Harpswell Select Board Reviews Solar Feasibility and Next Steps

2026-10-22 · 38m · Source: Select Board Workshop with Energy Technology (10.22.26) (Town of Harpswell (YouTube))
Speaker identification was not available for this meeting (plain auto-generated captions only) -- this transcript is not broken out by speaker. Home addresses that residents give are left out of this page.
[0:00] Start off. How we look like he's ready to go? [0:05] So I'm Howie Marshall. I'm the chair of the energy and technology committee. Jack Rowland is another member of the committee and Jeff Wooten is a town resident who's done some work for us on the possibility of installing solar for the towns. The town infrastructure use I always worry of I say the towns electricity that people are thinking we're going to get [0:28] 10,000 people's worth of electricity out of them. Now this is The goal is to save the town the money of buying electricity from CMP. [0:40] So [0:45] Jeff put together this feasibility report a while back and it covers the you know what the town could do to cover the towns electric bill. It's mostly this building, the recycling center, street lights are major portion of that and then a number of other smaller meters. [1:07] Jeff I think has a revised spreadsheet on the on the projected cost. [1:19] We ran the ran his report by a couple of outside people. Jeff Sparrow is an energy consultant the town has been using and I spoke to some people at Revision. They both said that they thought that the price that Jeff had estimated was low. [1:41] The difference is you know in how much it's going to cost the it's not that they're saying oh god you wouldn't want to do that it's going to cost too much it won't be worth it. It's just that it's not quite as good as Jeff's original report. the [2:01] the idea is to build a a solar array that we would then get credits from CMP for it. The [2:17] the original report was to build it up on the covered landfill up here, which is a popular place to do that sort of thing. It makes it more expensive to build it, but it tends to be land that's not good for anything else, and no one complains you're ru- ruining my view. So, that makes it attractive and makes up for, you know, can make up for the fact that it costs somewhat more. [2:40] Christie was a little concerned initially because she thought we were really rushing into this. And the rush was more that there were incentives that we could get that could cover possibly half the cost of it. But, it has to be operating by December 31st, 2027. And that [3:00] that was another thing that revision said that the permitting involved especially for a landfill with the through the DEP just made that seem really impossible to get that done by the end of next year. so, [3:19] Also, I just want to say I think I agreed with the process piece that Jeff Sparrow laid out that if the town wants to do a project, it should issue an RFP. It should go through that whole process. And there was a sense that everybody wanted to move super quickly, and I just felt like we needed to have a thorough process and do our due diligence, you know, and explore [3:41] the issue. [3:41] I think we were on the same page on that. I think that this was not that Jeff was proposing to go call a contractor and start digging. It was that this was a plan that showed that the town could save a lot of money over the years by doing this. The big advantage is we're we're currently signed up with a [4:04] couple of solar farms. It was one. Jeff Sparrow reorganized that so that the different meters are being fed by a different by two different solar farms. So it's just the way all the complicated details work that turned out to be better. those get us a discount off of the CMP price, 15% or so. [4:29] but as the as the CMP price goes up, those solar farms just get to collect more money from us per kilowatt. So, it's you know, the advantage of owning the system is that as the price goes up, it just shortens the payback period because, you know, we're just generating our own power and [4:51] shipping it off to CMP and getting it back from them, but basically we own the power that it generates and that then saves the town money. the difference in how much it's going to cost, you know, makes the difference between does it take 8 years or 10 years or 15 years to recoup the price of it. [5:14] But it's good for 25, 30, 50 years and I'm Jeff pointed out to me a little while ago if it gets to 25 years, maybe some of the panels are bad, you replace those panels, you keep going. So, it's the ongoing insurance and maintenance on it is not very much. [5:34] you know, so but we should get going on it because we have a Okay, sorry that we this last meeting took longer [5:42] That's all right. I'm I'm done, but we've got 35 minutes to do this. [5:46] Okay, so let's let's let Jeff give us a quick description of what he thinks we need to do. [5:51] thank you all. just as a quick background, I got into the solar industry in 1975. So, I've been around this industry for fairly long time. I was on President Carter's energy