← Back to MaineScanner

Kennebunkport Planning Board Approves Seawall Repair and House Rebuild

2026-11-04 · 1h 2m · Source: Kennebunkport Planning Board (Town of Kennebunkport (Town Hall Streams))
Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[5:05] Speaker A (unidentified): You going to turn on this screen in front of us? We will when we're ready. All right, we're ready. Good evening, and welcome to the 4th of November version of the Kennebunkport Planning Board. And we're here this evening. We have four members in attendance. George has called out at the last minute, so we do have a quorum. Good to go. I'd like to begin by asking about minutes. I saw we have our new board secretary slash admin support has provided us with minutes from the last meeting. Did you get a chance to look at them? [5:55] Speaker B (unidentified): I did. I sent comments to Nadia. I don't know how you wanted to handle that. All right. [5:59] Speaker A (unidentified): Do we have changes then? [6:04] Speaker C (unidentified): I forwarded the comments over to Callie, who is here in the audience. You're here? [6:11] Speaker A (unidentified): I didn't see them. So are they substantial that we shouldn't delay this or do you want to approve them with your comments? [6:22] Speaker B (unidentified): well, I Try to capture all the actions that we discussed and I think a couple were missing. So I mean for me Their meaning generates actions. Yes, we should we should note them and then close them. So I would You know for the sake of time just wait. Do we have a chance to sure? Okay, [6:44] Speaker A (unidentified): So we do have some edits pending, and we'll defer approval of these until the next meeting. Kelly, thank you and welcome. So we'll begin with revisiting Rev. Major 260003, Snapdragon Lane, which is a continued initial review from the last meeting. Who's here to represent the team? My [7:25] Speaker D (unidentified): name is Howard Schultz. I'm the applicant and am not prepared to present tonight because I thought Mike from Teradyne would be here. Does Dan or Nadia know if he is coming? [7:42] Speaker E (unidentified): We have not heard from anyone from Teradyne on your projects. We actually did not include any updated memos for the board as we didn't have any new information from either you or from Mike for your project I know that the major outstanding item [8:02] Speaker A (unidentified): as I recall was an overall plan right was going to be prepared and presented we do one of two things we can defer until the next meeting or we can if you want to hang out for a little while okay thinking he might show or make a phone call to him, we can just change the order of the... That sounds great. [8:22] Speaker D (unidentified): You okay with that? Yeah. Okay. So I'll reach out to him and see [8:26] Speaker A (unidentified): whether or not he's on his way. Yeah, and either way, let Nadia know and we'll do the best we can. Thanks. Thank you. All right, then we'll move on to the second item, which is SB 260026 545 Kings Highway. and this is an initial review. [8:53] Speaker F (unidentified): Thank you Mr. Chairman. I'm Charles Cadwell. I'm the owner of 545 Kings Highway. I've been coming to Goose Rocks Beach for over 70 years but in 2016 my wife and I were fortunate to be able to buy a place and I discovered in January of 2024 buying a place involves being responsible for the seawall and the storm my webcam showed me this live washed over the wall and pushed some 700-pound stones onto the lawn and then flushed all the dirt behind the wall out to sea. So I was able, with the help of a guy with a trailer, replaced some of the dirt and stone behind the pilings that are there inside the wall, but not do the other work. So I'm here tonight with my Craig Burgess from Acorn Engineering with an application to finish repairing that wall. and Craig is here and I'll let him do the presentation but we look forward to any questions you have about it. Thank you. [9:56] Speaker C (unidentified): Good evening Craig Burgess with Acorn Engineering. So I have a it's not really a formal presentation but there's some pictures that are in front of you that show the existing condition of the wall as it looks like that with the jagged rocks everywhere it's not how it should look when the waves will hit if they hit that now that makes it more exposed to movement of those rocks with the larger waves. The hope would be that the repair would create like a nice even surface as much as you can create with larger jagged rocks. If you don't mind flipping sort of through the pictures that I have up. These pictures all just show how rocks have been displaced mainly from the January 2024 storms. You can just see how it doesn't create like an even surface and it's definitely if a next another storm came it's just more susceptible to movement this picture here shows the top of that wall with the vegetation in the back I understand that was one of the comments brought up from town staff is approximately how far back how much topsoil would be removed and what that vegetation would look like the intent would be that it generally matches that existing condition today so there's a mix of perennials back there primarily dominated by roses and if you go to the next picture right there's another or then I think there's another picture below that so this picture shows just generally what that looks like a little bit more clear and you can see there's a granite edging so all that would just be replaced in kind the extent of the disturbance behind the wall would be approximately to that granite edging. So that would be in addressing the town's comments. The hope would be that the same plant species would be replaced there. And then the next slide is just the plan that was prepared. So this plan here proposes just larger stone. So the D50 size, which is the size that at least 50% of the rocks will be is four feet and we were able to determine that based upon calculations to determine the minimum weight so based upon the minimum weight that equates to a roughly a four foot size jagged stone so 50% of the stones that would be replaced here would be four feet