[0:33] So, good evening everyone. Thank you for coming to our meeting tonight about the Tedford Road reconstruction and the sidewalk. I'm I'm Mark Waltz, the town manager, and we'll go around and do some introductions here and then I'll just kind of set the stage before we turn it over to our engineers. [0:48] Chief Hagan? [0:48] Mark Hagan, chief of police. [0:50] Max Hunter, public works director. [0:52] I'm Chris McDonald, a civil engineer with BH2M. [0:55] Steve Blake, also a civil engineer with BH2M. [0:58] Josh Jenison, deputy director of public works. [1:01] So, many of you were here probably 2 years ago when we had a draft plan to basically help us choose which side of the road we wanted the sidewalk on. And the consensus of the group that night was that the preferred side was the west side of the road. And for those of you that weren't here, this project has been requested by your neighborhood for a long time. [1:25] people have said it'd be much safer to walk on the road, they'd like to have a sidewalk there. Our former public works director initially was hoping it would be a much easier project. You may have noticed a few years back we added sidewalks to Topsham Fair Mall Topsham Fair Topsham Mall. [1:41] Yeah. [1:42] Topsham Fair Mall Road. Anyway, down by Best Buy. And for that one all we basically had to do was pave a part of the shoulder. but it quickly became apparent once the engineers got involved in Tedford Road that because of the road is so flat, if we just paved the sidewalk in, what we'd do is create all kinds of drainage issues. [2:03] and then as most of you know, your road is about 200 years old and was originally for horses and then just kind of got paved over and was never properly built. so to do this project, we end up having to rebuild the road, which is good because we'll have a, you know, good quality road, but it certainly increased the cost a lot. we went from a project that we thought would be roughly 200,000 to one that's going to be about 2 million to rebuild the road, put the drainage in, put the sidewalks. [2:31] the first piece of this was done a couple of years ago when we had to redo the culvert at the end of the road. we thought since we're digging it up, we may as well put the sidewalk in there. so that piece already has it in, but now we're looking for the rest of it. the select board approved an RFP earlier this year for the design work to follow on from the the preliminary choice that you folks have made of which side of the street. [2:58] And BH2M engineering firm won that. they've been out a number of times viewing the road with town staff. they're actually going to be out once more next week with a survey crew just to verify the locations that are in the prior survey and see what may have changed. and now that they know pretty much what they think they want to do with the design, they want to again verify points, figure out where drainage is going to be, stuff like that. [3:23] we had a question earlier which I'll address now and then we'll certainly take more questions and comments in a few minutes after they open up with their presentation. the question earlier was when would you hope to do this? the hope would be we would try to do this next summer. so the steps that are remained to be involved is they would finish their design. [3:44] the water district has joined in this project because they need to replace your water line that goes down Tedford Road. so they are going to be paying any costs associated with that portion of it. and there should be a little at least a little bit of overlap of things that are mutually beneficial, so it should be a little cheaper for both the town and the water district to do the project at once. [4:06] So, what would happen is they finish their design, then get approval for the select board to put things out to bid. we would then get actual numbers back rather than estimates. heard a little bit that maybe some of the contractors are getting a little hungrier for work next summer. So, hopefully that might mean a little more favorable prices than we would have gotten otherwise. [4:27] and then we have that we could access in our kitty through various things, somewhere around a million right now. and then there'll probably be roughly final numbers based on what the bids come back, be another million that we need to go on the capital improvements for next year's budget that would make it through the budget process. [4:48] [snorts] all this is subject to approval of a town meeting. so, we won't be able to say absolutely certain this is happening next summer until the end of the budget process including town meeting. but that's the plan right now is to try to make that happen cuz as I know some of you have been frustrated this is dragging on forever. We'd like to get it done too. So, that's certainly our goal is to try to find a way to make that happen. [5:10] with that said, I'll turn it over to our engineers and then we'll take comments and questions after that. [5:17] The floor. [5:18] Okay. well, again thanks everybody for coming by. my name is Chris McCollough from BH2M. one of the design engineers on this project. so, Ten Rod the existing conditions on this road show about a 20 to 22-ft wide road with no shoulders on either side and the road length is about 4,000 linear feet. [5:40] what we are proposing to do is to design and construct a sidewalk along the western side of the road. and in the plan that Steve has up here, you can kind of see the very beginning of it anyway. When we say west side of the road as we're looking up the road, that would be on the left side as we're as we're going from Middlesex up. [6:04] so, the project looks to put sidewalk along that entire west side. that'll include going across the railroad tracks, and then up to meet the existing, culvert crossing that, as Mark said, was constructed a couple years back. So, basically, the sidewalk would meet that existing sidewalk. as far as the drainage aspects of the project, [6:27] given that we're going to be given that we're going to be putting in a sidewalk on the western side, one of the things that happens with the curb line is that the runoff kind of hits the curb, so we need somewhere for that water to go. And so, what we're looking at doing is strategically putting catch basins in along the sidewalk side to be able to capture that water and then, drain that water away from the road. [6:49] on the opposite side of the road from the sidewalk, we are proposing to put in about a 2-ft wide shoul- gra- gravel shoulder. and again, that's just to make sure that there's appropriate width for the road. on the water main side of the project, the project is currently proposing to extend the existing water main. [7:11] the existing water main goes to, I forget the name of the road. the existing water main goes to about, you know, I think it's like somewhere around 3 or 400 ft from where the, stream crossing is today. And so, effectively, what will happen is that the water main will be extended, [7:32] to provide service all the way to the end of Tedford Road, to the end of Tedford [7:37] Hemlock. [7:38] Hemlock, thank you. Just past Hemlock. and so, the proposed water line will extend water all the way to the end. as far as what you may see on the surface for that, the other thing that the project is proposing to do is replace all of the fire hydrants that exist along Tedford Road, as well as, adding some additional fire hydrants in that area of main extension. [7:59] and I guess the biggest note in the fire, fire hydrants is that, our current proposed, alignment with those has the, fire hydrants behind the, proposed, sidewalk. So, basically what we'll be doing is taking the fire hydrants and putting them on the opposite side of the road where they exist today. [8:19] and I think that's the meat of the project. a