← Back to MaineScanner

Pownal Select Board Reviews Public Safety Facility RFP and Approves Fiscal Adjustments

2026-10-26 · 1h 50m · Source: October 26, 2026 Select Board Meeting (Town of Pownal (YouTube))
Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[0:18] Speaker A (unidentified): good evening i'd like to call tonight's select board meeting to order is monday october 26th first order of business is a workshop future facilities committee they are presenting a draft request for proposal for the public safety public works facility so it is our job to approve or disapprove this rfp is there any support from the committee was proposal or does this proposal stand on its merit [1:32] Speaker B (unidentified): the proposal here has [1:35] Speaker C (unidentified): has three small edits in it i'm sorry and we [2:02] Speaker B (unidentified): are expecting kyler who's going to show you the plan as well let's see on the second page section a the third paragraph down we've added the word to the town hall the next paragraph down the last sentence it's produce instead of [Speaker C (unidentified): produced on] section two calling page section 2b second line down history and description of the firm include versus including and i think that's it i thank becky for the edits susan i'm going to [2:58] Speaker D (unidentified): to pop in on the one that says they added hall actually that's where I put the placeholder for the comment and then if you look so the word was already there but when word when you're tracking changes I just highlighted that and suggested that we list out the major public works equipment in that paragraph to be consistent with listing out the fire departments go right here fire department's equipment above because i suspect that could be a question from potential proposers to the rfp wanting to know how much public works equipment might be housed indoor in the winter so that was just my suggestion and my apologies i am the one that missed that it's just the way word highlights things when you add comments you [3:54] Speaker A (unidentified): tell me where that is because i'm a little lost here where is the listing of equipment going to be and what these pages are [4:01] Speaker D (unidentified): i don't have numerators this is different from that one so if you go to page two and the third paragraph down stop i'm sorry numbers on these pages okay the second page second page third paragraph yeah at the very end where it says town hall i just put a comment in there to suggest that we list out the major pieces of equipment that public works has how many dump trucks greater excavator bulldozer things like that because earlier in the RFP they listed out the fire department's equipment and I think that's relevant information that a proposer might ask in the q a portion of the rfp thank you yep so [5:03] Speaker A (unidentified): becky has this gone to the attorney [5:07] Speaker D (unidentified): not yet it was stated in an email last week that you wanted isabel lee to look it over she was away at a conference and she got edits to me very late this afternoon so you probably haven't even gotten a chance to see those and i printed one copy off her notes were so at the very beginning in that first paragraph where you list four million nine hundred and twenty thousand she commented this isn't the more up-to-date cost that we received from the construction estimator in twenty seven dollars she recommends using the more updated seven million one hundred and twenty five thousand dollar number which is what we used in the Warren articles as well and then could I ask the committee isn't [5:57] Speaker B (unidentified): this number the number that Kyler gave us minus can someone explain that please [6:07] Speaker E (unidentified): from our meeting my memory is that he backed off the things that were already being paid for because the and i don't know exactly how the architect fee goes but he said it's something about percentages and having things included in there that we already paid for could somehow affect the architect's fees because there's something that looks at the total cost of the project and i'm not 100 obviously him being an architect he could explain it a lot better but he backed off things like the study that was already done the civil engineering work that's been done and we already own the land and there were things that were backed out of that to keep the cost of the rfp when they submit their proposals to an accurate figure we'd have to get a you know a better explanation from him but that was what i understood yeah [7:07] Speaker F (unidentified): yeah so what mike explained is somewhat true the one thing that he really took out of there was the price that port city gave us was a all-in with all the fixtures inside the equipment and stuff that they would provide desks chairs tables that kind of stuff that figure backs all that stuff out of there because an architect should not be getting paid based on the cost of [7:40] Speaker A (unidentified): outfitting the building excuse me for being when you say that figure what figure are we [7:47] Speaker F (unidentified): talking about the figure in the first paragraph that isabel was discussing in her letter seven [7:53] Speaker D (unidentified): 7,125,000 includes furniture and fixtures furniture fixtures and some of the work that's already been done and this RFP is not for those items this is no it's yes for design [8:08] Speaker F (unidentified): for the construction of the building okay [8:15] Speaker D (unidentified): I can send that comment back to Isabel all [Speaker C (unidentified): all right all] right so then on to the next page she just suggested hyperlinking in those reports that you reference in one two three in the well in this thing it's the fourth paragraph fourth paragraph on your second page as well where you say town of panel main fire and rescue and public works facility need study she suggested putting in