advisory board. I was on Governor Jerry Brown when he was dating Linda Ronstadt at the time. [6:11] Hm? [6:12] That's it. I hated him for that. [6:14] [laughter] [6:15] Well, it turned out I worked with Ronstadt's hardware, so I talked to her brother to get to Jerry Brown, so I helped get the first tax credits established in California. very successful career in Massachusetts, which is becoming the solar capital of the United States because of the incentives that we started down there. It's really incredibly good. [6:35] I was hoping Maine would continue doing the same thing up here, but I understand the Congress has sort of pinched it a bit. the key thing here is having been on the contracting side of the business, it was always better to own the system. So, we as solar contractors always push solar power purchase agreements, which is basically what you have here in this town, where we're going to lease the land from you for practically pennies, [7:02] but we're going to give you a 15% discount on electricity. And that's because we'll make our money back in 6 years. With the tax credits, the incentives, and the depreciation we can pay for that system in less than 6 years as a contractor. So, anything after 6 years and you've got 25-year contract somewhere. I think Harpswell Community School just signed a 25-year contract. [7:26] that's 25 years of just getting 15% discount. Now, electricity rates are rising rapidly now, and we all know why. the fuel costs are going up, pure and simple. Green Mountain Power just announced a 22% increase to their customers, and they're going nuts. [7:45] You're going to say something, Dave? [7:46] No, I'm just like 22%. [7:47] Yeah. So, my forecast is I took 20 years of CMP's rates and found that they average 3.4% per year, which is pretty minor, but it still amounts to a fair amount of money increasing every year. So, as we look at this report, [8:08] I was like I looked at it at power to power enough for all the buildings and all the electricity that's used in Harpswell. That does not count the new building that's going up. so, what I would apply for here would be instead of a 150 kW system, it's probably a 200 kW system with CMP just to cover my bases. [8:30] it would produce in this case 204 meg watt -hours per year. based on my economic analysis, it's going to pay for itself in 8.8 years, and after 30-year return to the town approximately 1.75 million dollars. [8:48] Why is this report matters now? Once idle land, rates are always rising. Has everybody's electric bill ever gone down? Nah, didn't think so. positive from year one. And how is that happening? Because we're basically locking in and we're starting to pay back the system. And we're locking in today's pricing. So, as CMP's rates go up, [9:11] their payback to the town also goes up. So, if they're going up to 18 cents, 19 cents, 20 cents next year, we just keep paying those increases back. [9:25] Why we should act now? Rising volatile utility rates. I see the volatility lasting at least another year. When utility rates raise pricing, they very rarely apply to decrease pricing. they will on occasion to look good on face value, but right now the grid is has requires so much [9:47] infrastructure work that the grid itself is it's like train tracks right now. they need to be upgraded and they haven't done that for quite some time. Last year the solar industry installed 96% of all new power that was established in the United States. So, solar is outpacing utility companies right and left. [10:08] it's a financial return and it's a productive use of otherwise a useless asset is how we said. Energy independence, resiliency, and environmental leadership. One of the things I always like to do since we do have the school in town is to put up a display inside the school that teaches the kids this is how solar energy works and they get to see it happening. [10:28] They see how much it's producing, etc. But, it also teaches kids what solar energy is about. So, it becomes a learning site for them also. [10:39] Site was already built for solar. Now, I had picked this originally, which everybody knows where this is. Why? Because it's plenty big enough. I need about an acre of land. And that's it. When I went up to the transfer station last weekend, I think it was, I talked to Uncle Pete. and he was pointing out the land that was just across [11:02] the weigh station that's also part of the landfill. That was a nicer piece. I got the Why is it nicer? Because it got closer to the three-phase power that's running down Mountain Road. So, this can be oriented again right across the street or across where the office is. This was just initial layout. [11:23] It was a 30° tilt pointing directly due south. No trees at all, so we don't have to cut anything. It was just five rows of panels. Now, these were 660-watt panels. We don't know what's going to be on sale next year, but we want to buy American-made panels because we get an extra 10% return from the IRS. [11:44] So, despite using American-made panels, we've got us another 10% discount. [11:55] Core system