some a little bit bigger some a little bit less and then ultimately the void space between the rocks would be filled in with smaller stone. The revetment is approximately 64 feet across the entire width of the property. So we are, what is in front of the board tonight does propose to repair that entire wall of 64 feet across the beach area. So the beach area is right in front of the wall and I want to note that there is a piping plover habitat in this area, so we are working with Inland Fisheries and Wildlife to determine, to get an official letter. They are awaiting the town's feedback and approval of this project for them to issue a formal letter. But the breeding period for the piping plover habitat is April 1st through September 15th. So the hope, I think, would be to start this work before April 1st just to get it done. Again, this wall, the slope of the revetment, the general height of it will match existing conditions. So because it's going to match, it's essentially a repair. So because it's a repair, it matches existing conditions. It's exempt from U.S. Army Corps of Engineer review and Maine DEP review. So we're hoping for approval tonight so that we can then go ahead and provide the approval letter to Inland Fisheries and Wildlife and it would set this project up for construction at some time before April as soon as the snow melts and it becomes the seasonal conditions allow for it so with that I'll turn it back over to the [14:12] Speaker A (unidentified): board with any questions thank you thank you do we have any input from the code [14:19] Speaker C (unidentified): office on this yes so there we did have a couple of comments which the applicant addressed some of them in the updated materials. But outstanding, we're just hoping to see that landscaping plan included in the actual plan, so a depiction of how far back the landscaping goes and what plants will be included there. The couple of comments that you may have seen in the original memo were about the agent authorization from the homeowner and from the abutter, who will have a little bit of work done on that property line. We did receive the authorization from both parties, so we're all squared away there. So from staff's perspective, we're just looking for that vegetation plan for behind the revetment. [15:10] Speaker G (unidentified): So we have the okay from the left and right abutter? Is that what you're saying? [15:15] Speaker C (unidentified): We did not ask for a note from the abutter to the other side. we did ask for a note I guess on the plan the butter below because a little bit of the of the proposed work extends past the property line yeah so we did get a note from that a butter that it's a shared right-of-way and that they have [15:37] Speaker F (unidentified): no issues with that okay we did not ask for [15:51] Speaker C (unidentified): for them to reach out to the abutter that is above them, as shown on this slide. [16:00] Speaker H (unidentified): So you're going directly up to the granite stones? [16:06] Speaker C (unidentified): Yeah, the footprint itself is identical to what's out there today. [16:11] Speaker H (unidentified): So there is revetment down below the sand line today? [16:20] Speaker C (unidentified): When you say below the sand line... [16:23] Speaker H (unidentified): I'm looking at the picture. [16:24] Speaker C (unidentified): At the beach? Yes. So the, yeah, the stone is buried in there a little bit. So the intent would be just to tow that stone in, tow that stone into the sand just so that it can be anchored. [16:38] Speaker H (unidentified): I see you're interweaving geotextile. Are you planning to put plants on top of the crown then to grow ultimately? No. Over the rocks. So the rocks will be exposed the entire time, any plantings will be behind the revetment. [16:59] Speaker C (unidentified): Behind it as it exists today. In [17:04] Speaker B (unidentified): the photo it doesn't look like it crowns above the soil in the back there, is that correct? [17:12] Speaker C (unidentified): So that crown is more or less, so there's an elevation noted on this of 13.25. If you can go back to one of the pictures that shows the vegetation that would be great. Great. So yeah, right there. So the 13.25 elevation is roughly at the edge of the garden against the stone. The high spot that we shot when we actually did a field survey out there to support this project, the top of those stones is roughly 14.75. The plans show 15.25. i don't know where that shot was of 14.75 but you can see how some of the stones do rise up above the lower elevation where the where the plantings are so it's really just to kind of mimic that a little bit and i would be open to adjusting that 15.5 elevation to read match existing stone elevation match existing highest stone elevation just so that where what is built generally matches exactly what's here but the intent is like that is more smooth over the top than what you're looking at here because these stones have all been displaced but before it was all displaced it did kind of have that mounding effect a little bit more so [18:41] Speaker G (unidentified): are you saying these stones are no good? Are you going to bring in all new stone? Is that what [18:47] Speaker C (unidentified): you're saying? A lot of the stone will be reused, but relocated. So a little bit more care will be taken for how the stone is placed and interlocked with other stone. Okay. [19:00] Speaker H (unidentified): Are you going to pin any [19:01] Speaker C (unidentified): of them? No. Okay. The,, the geo textile that's interweaved between the stone helps pin the stones together. [19:13] Speaker H (unidentified): And the 15.5 peak elevation on your drawings, how does that compare to neighbor's revetment? Is that higher at the same level, lower? You can kind of see it across [19:25] Speaker C (unidentified): here, but it's generally the same. [19:34] Speaker A (unidentified): John, anything? No. [19:37] Speaker G (unidentified): I don't have anything else. I think that obviously you guys have looked at that will this impact the waves flowing in a way that is detrimental and all that