couple of quick notes on this. the right of way on Tedford Road today, is relatively narrow. It's only It's a two-rod road, so it's about 33 ft wide. and where we're proposing to put in 2-ft shoulder, 2 11-ft lanes, and a 5-ft sidewalk, that takes up a lot of the right of way. [8:44] So, as the road gets One of the reasons why the road needs to be reconstructed is so that we can center the sidewalk and the road within the right of way. If we just simply kept the road in exactly the same place it is, the sidewalk would go over the right of way. So, in some ways we're kind of realigning the road a little bit. And the other thing as far as proposed conditions, we discussed drainage a little bit. [9:06] one of the things that we're looking at is trying to add a little bit more grade to the road in areas so that we can get positive drainage along the curb lines, so that again the road will drain properly. And I know in existing conditions today, there's a lot of especially on the Middlesex side, there's a lot of flat areas. So, what that's leading to is some of the some of the divots and depressions you see in the road. [9:27] And then, I believe there was some, pavement work that's been done over the past couple of years as well, where that pavement breaks up. One of the big reasons why that happens is water just sitting. So, as part of this project, we looked to try to improve the drainage along, Tedford Road to try to give that a more lasting, subbase. [9:46] And part of that drainage work includes an underground storm drain system. So, along that proposed curb line, we would have catch basins and an underground storm drain. just we'll have it in along most of the stretch of road. It's not quite 4,000 ft, but it's probably 3/4 of the road where we would have that. [10:06] and just due to the nature of adding a curb to an existing road, we have to include something to drain that along the curb line as well. So, there are we have plans up on the screen. We have a hard copy a full-size hard copy of the draft plans here, and then we also have a larger scale [10:28] blowup of the entire corridor that we're looking at. each one of these plans has some has a few different colors on it that we just wanted to highlight. So, anything blue would be waterline, anything green would be the proposed storm drain. and then anything red is what we're looking at for the proposed limit of work for construction. [10:55] Couple of the things that may be of note is they've had some discussions with the post office because some mailboxes need to be moved, and the post office is asking that all the all the mailboxes be moved to the east side of the road, so they'd be on the opposite side of the road of the sidewalk. and another interesting thing of note is the railroad crossing. we were anticipating or hoping that we wouldn't have to rebuild it at the end and save that money because of the fact that the state has approved the railroad there to become a [11:26] trail until rail. however, when we reached out to the state, the portion of DOT that deals with the railroad tracks, they were not at all in favor of not replacing the railroad tracks. they said they've got someone that's proposing to lease the railroad tracks. and it appears that the lease is basically not to really go anywhere. [11:47] but the tracks in Brunswick that go up along Route 1 have been leased to a company that has rail service to Rockland, and they don't have enough place to store their cars that aren't being used. so, you may have noticed when you take Route 1 through Brunswick now over the highway, you see some cars in storage. They're being the state's being asked to lease this part of the railroad track to store some of their cars. [12:13] so, because they haven't made a decision yet,, and I've asked whether that's considered important enough just to use it as storage that it could, defeat the trail. They said, "Well, that's a good question." and they're still thinking about it, but they said, "We have an obligation under federal law that there's any possible chance it could still be used for rail that we can't allow the tracks to be taken up yet." The good news is that they've offered to pay for the railroad rebuild. [12:40] so the town wouldn't have to pay for that part. So, I guess that shows how committed they are. They want to keep the tracks there. so what would happen is the tracks would get pulled up as part of the project and then the state would hire a crew that would put the tracks back together. the most, probably the biggest inconvenience for anyone that lives north of the railroad tracks is that be about a 2-day period when you wouldn't be able to cross the railroad tracks. [13:05] so what we would do for that is similar to what we did when we had to build the culvert and the people north of the culvert couldn't get there, is would approach the owner of the Highlands and asked if we could temporarily use Audubon Way for 2 days so people could get in and out of that end. in the past we traded the use of Audubon Way for the grading of it and he was more than happy to do it. So, that's what we'd work on so that people could still get back and forth to the houses and we could get fire trucks and whatever else. [13:31] but we were happy to know at least we wouldn't have to pay for the rebuild of the railroad tracks. So, that will save us a little money there. so what we'd like to do is take any questions generally about this or comments. as we were walking down the street, we had some people approach us and they seemed quite anxious to have this happen and, but if you don't want this to happen or if you do want it to happen, [13:54] feel free to step up to the mic. Just say your name and address. Make a comment and then once we've taken any comments in general, we'll let the group kind of devolve into looking at the maps and these guys can answer specific questions. You may ask, "Is my tree going to be affected?" Or maybe you want your tree affected and also that it would get taken down. so feel free to ask questions, things like that whether regarding trees, mailboxes like probably into the mailbox part already but [14:21] and these guys can address your questions and we're happy to discuss more. So, if anyone like to make a ask a general question or a comment, feel free to step up to the microphone. [14:31] Go ahead. I have a question. All the water once you get past the railroad tracks comes to the backside of my property and comes to a broad and goes to the road. the drainage system there and I don't know who did it but the water comes from What's the what's the road past right in my I don't know what it is but I don't know what it is. All that water there. [14:52] How are you going to address cuz we have a ditch that runs the whole length of our property? [14:57] Can you give your name and address just so these guys can identify better? [15:00] 146 Tedford Road. [15:02] And your name is? [15:03] We got We got that We got that cuz it comes and then it turns and it goes right down the road. It comes to all the water from out back there comes right through our property. [15:13] Yeah, I [15:13] Once you put a sidewalk there, we're going to lose that ditch and I'm assuming you're going to put a bulkhead catch basin in on my property the [15:23] Yeah, I'm familiar with which property that is. It's like a masonry building and there's the ditch line that comes down then follows the road and there's a culvert that goes across. [15:30] All the water from out back down through there. [15:33] Yeah, it sure does. So, yeah, we 've actually been looking at that area pretty intently trying to trying to work that out. And what we're proposing right now is that where your swale comes down and then makes that 90. So, where it makes that 90 degree now, what we'll propose to do is put a basically like a culvert