specifications, I'm not going to go into the details on this. what I used was 10 power inverters, etc., etc. Balance of system wiring. Core system class, this is how we came up with the pricing for the system. basically, the PV modules, the string inverters, the installed landfill [12:16] racking is the most expensive part of this at about 70 cents a watt. DC electrical the balance of system, which is what BOS stands for, monitoring, communications, metering, this is what allows us to monitor the system and see make sure it's working properly all the time. site preparation and access, [12:36] mechanical installation labor, actually the cost of labor to install the system, electrical installation labor, yes, that would be electrician, engineering design, landfill specific evaluations. So, we have to get a civil engineer to actually look at the property and tell us what cap weight we can afford. [12:58] But, most of the cap weights are well within the balance of putting ballasted systems, so they're ballasted concrete systems to hold the racking systems that which hold the panels. permitting and environmental compliance, utility interconnection, I had boosted that because I wasn't aware of what the costs were for CMP and what the utilities require. [13:19] I balanced it based on Massachusetts, which was about 35 grand. Here, it's going to be about 2 grand. So, there's about a 30,000 plus dollar savings already. Mobilization equipment management, and of course commissioning and testing and closeout. That brought the total price to about 532. [13:40] By the time I apply the 30% IRS and the 10% the price should be somewhere around the 320. I forecast 350,000. [13:54] Questions? [13:58] I don't know enough about it to ask any questions. To be honest with you. [14:02] I think this is my third time sitting through this presentation. [14:05] Oh. [14:05] Well, why don't you ask questions then? [14:07] Yeah. [14:07] Yeah. [14:08] No, it's what do you think of of the two folks that Howie has spoken with? I mean, and the cost difference. [14:19] Well, if you look, we're at about 554. [14:26] 484, 450. which is totally in reason. [14:32] So, and [14:33] cost being 532, but then you What they didn't take into account was the fact that there's a 30% and a 10% discount. [14:40] And the rear landfill, the one up back, is further from the three phase. [14:44] Yes. [14:45] So, that's complication or extra cost? [14:48] That's not It's an extra cost. [14:49] Yeah. what else do I want to ask? [14:56] I don't know. Keep going. [14:59] Okay. How long a life this is going to have? I did a system in Beverly, Massachusetts, at the Beverly High School in 1983. Still operational. So, 25 and 30 years is a highly reasonable aspect for length of time of running. [15:19] So, it's it's just time. Just keeping the system producing solar. [15:24] If I can just clarify one thing that Jeff said and probably went right over everybody's head and that is the question about the ballasted mounting and that is because it's a capped landfill you can't drive anything into it. You can't dig any holes. So basically you make a big bunch of concrete on top of it and mount the stuff in that to just sit on top of it and that's what he was talking about the you have to get the loading factor of how much that's all going to weigh and it's got to weigh enough that it doesn't blow away but not too much [15:54] that it hurts it. So that's and that can make the construction more expensive than [16:00] Well, plus this capped landfill is more than 20 years capped, right? [16:04] I believe so. It was a long a long time cuz that matters as to whether they're worried about the settling. [16:09] 1993. I think it is, yeah. Yeah, that's what I think it's it was '93. [16:12] And you know what? I question what's in that landfill because we at for a long time [16:17] no. [16:17] for a long time we didn't have a market for tin cans and we were crushing them up into cubes and just burying them up back and I think that's mostly what's in there is tin cans. [16:28] Well, needless to say it's settled significantly when a civil engineer guy comes in he's going to say you can pack a truck on top of this thing. [16:35] yeah,. Yeah. Yeah. [16:38] Now the option was I know this came through and I feel for residents because I did put a lot of systems on landfills around Mass. By the way, I did go to town meetings and a person came down and said, "But I picnic there at that dump." To which I commented, "So you can just leave your trash behind now." [17:01] I wouldn't picnic up there. There's so many ticks in that field that on that landfill. They'll picnic. [17:05] Does that cause take in the installation and everything? Does that take into account like storm water runoff and stuff from water that when it rains hits the panels and runs off. Like that's there's a lot more impervious surface up there now and solar panels. So, I guess what happens to the soil underneath it of it being a landfill? [17:29] Is there any concern? [17:30] No. None whatsoever. Well, it's an impermeable cap that's on the [17:35] First of all, it's