stuff. And obviously, you wouldn't come if it was. And unfortunately, we've seen a lot of these January 2024 rebuilds of the stone. [20:02] Speaker A (unidentified): Can I ask how you're going to get the stones down there? [20:06] Speaker C (unidentified): There will be a small excavator working from the top down. [20:12] Speaker A (unidentified): down so this lawn that I can see in the in the picture in front of me here I can picture an excavator on that yes what happens [20:30] Speaker B (unidentified): if the plowers are he's a big stone you just try to get it done before you're not gonna be allowed to work if [20:34] Speaker G (unidentified): the right I mean nobody can say so first is nesting right yeah so I want to get it done before that so [20:45] Speaker A (unidentified): so you have access from the road yes for the excavator he's going to come up down that right of way no there's you talked about no i'm trying to if you back up to [20:57] Speaker F (unidentified): the maybe do you have a property map the no you can see the house there yeah right there yeah so my cottages are the two that are right there the one near the road and then one on the beach, and the abutters is the one on the bottom of the screen, and I've had, well, the guy that brought the dirt brought a big, huge trailer and his truck up there, and there's plenty of room, but he, we had him put plywood down as well. [21:30] Speaker A (unidentified): I was going to say, that's the abutter that I'd be worried about is the, you know, well, [21:33] Speaker F (unidentified): the abutter next to me has got his house all torn down, so he's, he should be worried about [21:37] Speaker A (unidentified): me. I'm sure, I'm sure he is. Yeah. All right. [21:43] Speaker H (unidentified): In any event you're not going to operate the excavator from the resource. It'll be from the land side [21:51] Speaker A (unidentified): It sounds to me like what you're trying to do is you're gonna you're trying to restore it To the footprint in the profile that you had before you're not trying to change the elevation But you're trying to introduce some engineering rigor with the size of the stone you may have to bring in some new stone. Is that what I understood? [22:16] Speaker F (unidentified): I don't know where they went, but it's like the face of it just sort of caved in. [22:22] Speaker A (unidentified): Yeah, I'm sure it was memorable to watch it happen. Yes. Couldn't believe it, right? [22:29] Speaker F (unidentified): Well, you may remember there was a whole lake in the street in front of us for several weeks afterwards. [22:34] Speaker A (unidentified): Yes, yeah,. We've got a couple of other. What's the interface with the neighbor's revetment? [22:49] Speaker F (unidentified): The neighbor to the south has he's on a higher dune so his wall goes way higher [22:57] Speaker A (unidentified): like 10 or 12 feet in the air. So you're going to have stones that are butting up against his or no? The stairway sort of butts up against his high stones. Oh I see so you've kind of got a natural break and on the other side? He owns that property too but that's [Speaker F (unidentified): similar to ours.] And what's the revetment look like there? Did it get equally damaged? [23:20] Speaker F (unidentified): He may be here next month, I don't know. [23:25] Speaker A (unidentified): But you don't see that as a problem, the interface there? [23:29] Speaker F (unidentified): Well, no. The Gulf of Maine gets a foot and a half deeper, and we all have a [23:32] Speaker A (unidentified): problem. No, I understand, but as you put in all of these new materials and all, the ocean's going to have its way, especially at an interface, right at the end points. I want to pin down what it is the code office is looking for in terms of a landscape plan. What I think I'm hearing you say is you're going to restore it to the condition that I see in the picture, no more, no less. Is that fair or no? That's not correct. [24:12] Speaker F (unidentified): I've replanted that perennial garden three times, and I'm tired of replanting it. So the more we can replace it and leave it, the better. [24:18] Speaker A (unidentified): So I don't want to put words in your mouth, but I'm thinking that along the lines of what we've seen in the past, a list of the plants that are going to be put in? [24:30] Speaker C (unidentified): A list of plants in the area where they'll be planted. [24:34] Speaker A (unidentified): It's not a lot, okay? We're not looking for a detailed grid. [24:40] Speaker F (unidentified): Six roses or seven roses. [24:41] Speaker A (unidentified): No,, but you're going to restore that, but using these materials. [24:47] Speaker C (unidentified): Yeah, we can add that to the plan. [24:49] Speaker A (unidentified): I think that would be something that would be doable in more short order and wouldn't hold you up. [24:55] Speaker C (unidentified): Is that something that needs to come back to the board for consideration? [24:59] Speaker A (unidentified): You're reading my mind here. I'm going to go there. [25:05] Speaker C (unidentified): I think that it is something that could easily be accomplished before the next meeting. So if the board is ready to schedule the public hearing, I wouldn't have any concerns about that. Okay [25:17] Speaker A (unidentified): Yeah, we're all good with that But we always ask that question Is [25:28] Speaker B (unidentified): there a motion to I move to approve it? For that's complete that's complete for the public hearing [25:35] Speaker A (unidentified): assuming that there was a in the next few days before that we get the landscape plan as we described. I second that. All those in favor? Aye. So we can't approve it tonight. We will schedule a public hearing for two weeks from now. [25:52] Speaker C (unidentified): So that'll be November 18th. [25:54] Speaker F (unidentified): Okay, is it okay if I'm not here for that? [25:56] Speaker I (unidentified): Yeah, sure. Yep, great. Thank you both. Did [26:06] Speaker B (unidentified): you get it, Regent Muller? [26:13] Speaker D (unidentified): Yes, sir. What'd you find out? so i did speak