the hyperlink from the web page there it just gives it easy access to the potential responders okay and then she did add language which is incorporated by reference at the end of this rfp at the end of that same paragraph with adding the hyperlinks and I have forwarded this late this afternoon to you so you've got a copy of this because she had some edits she had a comment regarding the reference to the end of October 2026 where typically that's where the approval decision is made for the congressionally delegate direct funding and she commented I just want to be clear that the October date is based on a normal year for when congressional appropriations packages typically pass but it isn't a guarantee this is the budget that would need to pass by both the house and senate with our finals included so it may we may not hear in October it could be November it could you know we know they're not always on a schedule. So that is right before section B, where the project schedule, she referenced noting different language there. And again, I have sent this to you in email, so you don't have to worry about copying and I can give you this draft, it's fine, but. And let's see, was there anything else? That was it from her review. review and you can have that one invite so back to John's answer no I have not sent it to the attorney because there were some edits that came in and also would need direction from this love board to send it to the attorney for review but that would be next step once we get through this [11:07] Speaker G (unidentified): process any questions from the board so [11:16] Speaker A (unidentified): I think the for me the elephant in the room is the design I'M LOOKING AT A DESIGN HERE THAT IS DIFFERENT THAN THE DESIGN THAT WAS PRESENTED TO THE TOWN MEETING, AND I HAVE SOME QUESTIONS THAT IN TERMS OF WHETHER OR NOT THE SELECT BOARD IS CONSTRAINED BY THE TOWN MEETING VOTE AND WOULD HAVE TO REJECT THIS RFP BASED ON CHANGE [11:49] Speaker C (unidentified): design so [11:52] Speaker G (unidentified): could i comment on that not yet so does the board have any comments on that [12:05] Speaker H (unidentified): i have the impression i don't have insight into your procedural question my question is that i thought the design previously was to allow for expansion what do you mean by that does this allow for expansion as far as equipment based [12:29] Speaker A (unidentified): NEW SPEAKER P. EXCUSE ME FOR INTERRUPTING. THE QUESTION AT HAND IS DOES THE BOARD HAVE, WHETHER IT'S EXPANDABLE OR NOT, DO WE HAVE ANY AUTHORITY TO APPROVE A DESIGN THAT WAS NOT APPROVED DURING THE TOWN MEETING VOTE? NEW SPEAKER P. I [12:56] Speaker H (unidentified): THINK IF THE DESIGN WAS EXPLICIT IN THE VOTE, THEN WE DO NOT. [13:01] Speaker A (unidentified): NEW SPEAKER P. GEORGE, WHAT'S YOUR THOUGHTS? [13:03] Speaker I (unidentified): which town meeting vote are we referring to the one we had just back in june because fundamentally from what i recall this has been the layout within a degree that's been kind of pushed all the way through since last year this has been their conceptual design of having everything split on one side and the other with the apparatus space in the middle [13:32] Speaker A (unidentified): so with my understanding that there were common spaces in the in the middle [13:38] Speaker J (unidentified): that was the original conceptual design presented to the board that [13:47] Speaker I (unidentified): was before i was on the board [13:48] Speaker A (unidentified): yep so becky when you went to find the FIRST PROPOSAL, DID YOU SEE ANY DESIGN? [14:04] Speaker G (unidentified): YOU AREN'T HERE. NEW SPEAKER I WASN'T HERE. [14:07] Speaker D (unidentified): SO I DID REVIEW THE MEETING THAT PORT CITY CAME TO, WHICH WAS DECEMBER 9, 2024. AND IT TOOK ME A WHILE, BUT I DID FIND WHAT I BELIEVE IS THE DOCUMENT THEY PRESENTED, BUT IT HADN'T BEEN SCREEN SHARED. so I think it is the one in that document it does show a design similar to what's in this RFP without me looking at it in great detail the comments afterwards after the presentation from Port City the board had mostly between you and Andy O'Brien was after the holidays forming a new future facilities committee and a new charge which seemed the charge had been already drafted to start on the next phase and that would include a series of workshops with the committee i did not get a chance to review further into the minutes when we got started on that there was no motion second or vote taken after fort city's presentation on that whether the board fully accepted that in that way okay [15:14] Speaker A (unidentified): susan what do you have so this design [15:18] Speaker B (unidentified): was the design that the first committee came up with and agreed it was in the needs study from port city that this was a design and would there would be minor changes expected in the areas inside you know probably the office areas these this is this is the only i believe drawing that we have presented to the town at all it was in andy highlands presentation of their work in jan excuse me december of 24. on top of that at this last select excuse me town meeting isabel when we were having the conversations and questions were coming up again isabel did mention in her comments that this was the final plan however minor changes to the office areas or living quarters or whatever were expected kyler [16:27] Speaker A (unidentified): do you have anything to i saw you bring a board here is that something you want to present or [16:32] Speaker C (unidentified): are you going to be yes kyla [16:44] Speaker J (unidentified): feagles hudson road we have made some minor modifications to the floor plan that port city did and i'm prepared to walk you through it [16:55] Speaker A (unidentified): that might be the time that might be the time okay is [17:08] Speaker J (unidentified): there any way we can spread it out here i do need a little space either here or there come right over here okay