a hill it's a hill already to begin with and they probably got rain coming down on it. So, and one panel because there are gaps between panels. So, you're only going to get one panel size of rain down to one spot. [17:48] So, you're not going to you're not worried about erosion underneath that one panel? [17:52] Right. [17:52] What happens to the panels when they outlive their life? How are they recycled? [17:56] Good idea. Most of them right now are getting sold off to people who have can't afford them much because they still operate. So, right now they're getting reused. [18:08] That really answers my question. [18:10] That's what I'm saying. They aren't They don't go anywhere. They just keep reselling them. [18:16] Well, eventually like it's got to stop working. What happens then? [18:20] What happens then is that quite frequently we've requested contractors to put in costs for decommissioning a system. So, at the end of the life of the system they've already put the money in to come in and take it out. [18:34] But what is [18:35] Do they recycle them? I don't know. [18:37] Oh. [18:37] I [18:38] I know it's been a big question. I just [18:42] I'm more concerned about batteries. [18:44] Huh? [18:44] I'm more concerned about batteries being recycled right now. [18:49] Does this require battery storage in order for the battery storage bank in order for us to be able to store the power when we're not using it? [18:57] No, we're using the grid. [19:00] You just feed it into the grid. [19:01] Yes. [19:02] Yeah. [19:02] Explaining how it works, I think is helpful. It's like an It's a you send it all to the grid and then we use it back and then we have to use it all within a year. Will you explain that? [19:13] Yeah, so [19:17] I think it's pretty much the same for a commercial setup. What we qualify as a commercial customer. But basically you generate the power you use some of it locally. although, you know, it could just be that all of it is just dumped into the grid through a meter. [19:37] They measure how much how much energy we put out. We have meters that meter the street lights in the buildings and everything, and you get to use the credits from what's been sent out onto the grid against what the usage. yes, there's a at least on the on residential arrangements, there's a 12-month [20:00] expiration on that. Although, I did find out recently that it doesn't just go to CMP. It actually goes into some low-income heating plan or something. But typically what you do is you know, the size the size of the system what you want to do is size it so that you don't generate extra. You generate a lot during the summer [20:22] and not very much during the winter, and then you but you get to use those credits that you generated in July and August in November and January and the like. [20:34] [20:37] I think that ans- that answer your question. [20:43] Anything else? So, we could put in a battery system, but it would be a lot more expensive. [20:49] So [20:49] We'd totally be off the grid. [20:51] So, you could You could do that, but you're talking a 4-hour storage system. [20:57] Yeah. [20:58] Not days. [20:59] Yeah. [21:00] Right. But now you know, over the course of the year, you end up like I my house I've got solar panels and in the you know, in July and August we're just cranking out electricity onto the grid and then it gets to end of December, beginning of January we've run out of credits. [21:21] We pay an electric bill in January, February then they start generating just enough to cover our bill and then during the summer we build up the credits again. And [21:34] we're not using a battery at all. I talked to them when I put in that system and they they right now because you get credit for everything you put out onto the grid might as well just do that and not spend the money on the batteries. They said in 15 years we're going to have our agreement on the on the solar panels is for 15 years. So when that time is up we're going to have to renegotiate and there's all sorts of talk about not giving you one-for-one [21:58] reimbursement. You put one kilowatt hour out, you get half a kilowatt hour of credit or something like that. They said in that case, you got a battery. During the night you run off your batteries, you know, and by 15 years the batteries will be better. I went and saw Newcastle has a fire station where they covered the roof with solar panels and they put 24 batteries that are about this big. [22:24] Four stacks of six down in the basement. This is the building can run for three or four days on those batteries. so if the power goes out from the storm and they're not using the solar not enough sun to get a lot of power out of the solar panels, they can run off those batteries, but the problem with batteries is though it would only cover the buildings on this campus. [22:48] It would only be the meeting house, Mitchell Field, all of the other town-owned properties. [22:52] Right. That's the stuff that goes out onto the grid. The credits are used to pay for those meters. I mean, another thing to consider is do we want to