inlet at that point. [15:54] And then we'll have a the ditch line that goes across along the road there. What we're because to your point, the sidewalk is basically going to kind of come into that. So, rather than trying to re-grade a swale and everything else, what we're going to do is try to take advantage of the low point, put a catch basin in there with maybe like a dome top on it or something like that similar to what you see on the on the southern side of the railroad tracks on the flatter areas. [16:17] There's some There's some yard drains. So, we would basically do something similar to that. That would then tie into the closed drainage system. That closed drainage system will then proceed down to the cul- to a culvert crossing and empty out into the into that pond area. [16:34] Mr. [16:35] Larry Waters, 87 Pepper Road. There are a lot of large pine trees right next to that property and all along the road. Have you had an arborist come out or anybody make sure when you adjust the road, you're not going to deteriorate [16:54] Are you going to make sure you have somebody double-check you're not going to deteriorate the trees to the point where they could fall on our houses, neighbors' houses, anything like that? [17:09] I'd be too explicit to answer your question. No, we have not had an arborist come out and do that. and we haven't had a chance to assess each individual tree. I think that the I guess in consideration of that, the trees that are very close to the road, we're going to be looking at a full box cut, that's what we would what we would call it, which is basically that we're going to go have to go through because as Mark mentioned, the road is kind of an older road which never really had an appropriate subbase. [17:39] One of the parts of the reconstruction of this road is that we'd have to dig down, you know, 2 to 3 ft and box cut out that existing area, put back in appropriate materials to rebuild the road back up. So, the impacts that we're talking about along most of the road are relatively shallow in comparison to tree roots. [18:01] so, I think that some of the larger trees that are farther back from the road should not be affected. I think the bigger question is the road the trees that are directly on the road now where we're going to be widening the road, those ones that are probably going to be affected and those are the ones that we would look to probably take down during the construction of it. [18:24] I live across the street at 84 Timber Road, and they have a large pine right on their side of the road at 87. if the if the root system's disturbed, my tree roots the only the taproot grows deep. The rest of it's shallow. So, when you disturb the root system of that tree, it can reach my house, and it can reach my child's bedroom. so, that's a major concern of mine. [18:46] Yeah, I don't want to have to spend every night wondering if a tree's going to crash on my children's bedroom. I now I'm in favor of the project. I just want to make sure that the safety of my house is addressed as well. [18:56] I'd say use tonight the once we kind of break up to them call these guys' attention, the particular trees. like for instance, there's one in front of Mr. Muzzy's that when we were out walking the road, there's a large one there that they said, "Yeah, it'd probably be better to be gone." And we talked to Mr. Muzzy, and he said, "Yeah, it'd be fine with me if it came." So, if you've got trees that you're particularly concerned about that are near the road, call it to their attention, and we can figure out how to address it. [19:29] Individual 43 Timber Road. Does any part of this plan involve I thought in the past when they talked about this, there was plans to like open the other end of the road up. Is that ever a plan to like alleviate some of this traffic from [19:44] So, the owners of the Highland have come into our planning board multiple times to get a plan approved for a memory care facility that would be on Audubon. they have said at different points that if they when they build that, they would build the road similar to what they did with what they used to call Mountain Road, which is now the public portion of K&M. [20:07] So, you'd have a multi-modal path on one side, and you'd have the street in the other. then they've said at that point, they would like to propose to turn it over to the town to become a town road. the town had a traffic study done mid-2000s that said it would it would like to have another way to get traffic [20:28] than going through the four corners at 196 and 201. So, kind of the vision we've been working on in pieces is to eventually have a connection that goes from the schools that the buses are already using even though it's not public road yet. but come up K&M the part that's private and then get to the K&M part that's public out to Village Drive. [20:48] Village Drive is now public and then eventually have Audubon become public and connect to Tedford. so, that's kind of the long range but there's a couple pieces that need to happen before that. One is the K&M piece needs to become built appropriately to be a town road and then be accepted. And then the second piece would be the Audubon one. But see, the K&M would probably happen before the Audubon one. [21:12] So, it's not in the plan though. [21:13] So, long-term plan but yet nothing in the immediate future. Discussion. [21:17] Thank you. [21:20] I see Jenny Little who's the president of the Topsham Trail Riders here. Can you guys talk a minute about the ideas that we've got for dealing with where the ATV trail in the area of the river tracks? You want to show that section and talk about it? [21:35] I have a question on that lease. [21:38] The lease? [21:39] Yeah, the lease that they're going to Who are these people that coming in and going to store cars out there by the Tedford road on the railroad track? [21:47] It's the Whoever the company is that's leasing the Rockland to Brunswick piece of the railroad tracks. [21:54] Okay. [21:54] They're currently storing cars on the piece of the railroad tracks that is basically between Route 1 and what they used to call Hobo Junction. [22:02] So, the Brunswick [22:05] Right now, they're currently storing there but they've asked for a lease so they could back cars further up basically to come as far as the Cathance Road sidings. [22:13] Well, that's just funny you use that word hobo because I'm thinking of storing cars and we've got a lot of people walking up down Tedford Road. Now, we have that connection going up into the Highlands. The concern of mine would be who's who's going to monitor this? Are they going to be locked? Is it going to be hazardous material in them? What could What 's the rules this company Can they store anything they want in these cars? [22:39] You know? [22:39] I think they're empty cars, but at this point the state hasn't granted them the lease. So, I don't really know any details on that part. I mean, to be honest and Ryan Banton has heard from me before, my hope was we could actually take the trestle down that's on Elm Street because we've got an 18-in sidewalk on Elm Street and no bike lane. [23:01] so, what we would do is working on pieces of a master plan, it would be nice to be able to take down the trestle at Elm Street and then if Thompson were to be involved in the first section of this trail over the railroad tracks would go from Elm Street to Tedford Road and you'd kind of go in a decline from Tedford Road to Elm Street so that you could bring the traffic or the pedestrian and bike traffic or the trail traffic down to Elm Street level so then people could get [23:31] onto the Androscoggin River bike path and cross over the Merrymeeting Bridge. but the state right now is reluctant to listen to me too much because they've said as long as they've got a trestle that still could hold a