and i encourage you long smoke yeah [Speaker C (unidentified): showing] you who is less complicated than it is what [Speaker C (unidentified): i'm] going to show you it's less complicated than it is initially going to appear and that does make sense once you follow through i want to start up with fire and rescue i want to note that it is the plan is oriented in the same direction as the site plan all right fire and rescue is the easier side to start with because it's just doing a few minor tweaks weeks i've got this [Speaker E (unidentified): this] is an exact copy of that and what i did is i went through and i numbered every single change that i wanted these two are exact copy yes so for example item number one there's a door here to the fitness room just suggested i went over this with jesse it was suggested that it would be better moved over here so that's the way it is hand wrapped okay what i did is i took all these and i just hand drafted this because it's at this point it's still conceptual exact dimensions so that's item number one two and three it's just this area is just a kind of a cluster you see we've got three doors we eliminated one door we just kind of streamlined this area here better in and out access you will notice too for example that this whole area is unchanged change. Four, move wall and door. Okay. Jesse wanted the SCBA room a little larger. That was easy enough to do. Five, we moved the washer dryer. Six, this didn't turn out. And actually, I put the shower that was here over here, and it turns out that was not for 88 requirements. So that didn't happen. The most important thing that we did do. There were a couple of other changes, but the most important thing we did do is Jesse wanted direct access through this hall into the bay area. and so what we did was to move the washer dryer over into the baby and that opened it up for direct access pretty basic stuff are there two washer dryers it appears yeah this is for just if you're gonna have to you know yeah [21:58] Speaker F (unidentified): it's two washing dryers one washer dryer for regular household clothes bedding whatever and the other one's for fire gear which you cannot wash in a regular washing machine so that's what that's for okay [22:16] Speaker J (unidentified): all of these i just say unchanged because i wanted to make sure that it was very clear in this area here we moved the orientation of the tables proceedings and that has absolutely no impact on the floor plan but it would have an impact on the weapon and then 15 oh yeah 15 right here we added it so you can see that it's [22:56] Speaker A (unidentified): really you know it's just tweaking nothing now another [23:04] Speaker J (unidentified): question that's your astonishment oh i should say do you have any questions i did bring a floor plan thing about moving over to public works the reason that i wanted to orient this in relation to the site plan as it currently is that if you take a look here this building had originally been oriented the other way and we couldn't do it we didn't have room on the site and it didn't leave any room for future expansion which is why we oriented it this way and by the way it gives us a perfect shot for about passive storage but if you take a look here you see that the vestibule which is their main entry is now on the back side which doesn't work we've got all the parking so that was that's the big deal to work with the easiest thing to do you will see that i had this printed upside down or i should say in reverse because i could then just take the exact plant unchanged flip it over and we've got the proper orientation to the building so the plan hasn't changed and that would change where this bump out is no all this affects this floor plan that's correct that's all i was interested in this plan you can completely disregard that i see all right now having done that I then worked with JJ who had you know similar small scale improvements or changes these offices he wanted to change them a little bit he wanted I think this office over here and utility in the middle i changed it to office oh utility is here instead of down here three is office and oh no three is bunk and four is office the reason that he wanted to make that change is because he wanted this office to have the closest proximity possible to the mayor so it was just a matter of a matter of you know shuffling around the office space If you look here at the kitchen, which is hard to read because of the size of the bathroom. All we did, here he's got a galley kitchen, which is fine for when you've got a narrow space, but there is enough room for us to do an L-shape, which is more efficient. It's easier to work with. it gives you more room out here you know here again a minor change we've [Speaker C (unidentified): got oh yeah] here jj wanted a washer dryer as well which was not included in the original plan and he said he didn't need all these water spaces and so we changed we put a dryer in the washer pressure dryer that was it now oh 10 and 11 they didn't jesse thought it would or jj thought it would be better to have the compressor out in the bay area and then boils and liquid good store i went to port city and asked them how much they would charge to incorporate and i said okay don't do anything wait until i have authorization by the time i got home from that conversation they'd already done it We later got authorization to pay them and so this is the new revised form which you can have this copy. It's, as I say, these are mine. [28:24] Speaker H (unidentified): This has everything on it from both public homes and private homes. [28:28] Speaker J (unidentified): That's correct. And the reason that it was important, I thought, to have this drawn up in CAD, I had originally thought, you know, we can include these drawings in the RFP, but there's nothing that beats a codified floor plan. You know, it's going to cost less when we can present the floor plan and