bucks guaranteed, yeah, significant system, you probably wouldn't have room on the site, could have to be pumped over the hill, yeah, so it's just not it's you know that's why you know that's why we can do. This in a condensed in a in a district where it's a density because of septic system, one thing you're doing beyond planning is you are picking like you're picking the architect, so you have to be comfortable with the type of work this architect does, right, I mean so that's you're you're again for a project you're defining out of this process you're picking your team, so you've.
[1:45:45] Speaker F (unidentified): Got to be comfortable with that too.
[1:45:51] Speaker E (unidentified): Yeah.
[1:45:55] Eric: the letterhead there is the title of this thing it takes you right to his website yeah who's kyle's primary projects primary projects get you an example i chose i 'm bringing kyle forward in part because of his knack for the communal housing he's done that he's written a book on he's done a lot of this work and some of his projects are really unique plus he's really focused on the that neutral buildings
[1:46:33] Public commenter: So is there any time that he's wanting to speak to you all together, or he has not been in front
[1:46:39] Speaker E (unidentified): of the board? No, but
[1:46:42] Eric: we would talk, you would see him, you would see him playing. Yeah, I mean
[1:46:48] Chair: I mean, so again, we're committing a number that's really not, it's not a liability for, not any liability to the town taxpayer, and we're only committing to that portion at this point in time. So if for some reason we get spooked by the horse in the ball, right, yeah, we can, we can resist, you know, we can terminate and we can go a different path, right? Am I right
[1:47:25] Eric: or wrong? You're correct. Right now all we've done, we have spent some of that grant funds to have one architect design some basic concept things. I did not feel comfortable with the attention we were getting, and in part because that architect has way bigger fish to try than to work with a little new guest. So I said, well, who else is out there? And I've met with probably half a dozen, a dozen, and about a dozen architects saying, you know, do you have the capacity to do this, are you interested inside the project? Basically everybody said they were interested, but as I started having these conversations, I felt represents what in terms of thoughtfulness and the decline and respect for our zoning, and he has that. His, the added benefit was on top of that was is the interest in providing Iowa's sustainable housing. So two things I have confidence in the
[1:48:29] Chair: town manager's assessment of this professionally. Thank you. So it's that now, and he's the GSD platform, so Harvard doesn't usually direct my bonus, so you know, I have confidence. So this guy, you know, aside from some something
[1:48:50] Speaker C (unidentified): that we just can't work with
[1:48:52] Chair: I mean, I'm looking at his age now, his design, you know, I like what I'm seeing so quickly, and I'm like, it's not about the box
[1:49:12] Eric: boxy texture, yeah, but it's also not over-the-top, right? It's simple, it would fit in. Yeah, I think, you know, generally has a pretty good lead on people, I mean
[1:49:31] Chair: like so far, so far higher that they probably talked to in the last few weeks, just saying it is
[1:49:51] Eric: With at least, with the architect, it is just he's going to do a retainer. He's going to use that to help bring some concepts, yeah, cleaner, more divine concepts to this board, to say I have a chance to meet him and make a decision.
[1:50:13] Chair: It was part of the eight percent, I mean the instructor manager virtual project either anywhere, and so you're getting construction management, somebody doing all the legwork.
[1:50:32] Eric: Like I'm very interested in ensuring that it goes forward, even doing some of the necessary to make this work, providing the grants to get it, but the experience and the track done already, I find it's unique and different from just, I mean he's done funny, he agrees with me, some of the red tape or what we'd like to achieve on this might not work. I mean it's very strict in terms of a scheduled timeline in order to get the funding and make it work, so yes, that's still in play because, but if you can't. Find all the other financing to make something work, that's always a backup option because a lot of experience there too. So that's part of the reason I would like to pull forward and Kyle and Dan work together on a good projects too, that was the other that I said.
[1:51:49] Public commenter: Everybody's good getting stuff done, but to be able to bill before the end of the year, I'll be ready for our next event, but let me spend there, oh, funding.
[1:52:01] Eric: Yes sir, yeah, and you know, honestly, like I had, I not had to deal with what I've had to deal with medically, I would have had to buy, yes, unfortunately I'm in such a.
[1:52:17] Speaker C (unidentified): Big business, yeah.
[1:52:19] Chair: We got six weeks or something, you know, nice and holidays, but well, they'll take our money even if they could complete the project, yeah. What was it, what was delivery dates, was it by the 31st now, while I'm.