train, they don't want to have it removed. so, but you know, things may change. They haven't made any final decisions. [23:52] That's what I'm lobbying for is to try to get permission that we could get rid of that trestle but as of yet this because of this proposed lease, the state hasn't been to the point that they want to say we don't want we'll let you take the tracks up. [24:06] Well, no,, that the state doesn't live down there either, but I'm just saying. You know, that I'd rather keep it on the budget side so I'm on the southern bottom. [24:14] That [24:15] You don't know what this company is going to bring those railroad cars and [24:19] And Thompson is not asking to have railroad cars. [24:21] And they're going to have hazardous material stored right there. And the state giving them the license and we won't be there. But that doesn't We don't okay it. We have no [24:30] role in that. It's the state geo Yeah, exactly. [24:34] It's a state decision. [24:35] I'm asking for to them to consider letting us It first was just not to put the tracks back in crossing Tedford Road. And then the next piece would be for them to consider letting us take down the trestle and build that as the first piece of you know the rail trail. [24:50] And how long would that be speed for? Lifetime or [24:53] I doubt it. Again, it's not with us. It's with the state. But usually there's a period of years and usually the railroad eventually goes bankrupt and then you know at least the Brunswick to Rockland Railroad seemed to go bankrupt. They only last a few years and then [25:06] Yeah, it seems like we got some questions on that now. [25:10] The cement plant is closing and it looks like I think the cars that I see at least over the railroad tracks are ones that would carry cement stuff. So if this once the cement plant is done, that may negate some of that desire anyway. [25:26] But we have we have no ability to approve the lease. We're actually again at trying not to get the lease there. [25:33] You're trying not to let that happen. [25:36] Right. [25:37] Okay. [25:37] Cuz I would like to see the trestle go away so that we could make Elm Street better and then have a nice bike pedestrian connection from Elm Street to Tedford Road. [25:47] May we end? [25:48] Hi. Are you done? [25:50] Yeah, one more comment on that. It was my interpretation also that the actual car storage was going to be further up from like Madeline Drive to Camden Road where it's a double set of tracks. I wouldn't foresee them storing anything on the line cuz it'd keep them from making those. That was my interpretation. [26:10] Yeah, it's a it's you know certainly opens up a big path for anybody. I don't know what the lease looks like or what it's going to say but [26:19] We don't even You know, it's [26:21] But there is a double set of little known double set of tracks. [26:24] Yeah. [26:25] A little bit further up [26:26] They're talking headed up [26:27] headed towards Camden Road. [26:29] Yeah,. Camden and then mile and then you know, where it crosses over there. [26:34] Pass that too. Pass that. [26:37] I don't understand. [26:37] Yeah, it actually is it's funny it goes past Cat ants but in on Cat intro the double set is down to single. [26:45] Which is close. [26:46] Yeah, so it's like double single double. [26:51] Well, I like your idea Mr. Manager. [26:53] No, it's not. [26:59] I just learned that I got a plus from the bike ped committee and as long as you're talking about bike pads. [27:07] Wouldn't it make sense to try and put bike lanes on this road? [27:12] No. [27:13] Yeah, it would be great to be able to include that if we could. Unfortunately, the width of the right away just won't allow it. we have the right away that goes along Tedford Road right now is defined as a two rod road which is effectively 33 ft wide. and so when you have the two 11 ft travel lanes and then the 5 ft sidewalk, [27:39] that effectively takes up most of the right away as it is. So, unfortunately for Tedford Road, it's not a great fit only because there just isn't the real estate there to support that many lanes all the way across. [27:51] And my other question is the sidewalk, is there any space between the road and the sidewalk? [27:57] Oh, and again, just given the width of the road, it 's going to basically be a curb and sidewalk. So, there won't be a there won't be room for an esplanade in between the sidewalk and the and the driveway. [28:08] I just most roads are third three or three rods wide or 50 ft. So, this is a little bit unique or it's a very old road. It's it's it's very narrow, you know, it's it's 17 ft narrower than a than a typical road. So, we just we don't have room to do anything within that right away beyond reconstructing the road and just building a new sidewalk. [28:32] [clears throat] [28:35] Well, my name is James and I live at [address]. Myself and the neighbor on either side of me is willing to give up land in order to have a green strip. But if the lady was willing to ask for it. Is that possible? [28:52] If you wanted to give up Well, let me qualify that. You probably couldn't give it up as long as you need to have enough setback. You know, moving the property line. but it doesn't do us too much good just to have two houses that want to would need [29:09] but then I know that's still a small number. [29:12] So, yes, it is certainly possible to give the town land or an easement to go on your land if you wanted. but unless we could do that for a big chunk of the road would doesn't really help us widen the road. The other problem we've got is where the CMP poles are. the sidewalk's going to be basically right up against the CMP poles and we don't want to have to move poles cuz we'll add hundreds of thousands of dollars to the project. [29:37] So, we're trying to use the poles where they are. [29:41] Okay, thank you. With the back center siding up to the poles? [29:46] Yeah. [29:48] Glenn Thurston, I live at [address]. I was wondering how you anticipate the road looking when you're done. You Could you talk in drains on west side? And I know now when I wash my wash a vehicle in my yard, the water runs to the road and clay to the corner. [30:12] So, is the road elevation going to be pitched to the west and lower or is it going to be How is it going to take care of In the winter, it freezes from my house to the corner. [30:25] Yeah, and Steve, if you could bring up the profile on that beginning yeah. So, yeah, we 've taken a look at the of the running slope of the road, if you will, so the grade that runs, you know, along it. and that first section of Tedford Road is very flat. typically, [30:45] you know, typically you'd like to see well, I won't throw numbers out there, but given how flat it is, that's one of the that's one of the issues leading to some of the drainage concerns or the drainage problems that you're seeing out there today. So, one of the things that we're trying to do with this road reconstruction is to add some pitch to the road. [31:06] Now, of course, we can't add a ton because we just have to raise the road up, you know, those impacts have to go off. So, we're trying to balance, you know, keeping the road within the right-of-way and keeping the impacts to a minimum, but still provide enough pitch in the road to be able to drain. So, in that beginning section, we're looking at about 1/2%, which, you know, to be quite frank with you, is still a pretty flat road, but at least it gives it some improvement over [31:30] how conditions are out there today. In your specific area, the storm water is still in the runoff is still going to run in the same direction, and it'll still go to Middlesex to drain. but again, adding some pitch to the road, we expect there will be some improvement on letting that water run instead of it having it slow down or not even move. [31:50] [31:52] Cuz there