say, this is just my show. i did bring copies of the of these modifications so you know walking you through it if you want to take those as well but that is really okay i can do that [29:15] Speaker C (unidentified): i [29:20] Speaker H (unidentified): guess my only other question would go back to as far as room for expansion so relative to the site map this building if are we talking about expansion involving And if so, how does that [29:42] Speaker C (unidentified): affect the design? [29:46] Speaker J (unidentified): Our directive was to be able to add, in the future, the equivalent of a bay. And you can see that we're talking about bays like this. because this is close to a bay width not exactly is it now it's a little bit wider but you'll notice that the bay widths are different i mean you i could well i can't i don't have a scale but for example this bay is clearly narrower than this bay the reason being that public works has wider equipment and so you know they just they've just adjusted the days to accommodate the equipment but to get back to your question this area here is reserved for installation of the future day so that would be just beyond on it would be a resolution that's correct nobody can see out for the year but the consensus among [31:00] Speaker H (unidentified): it just makes sense to have that possibility we had that option yes and so that's you know [31:08] Speaker J (unidentified): but that's what we did to preserve that option if it ever [31:20] Speaker E (unidentified): any discussions with port city you talked about expansion but it never was exclusively paid it's based in that space to be in this garbage bay or a combination of you don't want to it's kind of the central intuitive is out you don't want to say that they certainly need [31:44] Speaker J (unidentified): limit it to anything right it could be for anything that works you know that works within what [31:56] Speaker I (unidentified): is that footprint of additional space beyond is that enough to do an entire bay or is it half a bay is it three quarters like there's no it should be enough to do an entire day i don't have a scale it's just like you'd think it'd be called out on the site plane of the distance from pertaining off to the exterior of the building so yeah and it will be you know the final one [32:21] Speaker J (unidentified): remember today you know that port city recommended for very good reasons that we not you know completely finish this time so you gotta get an architect on board but there is enough [32:34] Speaker A (unidentified): off there's a question from voters will be so [32:41] Speaker J (unidentified): where are you going to put the camera so right now there's so right now [32:54] Speaker F (unidentified): there's parking for six spots on the fireside we have four pieces apparatus so there is room for an ambulance and the other thought is possibly a side-by-side down the road because all the trails that we have to go on and we can't take the parks side by sides out to make rescues so yes [33:49] Speaker A (unidentified): so are there any other questions from the select board [34:19] Speaker I (unidentified): so the fire chief said that there is parking for six spots on the fire side with four pieces of apparatus currently in service my question would be to jj the road commissioner of what is he planning on storing indoors with only six parking spots and i believe i counted either eight or nine pieces of equipment that public works says jason [34:48] Speaker K (unidentified): best junior road commissioner why don't you [34:52] Speaker A (unidentified): sit here it might be oh so [35:02] Speaker K (unidentified): i believe the original plan was to store three wheelers one of our star single axle which i have a feeling will be updated soon because that's coming up for replacement or retirement i should say so basically it was going to be those pieces of equipment plus maybe the pickup or the 450 that we have that goes out on every snowstorm as far as equipment goes it's for me actually trying to figure out what i'm going to put in the building myself is going to be the loader definitely because we're going to use it every storm unless we decide we're going to keep it parked over here where the sand shed is other than that the rest of our like the grader and our new excavator will probably live outside still because i don't know if there's going to be enough room to fit that in the whole equation i haven't really sat down and looked at the all the possibilities and [36:15] Speaker A (unidentified): when i look at this plan jason can you tell me where do you have wash bays in this plan so as far as i know [36:29] Speaker K (unidentified): i believe the previous road commissioner talked about using one bay for a wash bay but then there was talk about over by the salt shed trying to construct something later on so for a future plan i don't believe there's a wash an actual dedicated if i may i believe [36:52] Speaker I (unidentified): the building's been designed so that all bays could be utilized as wash bays because there should be a centralized drain system that goes out to a wash water tank that can be pumped out at a later date but again i could be wrong somebody from the committee can correct me on that [37:09] Speaker A (unidentified): kyler what do you do you know if these bays are like wash bay compatible they can be they can be they can [37:22] Speaker J (unidentified): that's just a matter of runoff collection there has to be runoff collection anyway and i that's a detail that i have not specifically spoken with bh2m about but there's a capacity i'm sure if not we can make sure there is [37:46] Speaker A (unidentified): because when the plan was conceptualized one of the selling points was and help me if i'm fabricating this that we need a place to wash our equipment so it really from my perspective important that the talents people see that we have the capacity to watch our