[1:52:33] Eric: Looking at setting up retainers, so the retainers, yeah, I'll walk through a scenario in which you could do a presentation for the second to second, yeah, I see, great, we're gonna have our.
[1:52:46] Public commenter: Second this company in the north we go, so we'll get through it, I think we should share this.
[1:52:59] Speaker F (unidentified): I'd like a motion to authorize the town manager this time the design services proposal with primary projects, the memorandum of understanding with LV development partners, and the proposal will probably have to work, I'll second that, Rob.
[1:53:26] Chair: Kevin like something.
[1:53:29] Speaker C (unidentified): Are there questions out there, perhaps the only cost of the town is Kevin's labor, yes, grants don't pay for your book, yeah, which again the town doesn't pay for your working hours.
[1:53:44] Speaker E (unidentified): I don't know it kind of a bargain there is an investment yep ignore you
[1:53:57] Chair: Know other comments others appear it's for great all right they don't [Speaker E (unidentified): Security] Cameras more
[1:54:13] Eric: Than want to kick this down pick it up I would like to just say one
[1:54:19] Speaker F (unidentified): One quick thing and then recommend do kick this down the road okay which is that I did a little research several towns in Maine have run a foul with security camera issues several of them have been forced to remove some pretty strict facial recognition laws on the boats in Maine we have to be very fair the freedom of information access for implications cannot be taken because anything that is recorded stored is considered so
[1:55:08] Chair: These are inside and outside
[1:55:11] Eric: The building there they would be monitoring apparatus in this station and then just outside the building on the town office two exterior coming out and one in the except to be very but for what reason and how do you avoid that because we should be able to have some
[1:55:48] Public commenter: Security building safety so what was their what was their problem
[1:55:56] Speaker F (unidentified): They were we're not going to do that no but all the software now policy that right official record claims is strictly bigger so we want to be very careful we all love to chat in the parking lot after the meeting sometimes those video and audio recordings are public records if common subject of both
[1:56:36] Chair: Probably a lot of cameras
[1:56:40] Speaker F (unidentified): Now have on fidelity yes so that means any conversation was had in the sound office at lunchtime is full that's something we can turn off
[1:56:56] Eric: Well that's a taking an audio not yes that's another case where a feature was
[1:57:06] Speaker F (unidentified): Not permanently disabled and the town was sued because they could have been recorded in the mark so someone wanted them to record yeah they wanted to hear the conversations that were happening from the town geez just yeah the research I've done makes me very nervous it is a great policy thanks no but those are for insane abuse by someone who just yeah wants to cause a big problem yeah is stratosphere I
[1:57:46] Speaker H (unidentified): Know it's nearly over stratospheric I think there you go
[1:57:55] Speaker F (unidentified): Yeah sacro got in trouble your so
[1:58:07] Public commenter: Before we go down this path we should really
[1:58:11] Speaker F (unidentified): Yeah before we install any cameras
[1:58:14] Public commenter: Yep is that something that our attorney would have good knowledge of I'll be giving you I haven't
[1:58:22] Eric: That yeah I'm okay I wanted to get this at least on the yeah I was sitting as a future agenda for a
[1:58:28] Speaker F (unidentified): While so yeah I'd work that out trust me I love the idea I could have security cameras I'm not yeah advocating I'm just advocating that can we can say style black and white with the
[1:58:49] Eric: It's the version we went with is a recorded in-house, it's not on the cloud, it's recorded in-house on a drive. And after whatever date we set, it's tracked over. work yeah and the only and i didn't jive got by the giant memory stick one that was a 30 day or 45 to take remember i think i wrote 30 policies yeah 45 okay and i think i understand that it can be erased sooner the thing is you want to have at least some track record in case there is enough time to then realize oh i haven't been in the back of the fire station since I better be able to go back and check but
[1:59:36] Speaker F (unidentified): again every conversation the firefighters have
[1:59:42] Chair: whether on camera or near the camera is what the policy specifically says sure the policy
[1:59:50] Eric: specifically says these cameras are not recorded we do not record with the camera yeah video yeah policies and if somebody comes after us the policy is driven this guy I went around with it I returned it typically when these are more they
[2:00:14] Public commenter: usually do so yeah so it seems like the camera out something is maybe gonna has a timestamp on it for somebody driving by to go to the
[2:00:34] Speaker F (unidentified): back and go back to find out
[2:00:38] Public commenter: that driver was involved in it.