was some talk about putting a catch basin or catch basins on that side to take care of that. Cuz we talked about tying into the end of the road. But that was explained that 's a state road versus Tedford Road drainage. [32:11] Right. And to be frank with you, it's a great it's a great comment and something that we can look into a little bit more to see if it's appropriate to put some catch basins on the non-sidewalk side. but again, you know, I for the non-sidewalk side, most of the drainage on that is going to remain relatively close to how it is today. [32:32] again, what we're trying to do is we're trying to make sure that there's enough pitch in the road so can sheet it appropriately so that it won't stagnate on the road. So, if you get trying to minimize the icing conditions and that sort of thing. [32:43] Is that the only thing in my driveway, even if it does drain to the other side of the road, it's going to run across the road, you know. [32:50] Well, right. And we wouldn't do that, either. We're proposing to have a And that's kind of part of road reconstruction, as well, is putting a crown back in the road. in the some areas of the road that are just really flat and just kind of really beat up, you know. So, that's one of the other things is trying to put a crown in the road going, you know, kind of across it, so that the water will sheet off, and then putting pitch in the road, so then the water will run. [33:16] and so, as part of reconstruction, the curb lines or gutter lines will be better defined, so that water will run away from the road and run along the edges instead of down the middle. [33:26] Yeah. [33:28] I know on the plans, it says possible impact. I have two pine trees and a chain link fence. Do you anticipate that 's going to be [33:41] We're going to cut those trees, and I was asking you earlier if you'd move the fence back or what would happen there? [33:50] Yeah, if the fence if the fence doesn't, in fact, need to be impacted, then the fence would get replaced or pushed back, depending on what the configuration of the fence would be. On trees, again, we'll have to look at that on a on a case-by-case basis. I 'll say this off the top that the trees that are very close to the road, I think it would be in most people's best interest to have them taken down, if there is if that's amenable. [34:17] Right. [34:17] we could try to work around trees to the best of our ability, but again, discussing the box cut and the shallow roots that were discussed as well, you know, there's a risk to keeping some of those larger trees. So, the more trees that we could take down as part of this, I think the safer that the road will be and, you know, less problems will be in the future. [34:37] Yeah. [34:37] I had a question to add to that. We're 141 and 149 on the gangs where you have that long run of trees at the end of the Tedford Road. So we have all those trees going to the culvert. [34:51] You're on the forested side of the [34:53] Yes. So I know I don't know how far you're [clears throat] going to go back, but do you foresee a lot of those trees having to come down cuz a lot of them are really close to the road. [35:05] Yeah, I know I know which section you're talking about. So that's really between the culvert crossing and kind of the first houses. So it's a really wooded area. I think that section will see some trees taken down. we don't anticipate going very far from the existing edge of road on that side where the you know where the where the sidewalk isn't going. [35:28] so you know, I would say one or maybe two trees back would be would be about what we would expect. [35:35] Okay. And the other thing we wanted to ask is with you bringing the water up the road, most of us, you know, we have wells. What is going to be the cost for us if we wanted to tap into the water? [35:52] Yeah. so [35:54] Well, on the west side you're going to have you're going to have the sidewalk there and you have to defend where you don't tie in prior to the sidewalk. [36:01] Yeah. And so some of this will have to be discussed with Brunswick and Topsham Water District, but I what we had talked with TC about is that possibly we could we could [sighs] we could we could work something out where the contractor that's doing the work [36:21] puts in the services at a cost to the homeowner. the alternative to that would be while the work is going on, you know, before the surface pavement is down, each individual property owner that would like a service hires a contractor to tap into the main and bring a service in into their into their property. [36:41] So the idea with extending the main would be to, you know, for the people that live along that stretch the ability to tie into public water, but it would be at those individuals costs at least in terms of tapping in a service. [36:59] We will be losing benefits on the path fee. [37:03] I can't speak for the water district, so I those are things that we'll probably have to figure out later on just in terms of how that gets how that gets paid for. [37:12] Cuz we're getting charged for water that we're not using for the past how long? [37:18] Sewer, too. [37:19] Well, that's probably what we [37:20] 15 years. [37:21] 15 years and sewer. [37:25] That we don't even use. [37:26] have We don't have We don't have the service. [37:28] We don't have the service. [37:29] They put in the sewer and [37:30] After the railroad tracks. [37:32] And they put in the water. And they made us pay a minimum fee for the last five or six dollars we ever had water. [37:39] So, have you bought that? [37:40] We yes, we've all [37:41] on it. [37:42] I think we're going to have to do it about it. [37:44] I don't think we need to be fine. [37:46] I don't [37:47] Those people should have some kind of we were hoping to get some kind of stipe on the path fee, you know, because we've been paying for something that we haven't used forever. [37:54] So, you've been paying for water even though you can't get it? [37:56] Yeah. [37:57] Yeah, and sewer, too. [37:58] It's It's a sewer [37:59] Well, the sewer line does go by there, so that makes sense. [38:01] It's the sewer fee that we pay, but everybody else on the Tedford Road We don't have any water meters to get that. And we've been paying a water fee. We only get just the sewer line. That's it. [38:15] They And but they charge us a flat fee because that's how we get our water. [38:18] That's that's part of the reason they joined in this project cuz they want to put a water line there. [38:22] Exactly. I mean, I'd like to and run it up there. [38:25] We'd like to tap into it. [38:27] Right. [38:28] I don't want to pay three bucks cuz I've already paid three thousand bucks for something I haven't used. [38:33] Well, the water district and the sewer district are two different entities. So, if you've been paying if the sewer line goes in front of your house and you don't join in, yes, I do believe you end up paying just because it goes by your house. hopefully you haven't been paying a water fee yet in that area cuz if there isn't a water line to tap into then [38:50] You have to meet a stranded. You have to meet a the water to get the sewer bill. That's what they mean and this is [38:59] What I can tell you what we will do is I'll pass along to the water district engineer that there's people here tonight that are interested in knowing more about how the connection water would go and maybe they'll do like a mailing or something or we could put something on our website with the answers. [39:14] I don't think anybody is against the water coming down there. It would just be nice like you said to get something for your for your, you know, 15 years of paying. The money you've been paying for nothing. [39:27] Yeah, and again, I'll have to leave that to defer to the water district cuz that's up to their policies, management, their