to mike and he is not on his way we would like to table until the next meeting he has also indicated that between now and that either the end of this week or sometime next week he will deliver the plan the plan will be delivered to you so that there'll be something substantive to talk about next time we're here And I apologize to neighbors and friends who came. Okay. Of course. [26:50] Speaker B (unidentified): 18th of November. How the heck did that happen? Nadia, while he's here, do you want to make sure that we have agreement on what actions other than the revised plan, just to help communicate? [27:04] Speaker E (unidentified): We can reach out to the applicant outside of tonight's meeting and let them know. [27:09] Speaker C (unidentified): So, yeah, we've exchanged communication with Mike as well. So I think he has a clear understanding of what we're looking for. Appreciate it. [27:25] Speaker A (unidentified): Moving along to item, third item on the list, third item on the amended list is SP 260027, Adele's Way. And this is an initial review. [27:39] Speaker C (unidentified): you so i'll give a little bit of history on this because i think there's a couple board members who maybe were not here for the first round of adele's way but this was a project that was initially approved in february of 2025 and planning board approvals have a time limit basically before construction can start and this the basically they ran out of time there was an extension granted, but the construction didn't start within the time of the extension. So the applicant is back to ask for re-approval for the project. The plans haven't changed from the initial proposal. This is an administrative matter, mostly to re-up a previous approval to a site plan. The project itself is a private road off of Old Cape Road to service a future family subdivision. We did have a couple back and forths with our town attorney at the last iteration of this project to get some sample deed language with stipulations about not being able to sell the lots for a minimum of five years after the subdivision was created and so forth, some protections for that family subdivision clause to be effective. [29:03] Speaker A (unidentified): Because it did not receive a subdivision review. Correct. As these were family. [29:07] Speaker C (unidentified): So the scope of this review is entirely limited to the roadway itself, and it does not take into account the potential future splits of the lot because this is not coming for a subdivision review. The applicant does understand that if they decided to split in a traditional subdivision, that they would have to come back for a regular subdivision review as opposed to just a private road site plan. [29:32] Speaker G (unidentified): but the only thing we're deciding everything is the same it was already approved it's just a matter [29:39] Speaker C (unidentified): of granting in another extension and i've added the last find the previous findings of facts to the sharepoint i'm happy to pull them up it's it is technically it is a re-approval it's not an extension that they're here for because yeah the last extension ran out so we'll be going through the same motions of you know approving waivers scheduling a public hearing and then full approval okay will [30:08] Speaker B (unidentified): you update the FOF and memo [30:11] Speaker C (unidentified): yes we'll be so this is a new memo and we'll be we will do a new findings of fact at the end of this application just like we would for any other no [30:24] Speaker B (unidentified): wait a shortcut yes just to be clear that what there's waivers required those have to [30:32] Speaker C (unidentified): be a re-approved or how's our yes so those would be it's it while it is an approval of a previously approved project it is running through the same administrative steps as a regular site plan review would so waiver approval vote of completion, public hearing, and then [30:53] Speaker B (unidentified): findings of facts and so forth. So you still have to do a public hearing? Yes. Are there any code changes that have occurred since? [31:02] Speaker E (unidentified): I don't believe so. Not relative to this project. Good question. [31:07] Speaker B (unidentified): Also, if it's a private road, does it have to meet any kind of WIT standards for fire safety? [31:13] Speaker C (unidentified): Yes, and it does meet all of the It meets all of the road standards in our land use ordinance. They notably do not have to meet the subdivision road standards because it's not for a reviewed subdivision. [31:29] Speaker B (unidentified): And how are they different? [31:31] Speaker C (unidentified): The subdivision road standards are a little stricter. They require paving. They require that cul-de-sac at the end if it's a dead-end road. And there's a couple other minor things that can kind of come into play. but the regular road standards are pretty basic they're just about they're mostly about width and there are some regulations related to the gravel compaction and so forth but this proposal meets all of the land use road standards is there any water [32:02] Speaker B (unidentified): bodies that are important on the side of the road not for the roadway [32:09] Speaker C (unidentified): no I one note on the memo I did incorrectly note that it's in the shoreline and the floodplain it is neither of those things that's just a leftover from a previous memo can you can you remind me does this [32:21] Speaker A (unidentified): predates the generation of these site plan the planning board memos or it [32:29] Speaker C (unidentified): doesn't it doesn't predate the memos it does predate this format so I understand In the original application that I uploaded in the SharePoint, there are the previous memos that we went through. [32:42] Speaker A (unidentified): So it seems to me, for the purposes of finding this complete or not, we have the input from the code office. We have the original site plan memo to the board. We have the findings of fact, and we have the assertion that there's been no code changes that are pertinent in the interim it seems to me that is what I was