equipment it absolutely i agree i just try to drop the eyes here thank you jesse [38:21] Speaker F (unidentified): so meeting with b2hm we did discuss this with them okay and we actually went over and viewed how they did it over in new gloucester and there's going to be drains in the floors and hoses so that all the vehicles can be washed inside every single bay that they're sitting in and there'll be a single collection point that we'll have to have like clean harbors deal with but every bay should be a wash bay so [38:54] Speaker E (unidentified): is [38:59] Speaker A (unidentified): there anything else jj on this plan that you'd like to comment on or compatible with your aspiration for what public works part right so [39:16] Speaker K (unidentified): i'm following three other well two other road commissioners on this project one which i don't know if they had any input if they did it might have been shot down as i remember hearing once and the other one even from what i understood everything was set up for in the middle and then when I saw this plan I'm like okay well this is what I have this is what I have to work with so what can I do to make this work so I've just kind of just kind of went with it really I mean because it's more than what we have right now and kind of have to [40:05] Speaker A (unidentified): you know well actually you don't have to do anything i'm asking you if this is if you've looked at it and you know this is the future of the department so right things there that changed or that you're just gonna be satisfied with something better than [40:31] Speaker K (unidentified): so i do wish there was more room outside of the facility on the same lot Due to the orientation, there's no place for the possibility of a pole barn to construct, so we can at least put the grader and the excavator at least under cover. Even if it's cold storage, it does not have to have heat. It's just to keep it out of the weather. And looking at what I've seen for plans, I don't see any room for that at because the building appeared to have shifted from like i don't know if it was two years ago three years ago i don't know when the actual plans i was looking at was there but it seemed to have moved back towards the back side of the property so that area that matthew our previous storage for signs and tires and so on so forth so after seeing this plan i kind of went out of mind so i've been actually looking at the back of this property trying to figure out if there's a way that we could construct something out back to try to house the rest of our equipment that will that [41:54] Speaker A (unidentified): may possibly not fit in this building but in terms of the conceptualization of things being separated as opposed to things being in the middle the original design having been everything was central and now it's all separated you're finding them so there were plans where they were [42:17] Speaker K (unidentified): in the middle and then there were plans that were separated i've got them down in my office actually i found them back when we were working on the interior design and me personally i think centralized would be better but the safety point of walking in front of Apparatus is when there's a fire call I understand that I wouldn't want people walking in front of a fire truck as they were trying to exit the building so that's why I just kind of went okay this is what I've got to work with and just went with it any [42:54] Speaker I (unidentified): questions at all for Jason so another one I've got for you jj is the floor plan that kyler had said that you had worked with him on modifying he listed two offices and one bunk room is that one bunk room going to be enough for a fully staffed public works of four to five drivers or would you need a second bunk room so the reason behind not adding [43:20] Speaker K (unidentified): a second bunk room was because we don't want to give the notion that we're here sleeping around we don't want to have hiding places for our crew even though it's during a storm it'd be nice to lay down take a nap for 15 minutes it was one of those things where they didn't want to have that idea of they got places to go take a nap and they'll be in there being on the clock for x amount of hours being paid to sleep so [43:53] Speaker I (unidentified): that kind of contradicts i spoke with the matt earlier this summer and he said that they had left it as three offices and i thought that the plan was to have two of them be bunk rooms and they just got penciled in his offices and in the early stages either way it's kind of a moot point at this point what i would worry about is while you guys are plowing for extended periods the ability to have more than one driver go down to get an hour or so of rest is perfectly fine and I'd say the majority of town would agree with that statement so do you envision people for lack of a better term hot racking sharing the same bed over and over with your co-workers all night or should the bunk room be big enough to house at least four beds in it is what i'm i'm kind of getting at so [44:53] Speaker K (unidentified): there was talk about having two beds in one room which i don't know how people would sleep but i know i snore sound like a chainsaw in the middle of the night so i mean i can guarantee the next person so i you know in the next bed over probably wouldn't get much sleep as far as another bunk room i had thought about having one of the offices that was close to the apparatus bay being a mechanics room so they can have a spot where they have a computer so they can look up information on the vehicles and have books and stuff like that in there so there could be possibility to put a rack in there so somebody could sleep there it was just one of those points where we hadn't really narrowed down focused on okay what's actually going in this room it's all just possibilities as far as i'm concerned [45:55] Speaker I (unidentified): so you've