laws, which I'm not actually up on those. [39:36] just one other quick question. with moving the mailboxes to the other side is that are you going to tell us where they're going to put them along that tree line cuz there's going to be you have like you know there's a bunch of trees there that is a brutal system. It's kind of brutal there to bring those mailboxes across. [39:57] Are you going to state where they need to go or are we just going to talk with our neighbors and figure it out? [40:06] That's a that's a great question. I [40:08] a wooded area there. There's there's nothing out there as you know on 149 so yeah, at the end. [40:16] And I heard the same thing. I heard that you guys are going to pay to have the mailboxes put in just like the hydrants, the new hydrants. I heard you guys are going to take care of mailboxes. Is that true? I don't know. [40:29] If we're making the mailbox be moved, it's likely we would make that be part of the project. [40:33] You would. Okay. [40:35] And Sorry. [40:37] No, go ahead. [40:37] Yeah, I guess I'm just going to answer your question and I think part of this part of part of the answer with the mailboxes is some of this will likely have to be done kind of during construction with the contractor working with you when we have to relocate those mailboxes and field fit the best location for those, you know, both from a vegetation perspective, but also safety perspective. [41:00] so, we'll we'll have we'll place holders on the plans. the contractor would be responsible for relocating the mailboxes, but we'll we'll probably just need to be a little bit cautious about that during construction and make sure they get put in the place that's that's safest for, you know, whoever needs to walk across the road to pick up their mail. [41:19] I think the biggest thing is like on our end down there it's the vegetation as you saw is really super thick. [41:25] Yeah. [41:25] You're going to have to remove a lot of vegetation to put a mailbox. Possibly. [41:31] Yeah. Yeah, the Sure. And these will still be close to the road, maybe the idea is that, you know, there we have a shoulder on that side and they're they're going to want to put they're going to want to pull up and be able to put the mail in. So, we're not going to be setting these back really far. They'll still be pretty close to the road. so, I you know, we would have we would avoid as much vegetation disturbance as possible with, you know, with where we're locating the mailboxes. [41:54] When we were walking the street last week, we got nervous that we were going to have to move a cemetery. Cuz there was there was a house just before that wooded stretch that had a cemetery by their mailbox. [42:04] Yeah. [42:04] Good news is it wasn't real. So, it wasn't it was that just a decoration. [42:14] Yeah, we were worried about that, too. Like if we had to if we had to move all that stuff back that we have there, but I think it's far enough back, but we can talk about that. [42:22] Yeah. No, as I said, on that side of the road it's pretty much the back of the pavement. It's not going much past that where our car leaves is. [42:29] We have a question. [42:31] Where do you guys Where's the outlet for the storm drain? [42:36] that's a great question. Yeah, there's there's a few. so, for the beginning of Tedford Road, again, the flat area, kind of, you know, south of the railroad tracks, there's already existing catch basins that are along the road. And so, for the majority of those, the intent is that we're going to be using the existing drain outlets for those. [42:58] So, really what we would do is that we'd have to replace the basins themselves just to align them better with where the proposed curbs will be, but the outlets for those will all be the same. For the area north of the railroad tracks, we are looking at proposing a new outfall that's basically going to be in the same area, as the riprap for the cross the riprap is the stone that, lines the that new crossing. [43:24] And so, what we would look to do is to bring the stormwater from the about from where the railroad tracks are, bring that north, and then outlet it out the bank that way. [43:35] So, are you going to have some provision to make sure that water doesn't contaminate the farm water crop on my own farm land? [43:44] Cuz that's what's going to end up cuz that's it's going to go right down through our farm. And that water is used. [43:51] We are not proposing any treatment for the stormwater as part of this project. [43:56] To make sure it's not contaminated? [43:58] It always gets contaminated. [43:59] Right. Roads all come close. People throw trash everywhere. [44:03] Yeah, what is the law on that? You can just run a storm drain any way you want, just dump it? Is that what you're saying to us? [44:11] But, for municipal projects, treatment is not required. Correct. [44:17] And the water's probably [clears throat] going to end up in that same stream down there anyway. It's just it will be more organized how it gets there. [44:24] Well, there used to be a beautiful pond there. [44:27] Yeah. [44:28] I mean I mean the structures that we'll build, they'll have they'll have sumps in them that are that are designed to, you know, take a lot of large debris. [44:37] Right. You're going to have a sediment grease trap type of thing. [44:39] Exactly. Yeah. Yeah. Yeah. So, it's there is some level of treatment just through the nature of how the underground structures are designed. [44:50] They actually had designed when they did the culvert, they intentionally designed that to drain the pond because we were damaging people's wells because when we get a big storm event, not enough water could get underneath the road. So, the intent They wanted it with the more frequent rains and higher rain amounts and stuff, they wanted to make sure they could get the water down the stream. [45:12] So, that was intentionally drained. wasn't an accident that the pond went away. Okay. [45:21] can you take a minute talking about what the ideas for the ATB trail? [45:26] Oh, yes. so, the at the railroad crossing, there's a there's an ATB trail that kind of comes down on one side of the railroad tracks, crosses the railroad tracks, runs along the shoulder line, and then goes across down the power lines. so, as part of this design, we are incorporating a what 's called a tip-down, which is basically just like when you have a sidewalk that comes to a driveway or to a road, the sidewalk tips down, and then kind of runs at grade [45:56] along the road. So, what we're proposing is that effectively opposite where the trail goes up the along the power lines, we're going to have an 8-ft wide area that will allow for at grade crossings there. So, snowmobiles, ATVs won't have to ride up the curb to get to the back of the sidewalk. [46:17] There'll be a depressed area where they can cross there. Then they can ride along the edge of the sidewalk and then rejoin up with the existing trail. [46:24] So, currently the trail they kind of they come in drive, go along the side of the road, and then get this way. So, the thought is the sidewalk is going to end has to be at least 12 ft from the railroad tracks under the for the railroad rules. And then things will be at grade until you get 12 ft after. The sidewalk will start again. [46:45] The ATVs will be on the back of the sidewalk until there's a place they can cross perpendicular to the trail. And we're probably started talking to CMP, and it looks like they will be fine with that. so it keeps the ATV traffic from having to go along the road. It will so they'll just cross it perpendicularly. [47:05] In that same area that's it's probably worth noting too as far as the sidewalks and tip downs is that there's there's a trail that's that comes out right there but there's also an existing gravel road that