looking for in terms of [33:14] Speaker J (unidentified): completion agreed so with that dude I'll make a motion that we find this I second that all those in favor all right great public hearing will be [33:31] Speaker C (unidentified): November 18th, so their next meeting. [33:33] Speaker D (unidentified): And thank you, Nadia, for saying all that [33:35] Speaker C (unidentified): a lot better than I did. Of course. I [33:52] Speaker K (unidentified): don't mean to interrupt or be a buzzkill, but I'm Dave's neighbor. At 3 p.m., this wasn't in my mailbox. I got my hands on this at 5.40 at night. I opened it at 5.50. I don't think that's acceptable, guys. [34:07] Speaker A (unidentified): I'm sorry. I'm not... What is it? I'm not sure of what... I received this [34:10] Speaker K (unidentified): 20 minutes before the meeting started could you say again who you are I'm Dave's neighbor Dave's [34:16] Speaker A (unidentified): neighbor and your name is my name is John hi John you have a last name [34:23] Speaker K (unidentified): let's go sorry I don't know how well stuff works no I understand I'm really rushed and medication that probably shouldn't have driven here but again 20 minutes guys this wasn't in my mailbox at 3 p.m. today okay we [34:39] Speaker C (unidentified): We unfortunately don't really have control over how quickly the mail gets to... Perhaps it should be sent out earlier. [34:46] Speaker K (unidentified): If we all know, we all know, what mail's like in our town these days. Slow. To say the least. Yeah. That's being very polite. Is there any way we could make sure that the notices go out sooner so we can accommodate the mail's slow cycle of delivery? [35:04] Speaker A (unidentified): So two things. One, I think you've just made that request and it's to the code office I if there's a control on this that might be [35:13] Speaker K (unidentified): something worth considering if it helps it was postmarked the 29th yeah my [35:19] Speaker H (unidentified): understanding is I have to go out at least a week ahead of the meeting is [35:23] Speaker K (unidentified): that right that's correct but a week ahead of the meeting got it to me yeah 20 minutes I just want to clarify what the what the postmark the 29th yeah the stamp was 29. Oh, my gosh. Within town. Actually, it got routed through Boston. [35:41] Speaker A (unidentified): It has to go to Scarborough. [35:43] Speaker K (unidentified): It had a Massachusetts stamp on it. But regardless. Okay. That's interesting. [35:49] Speaker C (unidentified): Our office sent them out on the – we put them in the mail on the 27th, so about eight days before the meeting. So I apologize that it didn't get to you until this evening, But that is our general time frame for sending out a butter notices is a week beforehand We do have a pretty consistent meeting schedule And several butter notices to send out in that time frame But it's certainly something worth noting and we can discuss that in the office and with the board. I [36:22] Speaker G (unidentified): Would appreciate it Thank you. Yeah Hi. [36:32] Speaker A (unidentified): Again. Remind us who you are, Nancy. [36:35] Speaker L (unidentified): Nancy Ahman. Hi, Nancy. In that same vein, I have neighbors that got public notice of a public hearing a month after the hearing. My brother had to my sister's subdivision. He got his at 4 o'clock the day of the public hearing. I had my green card for my public hearing signed by someone else I went to the post office and I mean that's not right that someone signed for my thing understood and I've just heard a lot of these stories of people not being notified it's a definite problem that should be addressed at the post [37:21] Speaker C (unidentified): office handling of certified mail is not really something that we have any control over right so I'm sorry that someone signed for your mail but that's yeah we have no way of regulating what the post office does after we give them [37:34] Speaker L (unidentified): the letters but they should what do you think what could be done the public [37:43] Speaker C (unidentified): hearings are challenging we have a very we have a limited time to send them out because they're scheduled on a Wednesday we tend to send them out on Thursday or Friday after they're scheduled but at maximum we have you know 13 days between the meeting and the notice so we hope that the post office is able to get them to people in a timely manner but we really can't send them out earlier than we do for the public hearing notices so and then getting there a month later I mean that's it's these really a lot of these are post office issues that we're we're not really able to account for in our office practices. [38:22] Speaker B (unidentified): Nadia, don't you post it online, though, the next year, tomorrow? [38:26] Speaker C (unidentified): We post it on the public hearing notice page of the website. We post it in a local newspaper. We post it on the agenda. [38:34] Speaker A (unidentified): We don't all check that all the time. [38:36] Speaker L (unidentified): Right, like if someone doesn't know that a development's going in beside them. [38:40] Speaker A (unidentified): And we've spent how many years thinking that we could rely on the post office? [38:44] Speaker L (unidentified): Exactly. I don't know what the answer is, but it's a problem. [38:48] Speaker G (unidentified): Yeah, I know yesterday at voting here, was it here? Yeah, it was here. They had big stacks of flyers trying to give them to everybody, like go to the site, the town site, and register to get notices of things and meetings and things. But you're right, not everybody's going to do it. [39:07] Speaker L (unidentified): Right, and everybody's busy, so all of a sudden they're like, oh, there's a development going in next door, excellent, and I've missed the public area. [39:14] Speaker G (unidentified): And I think we all live with, you know, you don't get mail for two, three days, and then suddenly you get a stack of mail from. [39:23] Speaker A (unidentified): But we do understand that this is a federal agency that we're struggling with, right? [39:35] Speaker