been with the town for five six years now anyways six a year six years on average you guys have four to five drivers during storms correct when you're fully staffed four drivers would you as the road commissioner sit there and say you'd be able to have two drivers go down for rest periods or is that operationally not achievable it [46:27] Speaker K (unidentified): could happen that's one of those things we haven't really capitalized on i guess i could say because it was typically we're not going to be sleeping here it's okay we're going to try to get done at this time punch out go home try to get some rest get a shower whatever you need to do for a couple hours and come back at say three o'clock in the morning so we can go around hit everything before local traffic comes through and it seemed to work out very good so this is probably going to be one of those cases where if we have somebody that lives say a half an hour away or 45 minutes they're not going to go home in time to take a nap and actually come back somewhat rested because they'll be getting home getting a shower and then basically coming right back in so my feelings is if we continue to hire kind of local to town we technically shouldn't need these bedrooms because the way I'm trying to keep it the way Matt had it not that I'm saying it's the right way but have it go overnight and maybe if it's that bad then yeah we'll probably take a nap in [47:41] Speaker I (unidentified): one of our chairs or something like that okay i'm just trying to weigh any options that the townsfolk may have concerns with so yep absolutely because once again going back to [47:54] Speaker A (unidentified): the genesis of the project right the concern was that we have guys working all night long without any place to rest yeah so to minimize the importance of sleeping quarters for you know for all four employees i think belies the conversation we had in front of the town meeting [Speaker C (unidentified): okay and] the town totally knows everyone sleeps on a shelf anyways that's d.o.t so that was a joke for the ada compliant right so okay typically working [48:41] Speaker K (unidentified): 95% of the time. I believe Becky had a question. [48:47] Speaker D (unidentified): George actually kind of went the direction I was thinking. Were you thinking in terms of rotating people in and out and why you might reduce the amount of beds? Because with that option now, you could put people on a rotation, which is something we haven't done in the past, what we talked about. I guess it really just depends on every storm. It's hard to really know until the storm is happening how your response is going to be, too. So I think that there's opportunity to have sleeping quarters for all people and now is the time to have that discussion and build it in because we just don't know if that's a direction that we might want to go. We talk about safety and that has to be, you know, really a priority in discussing that, I think. [49:34] Speaker A (unidentified): Historically, we've had people, as we all know, sleeping in their trucks in the parking lot. We certainly cannot, with a straight face, feel like we're going to hire local people for the next 40 years. Right. Yeah. Okay. But thank you for, you know, thank you for your answer. Yep. All right. So eight, you all set? George? All right. Then I'm going to close this public. Oh, I'm sorry. [50:18] Speaker E (unidentified): I do. Mike Pasquarello, Lawrence Road. I've been on both committees and I don't want to minimize any of the concerns that were brought up tonight but at the time that this project started pca when they were brought on board met with both department heads they did bring two designs to the committee one with the concept of it being in the middle and then the second was both sides it was discussed in the first committee and for the matters that were already brought up it was decided in that committee that the best recommendation was to move it to the outside side that's what we proceeded with that is what's in their report it's been online since 2023 that's what we presented here in this room that's what we've shown me personally every time we had something here at the town the concept that we had up was what we showed and again me personally I NEVER RECEIVED ANY NEGATIVE COMMENTS TO PEOPLE OTHER THAN, YOU KNOW, HOW WOULD IT BE PAID FOR, BUT THE BOND ISSUE IDEA. SO I'M A LITTLE TAKEN BACK THAT ALL OF A SUDDEN ALL OF THESE THINGS COME FORWARD. HAVING PCA ON BOARD, THEIR CHARGE WAS TO GIVE US WHAT THE TOWN NEEDED BASED ON THEIR DISCUSSION plus their expertise which is why we hired them on what is currently being put in other public works facilities and provide a future of 30 to 50 years although we had wonderful people with a lot of experience we didn't have the kind of experience that they had and that's why we asked to be able to hire someone so that we could be sure that we were including everyone's concerns thank you hey [52:18] Speaker A (unidentified): is there any other comment then I'll close the workshop all right now on to our regular select forwarding meeting here all right I call our regular select forward meeting to order as our custom if you're able would you please rise for the Pledge of Allegiance. [53:01] Speaker J (unidentified): Pledge of Allegiance to the flag, the United States of America, [53:05] Speaker A (unidentified): one nation under God, [53:10] Speaker J (unidentified): unity, hope, and justice for all. [53:18] Speaker A (unidentified): Next item is Accounts Payable Warrant, number 12 in the amount of $649,575 and 62 cents. [53:30] Speaker H (unidentified): I MOVE THAT WE APPROVE FISCAL YEAR 27 AP WARRANT NUMBER 12 IN THE AMOUNT OF $649,575.62. [53:41] Speaker A (unidentified): SECONDED. AND MOVED AND SECONDED TO APPROVE THE AP WARRANT NUMBER 12 IN THE AMOUNT OF $649,575.62. IS THERE ANY FURTHER DISCUSSION? [53:54] Speaker H (unidentified): WHY IS THIS SO MUCH MONEY? [53:56] Speaker D (unidentified): THAT IS WHY I HAVE MY HAND RAISED. this includes the purchase approved at town meeting for the excavator right excavator and the mowing head so that was approved in June 2025 we have worked on negotiations and this is cutting that check for that approval along with the RSU five monthly assessment so [54:17] Speaker G (unidentified): that's why it's elevated glad [54:21] Speaker A (unidentified): you asked is the excavator on excavator on site [54:29] Speaker D (unidentified): not yet once we deliver the check we will get delivery of the vehicle we also got a good trade on the one that's going back [54:37] Speaker H (unidentified): any further discussion i might add it would be great if we could park that brand new excavator under a roof any [54:50] Speaker A (unidentified): further discussion taking that all in favor motion carried next item on the agenda is payroll journal number 169 the amount of thirteen thousand two hundred fifty six dollars [55:03] Speaker H (unidentified): and thirty seven cents i move that we approve payroll journal number one hundred sixty nine dollars in the amount of i'm sorry 169 in the amount of thirteen thousand two hundred fifty [55:15] Speaker G (unidentified): six dollars and thirty seven cents second it who in second to approve payroll journal number 169 [55:21] Speaker A (unidentified): THE AMOUNT OF $13,256.37. IS THERE ANY FURTHER DISCUSSION? NEXT ITEM ON THE AGENDA IS MINUTES OF THE PREVIOUS [55:34] Speaker D (unidentified): WE ARE STILL WORKING ON MINUTES. [55:38] Speaker A (unidentified): NEXT ITEM ON THE AGENDA IS PUBLIC COMMENT ON NON-AGENDA ITEMS. IS THERE ANY RESIDENT OF THE TOWN OF PANO THAT WOULD LIKE TO STEP FORWARD AND BE heard by the select board at this time suits [55:57] Speaker B (unidentified): and peepers poland range road i have two questions the first one is what is the plan i thought we were going to request a vote for tonight on the rfp so what is the plan for that can
New Business
[56:12] Speaker D (unidentified): you state that again you said i just missed a couple words sorry it's going to be an agenda item it should be on the agenda so we can add that under new business to discuss forward motion that was my omission so sorry okay no it's fine my second [56:28] Speaker B (unidentified): point that I or I think it's going to be a request I'm wondering if in the future we could have the town meetings recorded I think it's unreasonable for anyone to be able to take notes to capture everything that is said she does a great job but I feel that there's a need for the comments that are made at town meetings to be recorded thank [57:00] Speaker A (unidentified): you that's out of our hands we are not have in our possession a room that the town owns that we can set up a recording equipment. We have requested that to be present through the RSU. The RSU has been less than forthcoming with any kind of audio-visual equipment. We're sometimes fortunate to have microphones. Until the town builds a new amphitheater that has its own possession, we're constrained by the equipment that's available. [57:53] Speaker D (unidentified): yeah i'm not aware if they have any equipment i have tried to test bringing my work laptop there and at least trying through video to record so that i could transcribe and it didn't work in june so i did try that of course we didn't have the microphone so i have even looked at potentially purchasing a microphone and speaker system that we would own to bring there because i did get feedback from a resident that was hearing impaired that couldn't hear and we don't want that to happen obviously but as far as recording i just i have thought long and hard about it myself because it would be great to transcribe from the recording but i just don't know how to do it over there without any equipment that they have available because this is not portable to bring over there okay [58:43] Speaker A (unidentified): is there any other residents none next item is department head reports department reports can be viewed on the respective website click on the department and department head will have their report there is there any question from the select board for any of the department heads all three that are present at this time seeing none is there anything to report from the select board at this time seeing none next item on the agenda is new business the panel scenic and historic society event we have in front of us a little packet [59:26] Speaker D (unidentified): I CAN GIVE YOU AN UPDATE OF WHERE WE ARE AT WITH THE RECENT MEETINGS. THE TWO SECOND SUMMARY. SO YOU HAD INSTRUCTED CRAIG DETRICH TO REACH OUT AND GET IN WRITING FROM CRAIG BOSMUS, THE ENDORSEMENT. THE EMAIL THAT CAME BACK SAID THAT THEY DIDN'T ENDORSE IT AFTER DARK BUT THEY WOULD ENDORSE IT AT 4 P.M. we met with the recreation committee thursday morning and it was agreed that the recreation committee would sponsor the event with a time change at four cemetery commission endorsed that and so they have updated the flyers today and all of that's been taken care of so that's [1:00:04] Speaker C (unidentified): where we are with so [1:00:08] Speaker A (unidentified): everybody's happy yes so this cover letter from the trainer Raymond [1:00:21] Speaker D (unidentified): just is just correspondence now yeah originally that was part of everything that was going on so I attached it into the agenda in case we needed further discussion but all compromises were made Thursday and everything's been taken care of all [1:00:37] Speaker A (unidentified): right for me any questions from the BOARD. NEXT ITEM ON THE AGENDA IS FISCAL YEAR 26 AUDIT AND ADJUSTMENTS. YOU HAVE BEFORE YOU A RATHER SIZEABLE PACKET. BECKY, WOULD YOU LIKE TO [1:00:53] Speaker G (unidentified): PASS THROUGH SOME OF THE I'LL HIT A COUPLE [1:00:57] Speaker D (unidentified): HIGHLIGHTS ON THE AUDIT THAT I ALWAYS LOOK FOR, AND THESE ARE NOT NUMBERED, SO I AM JUST GOING TO READ THE SECTION. SO ONE OF THE