incorporate this into the emergency services building as an alternative. you know, it is you know, and include a battery plan on that [23:14] like the Newcastle fire station, which they're using as a warming center. If they lose power, they've got a place that's got lights and power. and so that I mean, that would be another thing to consider is something like that. Having the Having the solar panels closer down here might mean that it could directly power the recycling center in this building. [23:35] Whereas if it's up at the up at the landfill, you're going to have to run it through a transformer up to street voltage, which is 15 or 19,000 V. Down here and then back through a transformer, essentially feed it onto the grid and just pull this pull the power in off the grid. and so, you know, you wouldn't be able to do a warming center kind of thing you off of that. [24:01] The systems that have batteries in them have fancier inverters that take the DC power from the from the panels and create the 240 V or 19,000 V or whatever. They're fancier because they can operate without any connection to the grid. They can charge the batteries, you run off the batteries and so on. It's It's a more complex system, but again, you know, you get what you pay for. [24:23] You could have You could have something where you could power the building when the power was out. On my house, I have the basic type of inverter that the only thing you can do is create 240 V and whatever's extra beyond what my lights and refrigerator are using goes out onto the grid. And if the grid isn't there, it just shuts off cuz it'll just blow up if you don't have some place to dump that other 8,000 W. [24:49] So, the way I would do this if you want to consider that building, I'd still add it to this system, the solar. And you can put batteries into that building at any time you want to, and you can basically charge your batteries from the grid. So. [25:05] Instead of a backup generator. [25:07] Yeah. [25:07] Yeah. [25:13] I guess the only other question I have is you have far more knowledge than I could ever dream to have on this. but our energy [25:25] than I do. [25:25] Yeah. Well,, I'll stick I'll try to stay in my lane. what I guess are your thoughts on what our energy consultant said on how much more expensive he thought this was going to be to build versus what you've projected out? Because I'm hearing from two people that both know more than I do saying two different things. [25:48] We're all in the same ballpark. They're just not counting the 40%. [25:52] And then with And then with that 30% where we would have to complete construction by December 2027, right? [25:59] Complete. The construction part of this project isn't the issue. [26:02] Right. It's the [26:03] be done in 3 to 4 months at the most. [26:05] Whereas the permitting [26:06] permitting. And it's primarily it's the DEP and interconnection, which I propose starting to work on it now. [26:14] But then I mean, I think you know, even if we wanted to do this, we to do it correctly, you'd have to send it out as an RFP, which also elongates the process. [26:23] And get it approved at town meeting. [26:25] Right. Which puts us into March, and then you're I mean [26:29] Right. That's That's why that seems like that's not, you know, [26:31] It's not feasible really, I don't think. No. Cuz even if we didn't submit an RFP and we just decided to sole source, we'd still have to get a town vote. [26:42] Yeah, and the thing is, do you really have enough information to go forward and ask the voters for you I think your figure is 385,000. Did I see that up here? [26:51] Yeah, somewhere around there. [26:52] So, I mean, there seems to be a lot of questions about is that estimate low? I know you're talking about the percentage differential, but we really [27:00] What happens when they allot 380,000 and then we don't get the permitting in time and all of the sudden we lose that 30% [27:06] enough information to ask for that amount of money? I don't know. Margaret's been working with the Island Institute and potentially bringing in somebody with energy expertise. Do you want to talk a little bit about how they evaluate the town and [27:23] Yeah, so [27:24] what benefits we might get from that in terms of being able to make well-informed decisions? [27:29] We're working on what's called an ETIP, Energy Technolo- [27:34] Innovation. [27:36] Do you know that acronym? [27:36] Energy Innovation Technology. [27:38] Energy Technology Innovation Partnership Project. So, we were approached by the Island Institute to apply for this federal program where they basically do a deep dive into our community. It takes 4 to 8 months, so it would be done by the end of 2027 ideally, and it would give us kind of it would it 's like a sustainability plan or a resiliency plan for energy, but it looks at distribution and access and works gives us a better [28:08] working relationship with the utility. I think it would cover resiliency projects like you know, solar or whatever we were interested in. but that's something that we're looking for next