B (unidentified): I would say we could try to get them out. I mean, if you know the public hearing now, I mean, you get it out the next day. At least it's 13 days. Right. [39:43] Speaker C (unidentified): Like I said, we do our best to send them out Thursday or Friday. If we have a slammed office day, they might not get out until Friday. But, you know, again, we have a pretty tight timeline for the public hearing notices specifically. [39:56] Speaker A (unidentified): You've got the post office then says, okay, I've got to send this to Boston and then back to Scarborough before I deliver it. [40:01] Speaker C (unidentified): Right. The certifies are challenging. They definitely route those somewhere else and then they have to come back. [40:06] Speaker B (unidentified): But the other thing is, even if you find out late, you always can send an email or a letter to the code office if you have concerns. It's not too late. [40:21] Speaker A (unidentified): Well, that's right. But I think what Dave is saying is that you might not have gotten it at all. Once you have awareness, it's like, well, all is not lost. We're not going to have the public the hearing for public input until two weeks from now So you didn't lose your opportunity to speak on it, but come on guys Yeah, but you might not have gotten it at all right if it might It's just a concern. Yeah, you don't want your nose in catastrophic particular time. There's nothing being changed from the last time But it's still worth bringing up. Yeah, so you will take advantage of the public hearing [Speaker K (unidentified): outside of here.] Now that you know that it's timely. Thanks for bringing it up. I don't think you got any satisfaction other than an airing of the concern. I don't know that they're going to come up with a fix but everybody voted yesterday, right? Keep voting. We're going to move on to the next item on the agenda which is SP 26 260023 for 14 Wittsmore Lane and this is a public hearing this evening. Yes Who's here for Welcome back Can you remind us what it is we're doing or I can ask I can ask the code office to summarize [42:23] Speaker C (unidentified): Yep, so this is the public hearing they've had two meetings before the board. The basic proposal is to tear down and rebuild an existing house that's within the 75-foot resource setback. There's no proposed change to the footprint of the actual structure, barring a little bit of change to the stairs, which is permissible per our ordinances. The structure will actually end up being a little bit shorter than the existing structure while still elevating the base above the base flood elevation allowing for a small carport underneath and you know staying within our ordinance regulations for building height we had no outstanding comments as of the last meeting and have not provided an updated memo because we still have no outstanding comments any [43:21] Speaker A (unidentified): questions comments from the board no there's no [43:27] Speaker H (unidentified): further actions from us no I guess the only the only update is there was a butter correspondent yes that's true there is what today was posted today yes [43:38] Speaker C (unidentified): and I did speak on the phone within a butter as well who didn't submit official correspondence but had similar concerns mostly related to the construction phase and making sure that Whittemore Lane would still remain completely passable while construction was taking place. [43:56] Speaker M (unidentified): Yes, and that'll happen. It'll remain passable. [44:01] Speaker A (unidentified): So with that, I'd like to open the public hearing. Is there anyone here? I don't see anyone here, but is there anyone here who wishes to speak? Is there anyone on Zoom to speak to this issue? We do. yeah let him in yes [44:20] Speaker N (unidentified): how you doing hi can you introduce yourself please sure my name is brian lucier i own 530 kings highway basically the opposite side of whitmore lane the entire length of whitmore lane hi brian two things quickly i mean i think the house rebuild is a great idea and i support that having gone through the file just the other day online i did notice that apparently there is a turnaround down there of some sort on my land i have not walked down there probably since i bought it in 24. i did not remember it at the time it could have been there then i'm not sure but it definitely shows some type of turnaround around almost on the across from this property line so and i did reach out to the engineers for the applicant and we basically played phone tag probably more my fault than theirs they did make an effort to reach out and have a conversation i am just curious as to what is there is it used as a turnaround i don't believe there's any easement for it certainly i don't think our title records showed one there so i mean my concern it isn't about the house it's more about whitmore lane itself and what is there what was permitted to be there is supposed to be a turnaround there or [45:56] Speaker C (unidentified): just for clarification so i'm going to pull up the plans or the survey just to clarify are you referring to this little bump out yes off the side I guess I'll leave it to the applicants agent but it doesn't appear to be included in the parking area proposed for this project or attached to the proposed project in any way right that's kind of our conclusion and in [46:27] Speaker M (unidentified): talking to Liz you know she's aware that 's there and we in the course of doing a complete as-built located Whittemore Lane the edge of gravel and located that turnaround so it does exist it is not coming from the driveway of 14 Whittemore although it's obviously connected to the to the road opposite the neighbor so it's not really used by Liz or anyone I mean and it was there when she bought it so it's kind of a thing that maybe it's an encroachment You know, we wouldn't argue with that, but it wasn't caused by this project nor is it used [47:09] Speaker A (unidentified): By this project just out of curiosity. It's it's on The abutters Brian's land it is. Yeah, is it used by? your client If it went away if