[2:00:41] Speaker F (unidentified): Yes, that's one of the reasons that several towns have gotten in trouble.
[2:00:45] Public commenter: That's too bad because, I mean, bicycles get hit at 5 o'clock in the morning and there's no lights and you're trying to find out who did it.
[2:00:56] Speaker F (unidentified): yes but the police yeah
[2:01:02] Speaker E (unidentified): you know they don't have the
[2:01:08] Eric: way i structured this
[2:01:09] Speaker F (unidentified): they can request that they can but that's the problem is it's public data which means we must give it to them we don't have an option
[2:01:25] Public commenter: it's also really important to make sure the cameras are angled so that they can report what we want to report yeah it's a great
[2:01:36] Speaker F (unidentified): policy it's just the implications of it of putting up cameras i think we should get some legal advice do a little bit more research and make sure that the language addresses and make sure that the policy would then cover us when they went through it already it is cautious you've tried caution tried with a lot of fun that's it and what it sounds like i'm trying to sound like we have things to hide we don't have things to hide that is not the point the point is i don't want there to be a scenario where somebody makes an offhand comment on their a lunch break that is used by someone to sue the town that is not okay do
[2:02:41] Public commenter: i need a policy for my
[2:02:43] Eric: ring door bill we might probably talk to your attorney i think so
[2:03:01] Chair: Moving on to 8A, AP Warren, 427 AP Warren, $451,609.00 in the penny.
[2:03:14] Public commenter: I'm going to fix that right now. Second.
[2:03:18] Speaker H (unidentified): Great, thanks. Any comments? Yeah, I just, so why are we still getting chargebacks here? What's going on?
[2:03:24] Eric: Still have connection, yeah, but no, so let's just be that a commercial like my connection fees point 47 is 43 or 41, yeah, 49, so that's a little more. Yep, okay, and then the 157 must just be, you know, that's the street lights. Don't get streetlights are not part of that program.
[2:03:50] Speaker F (unidentified): Okay, great, we can't meet up.
[2:03:54] Eric: Them, it's just a flat connection, yeah, whatever, how much, why one of them is 43 and one of them is 48? I could not tell you, but because they're like, I got numbers, and another one's 49.
[2:04:08] Speaker H (unidentified): Okay, yeah, that's, thank you, I mean, maybe we used a little bit, maybe it went over.
[2:04:14] Eric: Over six dollars generating so much, we're well ahead of where we need to be, what, that's the council, thank you, thank you, and
[2:04:36] Public commenter: Most of this is the school did.
[2:04:45] Chair: You move it, yes, and yeah, okay, great, yeah, good, yeah, okay, all those in favor, yeah.
[2:04:54] Eric: Last week, that's part of the reason why you don't have minutes today, and I just want to thank our election and ballot clerks. They ran such a smooth, clean election. Last week, a lot of work was put into it. Alita, it shows how efficient everything was. An incredible absentee ballot turnout,
[2:05:25] Speaker E (unidentified): The biggest one since COVID. Wow.
[2:05:31] Public commenter: 630, I think it was. Oh, it was 980 voted here.
[2:05:37] Eric: Yeah, well. Well, 1,300 voted.
[2:05:40] Public commenter: Oh, that's right, I was just thinking that, yeah. Yeah. 1,300, okay. I'm like, wait, no? Yeah. Wow. It was a significant turnout.
[2:05:48] Eric: And we as a community are very fortunate to have such good community staff that's showing the show and saying it, so thank you to them. I also want to thank Thomas for assisting with the setup and Ben for helping me with taking it down after. Who was so quick that I had to sit here for another hour before the hours were up. Thank you both. Wednesday is Veterans Day, so the office will be closed in observation of that. We take this opportunity to recognize those who served in the Armed Forces, as well as those who continue to serve, who are grateful for their service, sacrifice, and dedication. Education for years, enjoy Lincoln Academy, it's having a public exhibit that are, they're looking at high school students that are having a public exhibit at the
[2:06:47] Public commenter: Daryl Lauren, and thank you.