year and the end of that the end product would be kind of like a list kind of like the comp plan is for land use, but it would be this list that we could kind of pick our topics that we would want to take a deeper dive on in future years. [28:36] And like a resilient energy resiliency kind of work plan. [28:43] You know, covering a grant that covers 50% of our cost is very attractive. I would like to know the possibility of that grant continuing beyond the end of 2027. I'd like to know I don't know maybe no one has that answer. I don't know. [28:59] Can I jump in as public [29:01] Please do. [29:01] yeah. I just wanted to chime in and say let's not like let's not get hung up on like is it going to be free after 8 years or 15 years? It is going to pay for itself for sure. We're already paying an electrical bill. We're just going to switch to paying this stuff and like I don't know. yeah, the these are it's real money, but like let's get like we should have done this 15 years ago. [29:28] Yeah. [29:28] We would already be paid off. Let's do it today so it could be paid off in 15 years. Let's get the ball rolling and not study this to death and not move. And you know, maybe we'll lose another 10%. Whatever. Like it's Yeah. The panels don't really Yeah, it's just we're already paying the electrical bill. We're just going to switch over to what we're spending that money on. [29:51] Instead of just throwing it away, we're going to own a thing at the end. It seems like a no-brainer to me. Just wanted to chime in with that. Thanks, everybody. [29:57] Good point. [30:02] Anybody else? David, Matt. [30:06] [30:08] I don't know next steps going forward would be going out for an RFP I would think. [30:15] who who [30:18] I think next steps would be asking the public if this is something that [30:23] Right. [30:23] Because I mean [30:24] Well, that's the thing. We need a public [30:26] buy-in. [30:27] An RFP would give us the costs, the probabilities, and all of that things to bring to the public. [30:32] I'm trying to think if the public would go along with it. [30:36] Right. [30:37] Yeah. [30:37] Based on I mean and I know it was Mitchell Field and that was much different. That's a much different place. Like this is far more feasible and appealing than putting them at Mitchell Field. I think we all agree with that, but [30:48] No, it's a good spot for them. [30:49] Yeah. It's [30:52] This RFP is for [30:55] the civil engineering? No, the RFP for the project to do this. [30:59] [31:00] But you have to go through town meeting first, right? [31:02] No. [31:02] No,, for the RFP. [31:03] You would find you would get all the answers and get you would get someone who would do this for a certain amount of money. a contractor, and then you would take this to town meeting and say, "Do we want to go forward with it?" Also [31:15] that we'd have to budget for the consultant? [31:18] Right. [31:19] For the RFP. [31:20] Yeah. [31:20] Yeah. [31:21] But we don't have the expertise to put a RFP together for [31:25] No,, the RFP the person that we hired through the RFP to like do this feasibility study, I think is what you're saying. [31:33] No. [31:33] No, I think he's talking about [31:34] building the He's saying the feasibility study's been done. But we would go out for an RFP to get some proposals for doing this and how it how what would it cost, how long is it going to take, blah. Take that to town meeting. [31:48] So you're talking about an RFP for construction [31:52] What is the proposal? [31:53] which could validate these prices [31:54] Right. [31:55] that are being proposed. [31:56] Yes. And that doesn't cost anything, an RFP. No. [32:01] No, but people aren't going to lay their cards on the table unless they know kind of specifically what we're asking for. [32:07] Exactly. [32:08] And that we would be willing to move forward with it subject to a town meeting approval because companies are going to have to lay out information and figures. [32:16] this is what we're asking for. [32:18] them money. It might not cost our us money, but [32:21] We haven't validated that. [32:22] Right. That's my issue, too. [32:24] RFP would validate that. [32:26] But I see what I agree with what Christie and Margaret are saying that a company's not going to spend money to submit to our RFP without the guarantee that they even have a chance of getting it. See, they spend even a couple thousand dollars to submit an RFP. We accept that as a board, bring it to the voters, and then the voters vote it down. [32:46] Like we've just [32:47] Right. I'm I'm going to say normally [32:49] face off to spite our nose going forward, too, you know, because then we put a bad taste in any developer's mouth. [32:56] Normally we [32:58] say subject to, you know, town meeting. [33:01] Normally [33:02] Something with funding. [33:03] I understand that normally we do it the other way around. We develop the funds and then we go out for a proposal to get it done. and I [33:11] [clears throat] [33:11] I don't know if that's the way to do it. I don't know. [33:14] Well, what How much would you