Brian said I don't like that there. I'm gonna plant a tree [47:28] Speaker M (unidentified): That would be fine. It's not necessary to the use of 14. It's not it's not on any deed [47:34] Speaker A (unidentified): it's not in the plans brian it sounds like it's not on your no i would call it an encroachment [47:39] Speaker M (unidentified): i think that's an accurate assessment although [47:44] Speaker A (unidentified): it's not needed it's an archaeological artifact [47:48] Speaker I (unidentified): who knows i don't know okay was it once upon a time a hammerhead i really i'm not sure it looks [47:56] Speaker C (unidentified): hammerhead ish but it's not like i said it's not really it's not hasn't been included in this project so we haven't done any looking into it as far as you know as far as our review is concerned it's on someone else's property and it's not really a [48:12] Speaker I (unidentified): factor in this project who owns Whitmore Lane all the houses along [48:20] Speaker M (unidentified): it have the right to use it and there's 14 and then I think there's four or five others that have the right to use it and they own it in common or they [48:30] Speaker A (unidentified): each have easements but the deed for it i don't know if you looked at it doesn't doesn't describe this turnaround it does not okay yeah all right brian does that help well it i don't get [48:46] Speaker N (unidentified): satisfaction from it but i mean i understand the position that the applicant's in you know it's it's part of the roadway it's basically whittemore lane is basically an easement that runs down across five lots and I don't know when it was created I don't know if the permit that created it required this turnaround and they put it in and the previous owner was agreeable to it what again I don't know if there's [49:10] Speaker A (unidentified): anything there I'm hearing is that there's no one has anything that says that's true that it's it's not a part of Whitmore Lane that's so the fact that [49:20] Speaker N (unidentified): that it's on this it's an interesting artifact on your property okay is there i mean i guess this is i can speak to the town staff about this separately i'm just wondering i'm assuming the this road isn't isn't very old it may have been a dirt road and they upgraded it possibly but it's my understanding that it's not that old maybe 20 25 30 years and if there's a file on it i'd like to see that if possible just to see what their original intent was to what it's become come today because part of it's paved part of it isn't this end is and it's all gravel right we [49:55] Speaker C (unidentified): have that file at the town office you're certainly welcome to come in and take a look okay yeah [50:00] Speaker N (unidentified): that'd be i would do that yeah that's great cool all right other than that i mean i am all for the house being rebuilt you know it's it's i guess it's what happening everywhere in that neighborhood right now so all right again thank you very much thank you thanks brian is it is there anyone else [50:19] Speaker A (unidentified): with a hand raised then we'll close the public hearing and talk about were there any waivers that were needed for number 14 Whitmore Lane I see that Nadia's tag one two three the staff recommends a waiver to the requirement for roads curbs bumpers and sidewalks indicated because there aren't any proposed location of existing and proposed stormwater systems there's no grading proposed you don't need that and the location dimension and details of signs of which there is no signage so would you agree that those three waivers are not it could be granted. Submission waivers these are. Yes. Yes. All those in favor? Aye. With that I would entertain a motion that this should be approved. Yes. I second it. All those in favor? Aye. I will make that motion. No that's good he seconded it. Okay good. All those in favor? [51:45] Speaker M (unidentified): Thank you. Well thank you very much. [51:46] Speaker A (unidentified): And we wish you well with that. Thank you. Thanks. Good luck. [51:48] Speaker C (unidentified): One quick note. I think the email may have gone to Amanda about the rolled plans. If you could just drop off a set of two sets of rolled plans of the final site plan and the elevations, I'll send an email out to the board, and we can hopefully get those signed before the next meeting. Rolled, not folded. Rolled, not folded. Yes. Very important, or the registry won't take them. [52:17] Speaker A (unidentified): And we'll have a findings next meeting. [52:20] Speaker C (unidentified): I have a copy of this meeting. I sent them out this morning, so they did come out a little bit late. No worries. If you'd like to read them this meeting, I have them. If you want to hold off to have some more time to review until next meeting, then I can bring them next time too as well. [52:35] Speaker H (unidentified): I'm fine with them. [52:36] Speaker C (unidentified): Peter had some thoughtful comments, so they have been looked at by a board member and reviewed. And [52:50] Speaker A (unidentified): we're on to item six, other business. And this is the findings. All right. Are [53:02] Speaker H (unidentified): we comfortable reading the findings? For [53:05] Speaker B (unidentified): which one? There's two. For 14 Whitmore. Yeah, go ahead. Planning [53:21] Speaker H (unidentified): board findings of fact and decision. Applicant Elizabeth Chinnaswamy, property location 14 Whitmore Road, map 33 block 2, lot 24, zoning district goose rock zone, shore land, and resource protection overlays. Applicant type is a site plan review. Number one, project summary. Applicant is proposing to tear down and reconstruct an existing dwelling located within the 75 foot wetland setback. Proposed reconstruction will not result in an expanded footprint but will slightly alter the existing footprint by reconfiguring a porch placement and dimensions. To accommodate the shifted porch placement, a section of the existing porch will be removed from the northern side of the building and replaced with a planter. The replacement structure will also be elevated to