kind of creates a little triangle there. So the sidewalk will still respect that. So the sidewalk tip downs will be on the other side of that gravel drive. So the gravel drive and the trail will still have [47:27] access through them. [47:33] Looks like there's a question in the text. Does the current plan take into account bicyclists who may be traveling on Tedford Road? [47:43] And I believe we've already answered that question earlier but unfortunately given the narrow width of the right-of-way and the need for 11-ft lanes and a sidewalk, we just don't have available right-of-way to be able to include dedicated bike lanes. [48:01] But sharrows are a possibility, right? [48:03] Sharrows? [48:04] You know the sergeant [48:05] Oh, right. Oh, right. I think that's Yeah, that I think that could be something that could be incorporated into it but it would certainly be a shared lane rather than a dedicated bike lane. [48:16] And there's also I think we talked this 2 years ago that if someone wanted if child's riding a bike on the sidewalk, the police department isn't going to have a problem with that. [48:24] We're not going to have a problem with that. So they're allowed on the sidewalk. Okay. [48:28] Yes. [48:32] Ryan Benton, Bicycle Pedestrian Committee. I have two related questions. One is about the long-term traffic plan. Mark, you talked about that a little bit. Could you just maybe say a little bit more about the long-term traffic plan? And then the second question is regarding current traffic volumes on the road. [48:53] do current traffic volumes necessitate two 11-ft lanes? That's the That's the second question. so, for the first one, what I've talked about is pieces that could be put together, you know, hopefully to eventually get this connection that goes from the schools out to Middlesex Road using Tedford Road, Kittery and Village Drive. [49:16] at this point, the Audubon piece is just that, you know, it's just an idea. Hopefully, we can make that happen. the what it certainly isn't going to happen until such time as Highland Green decides to build a memory care facility and upgrade Audubon. in the Kittery and that's still a private piece of Kittery and between the top of the Everett Hill and Republic that isn't public. [49:41] so, [clears throat] I can't tell you what day any of this would come to fruition because it's things we'd like to make happen, but there's nothing in place. I'll let you guys answer the second part of what you're asking. [49:52] So, would part of that plan be like when all that comes to pass to route school buses, etc. through that route? Is that the idea? [50:02] I doubt the schools would ever want, you know, other than maybe a school bus to go to Tedford Road if that all came to pass. They might decide to do that. But all the buses that they've got right now going up Kittery and down Village Drive to take advantage of the lights to get on 201 to go to Harpswell or something, I'm sure they wouldn't want to bring those up Audubon. There wouldn't be a reason to. [50:24] your second question was about [50:27] lane width compared to traffic volume. [50:29] So, yeah, I'm I'm wondering if the current traffic volume necessitates 2 11-ft lanes. [50:37] Yes. Well, so the 11-ft lanes that we're proposing here actually mimic the existing conditions on Tedford Road. So, that's about That's about what we have right now. It's about a 22-ft wide road. So, what we're trying to do is replicate those conditions and not make things and try to at least maintain the same amount of traffic [50:57] traffic conditions that we would have out there today. [51:01] And this would have a This would have a yellow center line. [51:07] Yes, that would. Yes. [51:09] So, for example, in on Green Street in Topsail, we have a lane or excuse me, an old road similar width with no center line and we've got a painted sidewalk/bike lane on one side. I'm wondering if something like that Do you need a center line? Could you buy yourself some space on the sides by getting rid of the center line? [51:34] And then maybe you don't need the sidewalk because by the traffic volume on the road currently is fairly low by road standards, could you get away without doing the sidewalk and having an at-grade facility for both bicyclists [51:54] and pedestrians? [51:59] Well, it's a good [52:00] There's enough foot traffic on that road right now that you do need a sidewalk. I mean, I think about that. We need a sidewalk. I see people with carriages and kids. [52:11] Yeah, we [52:12] Going up and down that road again. Get off the road or there's someone's wall and protect themselves. We really need that sidewalk. The traffic is on the one on the opposite side of the road to get away from us while we're trying to walk. [52:27] It's Green Street is far from a safe street It's a very difficult situation, but I'm just leaving the plan as it is and that's my preferred situation. [52:34] Eventually, the sidewalk but from the other side of the road. If that bank had just came down with [52:40] Maybe I'll do a quick survey. Raise your hand if you're in the room and you live on [street] or one of the roads off of it. Put your hand down if you would rather not have a sidewalk. [52:54] If you'd rather not have a sidewalk, put your hand down. Okay. [52:59] If you want a sidewalk [53:00] If you want it If you live on [street] and you want a sidewalk, keep your hand up. [53:07] And then, if you live on Next Question, but my general sense is that people that live on the road want a sidewalk. Next question, right again, put your hand up if you live on [street]. Raise your hand if you would rather have a road without a yellow center line. I'm sorry, put your hand down if you'd rather have a road without a yellow center line. [53:37] All right. So, from my informal survey, it appears of the Tedford Road residents here tonight, there's a general consensus that people would like the sidewalk, and they would like the yellow center line. [53:55] Steve actually can address the daily traffic. [53:58] Just in case any of you are wondering about your daily traffic, we've done three studies in the last year out there for traffic and speed, and you average Well, we did one last November, you average 901 cars a day out there. We did another week in March, and it was 883 cars daily. [54:19] And then we did one in July, it was 968. So, you're just under 1,000 cars [54:23] How many speeding tickets did get written? [54:26] I'm sorry, what? [54:27] How many speeding tickets did get written? [54:29] Well, we didn't So, when we do the surveys like this, we're putting boxes out there that they don't stand out, they just Let me explain this real quick. In the past, before we had these traffic survey boxes, we used to put the trailer out there, the big trailer that has the sign to tell people what their speed is. [54:51] Now, the problem with that is I don't think, and it kind of proved, we don't get accurate numbers with that, because somebody pulls onto the road, they see the sign, and everybody slows down. So, since in the last two years Well, last fall, we bought these small white innocuous boxes. You don't even really notice they don't get noticed by people. [55:11] We can put them up on a pole and it just sits there and counts traffic and counts speed. So, we've been using those for the last year in town. So, it gives us a better idea of what the average traffic is going on the road. So, if you'd like to know, I can tell you real quick. We've done three studies. 85% of the cars last November [55:33] were going 34 or less. we did a study in March. 