ask the voters for right now based on this one [33:19] Probably 400. [33:19] feasibility [33:20] I would I would ask the voters for the for the funds that the proposal is asking for. [33:25] 400,000. [33:26] So, 400, 380 I mean, what [33:29] I think you'd have to ask them for without that 30% discount even on the high side and hope in low. [33:36] Yeah, 532. [33:37] It's easier to answer I've figured it out in my very short tenure here. It's easier to ask for more and return some of it than to come back and ask a second time for more. [33:48] That's so true. [33:49] You've been around long enough. [33:50] [laughter] [33:50] And it would probably be a bond, so you know, you just got to be able if you want to go that route, you got to be able to support [33:58] pick up a couple of things, yeah. [34:01] My suggestion, I don't know which way you think you can go about this. Again, doing an RFP, you could have an RFP ready and issue it right after the town meeting. Expect results back in 2 weeks to get to work within a month. You would have finished by the end of 2027. [34:20] But beforehand, now is what I'm saying, it's the end of October, to get a civil engineer to do a DEP study. Basically it's called an environmental study assessment, ESA. on the on the dump, but we don't have the funds for that. We don't have [34:39] Right. [34:39] Well, without going to town meeting and getting the money to do that. [34:43] We have to wrap this up. [34:44] Ann might have [34:45] Do you have a speaker for that, Jeff? What you're [34:48] We can wrap this up about 18 Oh, yeah, we do. [34:50] 100 or 18,000? [34:52] We're running out of time. [34:53] I don't know if you heard that. 18,000. Jeff is suggesting that would probably be an $18,000 civil engineering study. [35:01] There we go. Mary Ann might have something to add to that. [35:03] I just want cuz I'm on the resiliency committee. We have the spare of fund. [35:09] Oh. [35:09] That we could go for right now. [35:13] If it's not too much. [35:15] That's a question for [35:17] So, anyhow, and that's what we're just working on the new budget, but right now, what we have in there, we could push out to get this done. [35:27] I think the RNS and the ENT committee need to speak to each other and get We do. We've been having joint meetings. I need I think you need to speak to each other more and hone this a little bit. Yeah. [35:38] Thank you. [35:39] And is that for both of the landfill areas up when you're talking about exploring having a civil engineer explore that, are you talking about [35:47] like to go back. I'd like to go back and look at that other area where I really liked where it crossed from the weigh station. You think that one's big enough? [35:55] think it's as large. [35:57] You do? Okay. [35:58] It's if it's an acre, which I'm pretty sure it is. [36:01] lot smaller. [36:02] It's a lot smaller. [36:03] Yeah. [36:03] But I only need about an acre of land. [36:05] And it faces south. [36:07] And it faces south. Yeah. [36:08] It's up on the hill. I remember when they took the stumps out of there. Beautiful soil. [36:13] So, that's a potential funding source, what Mary Ann raised for the civil engineering if the board is [36:19] And the other thing is to submit your interconnection to CMP immediately. [36:28] Is there a cost associated with [36:29] that? [36:30] Probably about 2 grand. [36:33] Would we be able to use our solar consultant to help us develop a to help us develop these ideas better? Is that something that we [36:44] I you know, I was our solar consultant who recommended the RFP approach. So, I mean we could ask him what he thinks about, you know, investing 20,000 in exploring [36:55] Right, cuz I mean that's my only fear is invest that money and then it does get to town vote and for some reason the town vote gets shut down, we've just wasted $20,000. [37:06] We didn't waste it. We did upfront checking first to make sure we were giving them a good idea what it was going to cost. Another thing I want to just mention it would be great if you could get that on your next town [37:21] The That's what I'm I'm going to recommend that we bring it up next [37:24] Yeah. [37:25] Put it on the agenda in 2 weeks. [37:26] 2 weeks. [37:27] We'll have time to look at it. [37:28] And your committees will have met and discussed [37:30] So, we're going to meet on the 5th? [37:33] Yep. [37:33] 6th? [37:34] No. [37:34] Well, no. The 5th I think is 2 weeks from now. Is that right? [37:37] But we but we're going to meet next week. [37:39] Next week on the 27th. [37:40] has to vote on us doing this. We can do it if we work together really quickly, I think. So, that you can get it get it to [37:50] If not, then we'll kick it down a month then. [37:53] Of course. [37:54] Yeah. [37:54] [laughter] [37:55] Either the 2 weeks or 4 weeks. One or the other. [37:57] Yeah. [37:58] So, in the meantime I got to put an end to this. [38:00] Yes. [38:02] We got to reset up. Well, we have another meeting in 5 minutes. [38:06] You got to change your brains around. [38:07] The chances of the town people not approving this