conform with FEMA standards. The lot is entirely within the shoreland and resource protection zones. The applicant is subject, the application is subject to planning board review under section 240-8.3b5 expansion of a non-conforming structure. Number two, procedural history, date of application September 2nd, 2026, date deemed complete by the board October 21st, 2026, date of public hearings November 4th, 2026. Date of site visit, none. Decision date, November 4th, 2026. Number three, waivers requested. Section 240-10.6 C10. Improvements such as roads, curbs, bumpers, sidewalks shall be indicated with cross-sections designed. This was approved by the Planning Board because there are no proposed improvements of this kind section 240-10.6 c 11 location and design of existing and proposed storm water systems sanitary waste disposal systems and potable water supply and methods of solid waste storage and disposal was approved by the planning board because there is no proposed grading including in this project section 240-10.6 c14 location dimensions and details of signs It was approved by the Planning Board because there is no signage proposed as part of this application. Section 4, Findings of Fact, Right Title or Interest. The applicant demonstrated a legal interest in the property by submitting a quick claim deed, which was recorded in the York County Registry of Deeds on 3 October 2024, Book 19-525, page 179. Pursuant to the requirements of Section 240-10.10 of the Land Use Ordinance, the Planning Board shall approve an application for site plan review unless it makes one or more of the following written findings with respect to the proposed development. There are 16 findings and it was no to all. When the proposed development is located in the shoreland and resource protection zone and additional requirements of Section 240.10.10 above, the Board shall approve it with the conditions if it makes a positive finding based on the information presented that the proposed site use and their list of eight conditions and it was yes to all section 5 conclusions and decision section 240 dash 10.10 a and section 240 dash 10.10 B of the land use ordinances mandate that the Planning Board shall approve a site plan application unless it makes one or more of the identified findings that would otherwise compel denial as noted above the board makes no such findings the decision site plan application identified above is hereby approved conditions of approval pursuant to article 10.11 10.12 e number one the applicant pursuant to 10.12 e shall notify the planning board prior to the transfer of rights to construct an approved project no assignment or transfer of rights to construct an approved project is valid without prior review or and approval by the planning board number two the applicants must record a copy of this decision and provide proof of such recordation in the form of a copy thereof attested by the registry of deeds before any permits may issue or before any construction activity may commence number three the applicant shall comply with all the terms and conditions of the town of Kennebunkport ordinances that we can sign Thank You Peter okay in [58:31] Speaker A (unidentified): terms of other business I did want to take the opportunity to welcome Kelly Laughlin our new admin support to the board thank you for coming well personally this [Speaker J (unidentified): evening you met] have you met these guys John Hall Rick Sherman Peter Fister myself and Francis George is out tonight but I'm sure he'll be happy to see you as well thank you very much any other business to talk about you want to [59:03] Speaker I (unidentified): say something about tomorrow's workshop and yes just a reminder for the board we [59:08] Speaker C (unidentified): We have a site walk scheduled at Blueberry Hill at 3.30. [Speaker I (unidentified): 3 or 3.30?] Yes, that was an error on my part. I misremembered. I thought we had scheduled it for 4. Ben suggested we actually move it to 3.30 so that we didn't run up against the sun. And then the applicant also said I thought we had scheduled it for 3. So that was a bit of a snafu on the part of the planning department. But it all worked out in the end, and we're good for 3.30. I'll confirm with the applicant and we'll let you guys know tomorrow morning hopefully, but I think we should be able to park on site If not, we'll let you know about an alternative parking plan It would probably be parking at the village parcel and walking over on the local sidewalks that are over there And then following the site walk at 5 p.m. We'll have a workshop to discuss the historic design standards We'll meet here. It won't be recorded, but it is still technically a public meeting so someone might show up I don't know, but that's just kind of for us to go over any comments that you guys have had I resent out the historic design standards document. Hopefully everyone's had a chance to review if you've had any trouble with that document Or haven't been able to leave comments But want us to know ahead of time just send me an email and then and I will look over everything before the meeting tomorrow So that we're well prepared and it can hopefully have a good productive conversation [1:00:35] Speaker H (unidentified): I have a conflict at the review of that tomorrow. I did make some comments in addition to Ed's. [1:00:42] Speaker C (unidentified): Okay, we'll make sure to talk about them and review them. [1:00:46] Speaker A (unidentified): So just to be clear, George begged off. [1:00:50] Speaker C (unidentified): I think that George maybe is not coming to the site walk, but is coming to the workshop. Oh, good. That was my understanding. I think we've got Peter for the site walk, but not the workshop, and George for the workshop, but not the site walk. [1:01:01] Speaker A (unidentified): Kind of tag team in it, yeah. [Speaker H (unidentified): Sorry about that.] sounds good with that we're gonna sign the findings of fact any other business then I would make a motion that we adjourn second that motion all those in [1:01:17] Speaker J (unidentified): favor aye all right thank you thank you good work