85% again were going 34 or less. We did one in July, they were going 33 or less. Half the cars [55:45] It's 25. [55:47] I'm sorry? [55:47] They were all speeding but it's 25. I've called multiple times but the people are just flying down the road. I feel like there's more control there. I've offered for police to sit in my driveway. [55:59] I told you. [55:59] Please, by all means. [56:00] Yeah, we've done 11 studies. We've We've done 11 enforcement details out there and when we're out there, we're not getting we're not getting the speeders. [56:10] I live on [address] at Fred Road. I have a fence. So, just sit right there. Guaranteed you'll get a lot of people. [56:18] Well, I don't I'll tell you to be perfectly honest. We generally don't write I mean, yes, 1 or 2 or 5 mph is speeding but we don't write people summonses for that. [56:28] Well, they must have been tipped around because you haven't caught the dragsters yet. [56:33] Yeah, no. I mean simple fact is the people are warning each other when we're out there. There's only so much we can do. We put the boxes out there, they show that you know, 85 are going 9 over or less. But when we go out there, nobody's doing it. Two years ago when we had this meeting, there was quite a bit of comment about speeding. [56:54] We spent 7 hours over the next 2 months out there. We got a car at 34, we got a car at 35, one at 38, 37. So, the simple fact is we're going out there but you know, people give each other lights. We don't We're not getting it when we're out there. There's only so much we can do. I hear you. [57:13] That's one reason why I was asking about the trees in front of my house and that chain link fence. Cuz I understand that was Those trees were planted and the fence was put there when a car came out of the old Rusty's probably sideways and hit the house. [57:36] I mean I hear what Again, we're getting most of cars are 9 over or less. And when we go out there, we're not getting them. So [57:45] Yeah. [57:46] You know, we do. [57:47] You got to hide though. [57:48] Well, you know, people always tell us that. The problem is the science of radar. We need to have a straight shot to get them. We can't be up somebody's driveway and have a car go by and get it. It's just radar doesn't work. [58:01] You can come sit by my mailbox cuz every time I go to get my mail, there's people going down the road at least 40, 50. [58:07] Going to the cul-de-sac. [58:10] Cul-de-sac. [58:10] Yeah, and again, when we go out we're not getting it. Everybody's warning each other and I'm sure what [58:16] the information along. Car's sitting out there, so they slow down. [58:19] You can use a white car. You can sit in a white car with your radar. [58:23] [laughter] [58:24] Other questions? [58:27] Yes. In years and years we've been talking about connecting the Highlands from the end of the after growth and they brought down the sewer and brought down the water and drained the pond and everything else. So they're all set up that way. Do you have any you know, future prediction when that is going to be connected? [58:49] I know there was a process This has been going on for I've been hearing about it 10, 15 [58:54] That's what I was talking about earlier in the meeting. But it won't happen until they build that memory care facility. And they The Highlands is trying to be or Highland Green I should say is trying to be or wants to be full service. So you could go from independent living to assisted living to and then there's memory care facility. That's what's proposed for Audubon. [59:15] They've come in They have to come in to keep getting their permits renewed cuz they It's all been permitted, but then they don't build it. So, they got to come in 6 months or a year to get permits renewed. They've been doing that for years. so, at this point there's no firm date when they would build that facility. So, there's no firm date when they would finish Audubon. [59:34] Okay. [59:37] Yeah, that particular subject was talked about back when they put the big neighborhood down there. [59:43] Yeah. [59:43] Because and that became evident this past week. They had a head-on collision down by Rusty's and all the traffic had to go through either Rusty's yard or make their way through the accident scene. [1:00:00] Yeah, they've been When we've needed them, you know, to help us out with the connection, they've been willing as I mentioned when we did the culvert work and I know they would work with us on the railroad piece. but the town doesn't want to build that road. You know, so we're basically waiting for them to do their memory care facility then they would build it to town specs and then we could accept it. [1:00:19] Right. [1:00:21] I have a quick question. I'm sorry for being late earlier. question, could you speak to the timeline wise? Like is this a 5 year down the road? Is this like we're starting July of next year? Again, my apologies for being late if this was already [1:00:34] No worries. it'll It's all going to depend on the final budget numbers that come in and then planning is the budget goes through this spring. But the hope is to have it summer of 2028 would be the project. Sorry, 2027. I'm getting my years confused. Fiscal year 28, which is [1:00:51] How long do you estimate it would take to do the project? [1:00:55] It's a big question. [1:00:59] It would be mostly solid. [1:01:00] Yeah, I would say so. Like, you know, probably 3 4 months. [1:01:04] Okay. [1:01:05] Thank you. [1:01:09] Other questions? [1:01:13] Any more online? Or I know. [1:01:18] I have one more for me. when the past road commissioner was here, he told me that we could still keep our mailboxes on our side of the road. And I'm wondering what changed that. [1:01:33] Postmaster. [1:01:36] The post The Brunswick postmaster's in charge of all the rural delivery. And when these guys contacted him, he said they could probably leave your box, but they all have to be moved to the side of the road. Correct? [1:01:46] Correct. [1:01:50] He said they he had a place where he was doing it right now that they had some place where the mailboxes were staying on the sidewalk side. So, he says, "Paul, you won't have a problem. You'll still be able to have your mailbox on your side of the road." [1:02:03] I think what's happened is you've all seen the stories on TV about people aren't getting their mail. or the post office can't find enough workers. And so, I think they're using this as an opportunity to try to make their mail more efficient on Tedford Road cuz it's certainly easier for them to deliver all the mail on one side of the street. so, [1:02:23] That doesn't make sense to me because they got to come back down our road. So, as many stops as they have, they're going to have that same amount of [1:02:30] Yeah, but now they [1:02:31] They got to go in two directions [1:02:32] Now there's a sidewalk in the way so they can't They have that They have that gap between the road Yeah. [1:02:39] No, they told They told me that it could be done with the sidewalk and my mailbox could still be on the edge of the road. [1:02:45] Yeah, they changed that. [1:02:46] They hadn't changed it. [1:02:51] Cuz believe me, we'd rather not move it if we didn't have to cuz it costs us more money to move the mailboxes. [1:02:56] There's a There's a method through the postal service where you can put in a hardship and you can try to get them forced to hand deliver your mail to If you have an issue, you can make a complaint to the post I'm just letting you know that [1:03:04] I don't like that. [1:03:05] Thank you. [1:03:07] Any other questions? [1:03:09] if no other questions, what we'll do is we'll stop the recorded portion, large group portion of the meeting, and you're free to look at any of the drawings and if you have particular trees you want to call to these guys attention, feel free to do that or any other issues you want to call their attention and we'll move on to that now. [1:03:30] We brought a bunch of cookies, too, so please take some. Otherwise, the chief's going to have them all himself. [1:03:36] I think he already ate all of them. [1:03:38] All right.