[2:06:52] Eric: That's on November 16th from past DM. There's a link to a flyer in there. It gives you a little more information about it. You're not able to attend, you're not the coaches will be up all week at Coastal Rivers, and you can access them during their public hours from back and forth. The Great Salt Bay Sanitary District is using on this space on Wednesday, November 18th, to have a public hearing about their proposal to increase sewer rate for January 1st of 2027 as well as January 1st, 2028. So that public hearing will happen on November 18th. That is not a board that this board oversees. That is a separate multi, sorry, quasi municipal agency. So they're using our space, but they are a separate board. Our residents recognize it's not this board making it, so you need to consider board makers Newcastle. Next we're going to have another session next Wednesday as well, but it's at the Harriet Clubhouse. Has asked some of the residents to pull together a traffic calming effort, bicycle coalition, and the DOT will be joining us to have conversations about a install event we could do next spring or summer that could give some examples of what could be done and allow the community members to think about what they want to happen between the two buildings. That's happening Wednesday number 18 keys from 5 30 to 7, so you can make it here for the public hearing and then immediately drop over to real fast so you get there and probably speed, oh right, traffic. And then we have doing the things basket is working with department with the state country's church on Academy Road, our 18 of them. They'll be picking up on Tuesday, November 24th, 10 a.m. If there's any select board members, one or two, who might be interested in helping me unload, could be fantastic. And if there are families who would still like to be back, St Patrick's characters told us they still have several available baskets, so which is called town office 563-3441, and signing up is complimentary. Just let us know, we'll add that from 18 to 19 to 2021 21. Now that I'm hands get raised, so I don't mind carrying 21. There is the volunteer service fellow. I've learned about this program, Andy and I are talking about exploring a joint application. We have a fellow for a year or two year program. The cost of this community is better than 200 $500, so that Talking about as part of the just committing to closing stipend to help work, so If we were able, if we were to be successful in getting a fellow, Each time you're looking at each attribute about four Grand to hire this person for a year, a good deal I thought. So I wanted to let you know that I am moving forward that application. You know, as I think about communication needs are going to continue to do these new tasks we talk about, this potential housing project. How can I help? How can I help somebody help coordinate and plan those events? That's sort of where my mind is going with this person, some of the resiliency things we've been trying to have happen and launch. You know, how do we communicate better about these batteries, the VPI, like all these things that are taken off. I want to, I want to, I'd like to have somebody assisting us. Is that a planner or can I have someone just be done with a fellow? There's a lot to talk about. What is the background of a fellow? They're usually right out of undergrad, just graduating, government kinds of things. Yeah, or not, or communication. I mean, ideally I'm just looking for somebody who's ambitious and interested in local government or look interested in age, it's really what I interested in, and good. You know, the Dan or Scott going through their complement, sorry, comprehensive plan implementation, they have all these subgroups, how to figure out how to staff that. So part of that role would be helping them with that. Obviously we have plenty of things an argument plan that we worked on, so there's not a lack of work, identifying the right person to help us do this, and there's only one or two people, so yeah, we're with somebody. Would you might still do that too. Yeah, I mean, the summary term is a specific project. What I see this person doing is building the structure to have half-time support and either identifying somebody in our staff and how to take over elements of that, or is that the time in which we look at, you know, testing waters.
[2:12:48] Public commenter: Cool. Inexpensive. Right, on the cheap. That'd be cool.
[2:12:57] Eric: Then I also, I continue to put the battery lending program in my manager's report. I'm going to sit there until I have more people signed up than I have batteries, so. So
[2:13:12] Public commenter: yeah that's on the next it's
[2:13:22] Eric: not a food one, okay, so 5 30. I'm not cooking food. Yeah, the graves situation, it's winter coats. No, there's a group, there's a Renee in there, 's a lot of running, early end of November, it's cold enough to be okay. Well, those doors you can probably, they're not really conservative on the heat. No, that's why let me turn it, turn it off. I need to schedule that. Thank you for the reminder. Okay
[2:14:02] Public commenter: thank you thank you
[2:14:07] Chair: Okay, without objection, meeting is adjourned at 9 15.
[2:14:14] Eric: You know, park three trucks right on the corner, have a building held in the air, yeah, and then everybody slows down the dock because it is pretty impressive right now, yeah, that's what, yeah, and so what I anticipate happening is we should be negotiating the approval of the budget to become this number 11. Right now there's another resolution into next school year for next time.
[2:15:11] Speaker C (unidentified): Why this?