THINGS I ALWAYS LIKE TO LOOK AT IS WHERE WE ended up with revenue collection and where we ended up with final expended budget because that's the money that would go back into unassigned fund and so the two lines are actual revenues and other financing sources were more than the budgetary estimated by approximately 190 000 so that would be an amount of money going into unassigned funds on june 30th 2026 and then below that actual expenditures were below final budgeted estimates by approximately $536,000 so that would be an amount of money going into the unassigned fund that does not account for the carry forward requests already approved so those would be coming out of that a second piece I always look at is our long-term debt so we had a decrease in our long-term debt which is the bonds that we have out right now of 236 974 so we always want to see that number with a decrease in front of it and then i look at where our unassigned fund balance is as of june 30th and that balance is two million four hundred eighty nine thousand and eighty nine dollars so those are the key points that i always focus right in on as far as looking at the audit it there's a lot of a lot more information in there just as far as expenditures the carry forward request and things like that and then we have all the audit adjustments that we go through and I'm happy to explain and walk through those and there's a letter of just representation that we'll need to sign tonight too to get the final draft any questions a [1:02:57] Speaker A (unidentified): little bedtime reading good to know that we're not heading to jail for fiscal mismanagement nope the letter affected [1:03:10] Speaker D (unidentified): I had attached it to your packet it was on the top it's about three or four pages unfortunately we can look we can look through it if you want a motion just to accept the letter I can print a new one and we can sign it later me and you have to sign that one so [1:03:28] Speaker A (unidentified): So I move that we sign the representation letter to the Maine Municipal Audit Services PA PO Box 313 of the Maine. I second. Move and seconded that we will sign that I will sign you approve the chairperson person signing this letter with the account administrator. [1:04:07] Speaker D (unidentified): And then I need to motion on the adjustments. And so the adjustments are typically just adjusting things like interest, collection of real estate taxes for a fiscal year out even a year has to be adjusted out. There's an adjustment with the tax increment financing because just a second, Pascal. with the tax increment financing there's a little hitch and trio right now and with web we're hoping that writes itself so that's included in here to just capture that correctly internally to make the credits and the debits balance and then there was adjustments on the interest to the escrow accounts that we have for some of the projects going on it's it's just all those things that come in on june 30th that i can't do because we turn over to july 1. okay all [1:05:11] Speaker A (unidentified): right so you had a bunch of bullets that we can move and second [1:05:19] Speaker G (unidentified): yes so you want to hand them to me that's part of the packet i can give you mine if you'd like that's it all right so point me in the right direction okay so and i apologize for how small [1:05:43] Speaker D (unidentified): it is i tried this afternoon to blow this up and it and she makes them not editable rightly so it is a little tiny so the line number the account well there you want me the account numbers [1:05:58] Speaker A (unidentified): well i just want to have enough information to make a motion sure so that we can move forward [1:06:03] Speaker D (unidentified): here okay they're done in sections so the first one is adjusting accounts payable that we PAID IN THIS YEAR THAT WAS MEANT FOR LAST YEAR, AND THAT CREDIT IS 60,482.12. THAT'S THE FIRST SECTION. [1:06:20] Speaker A (unidentified): NEW SPEAKER, YOU GIVE ME THAT FIGURE AGAIN. [1:06:22] Speaker D (unidentified): NEW SPEAKER, 60,482.12. NEW [1:06:28] Speaker A (unidentified): SPEAKER, I MOVE THAT WE ADJUST ACCOUNTS PAYABLE BY $60,482. NEW SPEAKER, [1:06:37] Speaker H (unidentified): 12 CENTS. I SECOND. [1:06:43] Speaker A (unidentified): Move and seconded to just accounts payable by $60,482.12. Is there any further discussion? All in favor? All right, Becky, what's the next one? [1:06:56] Speaker D (unidentified): Okay, the next one I don't have, she didn't total this next section. So this is debiting and crediting interest into the escrow accounts from our general checking account and i'm looking through them all yeah so this is all just posting proper interest that has been earned on the apple blossom and the meadowbrook inspections and the interest on the cemetery checking and savings but there is there isn't a total that i can give you because she did not total that section out so [1:07:41] Speaker A (unidentified): it would be inappropriate to [1:07:44] Speaker G (unidentified): move an item without the figure unless we motioned i mean individually okay why don't [1:07:54] Speaker A (unidentified): we do that okay so i move that we adjust the cemetery checking so we can start [1:08:01] Speaker G (unidentified): at the top the capital reserve investment i move that we adjust the capital reserve [1:08:06] Speaker D (unidentified): reserve investment seven thousand seven hundred forty nine dollars and fifty one [1:08:10] Speaker A (unidentified): cents by seven thousand seven hundred and forty nine dollars and fifty one cents can I get a second moving second in all in favor all right I move that we adjust the cemetery investment trust by two thousand eight hundred and thirty seven dollars and twelve cents moving second any discussion all in favor I Move that we adjust the cash Apple blossom account by six hundred and ninety nine dollars and fifty eight cents Move in second in any discussion all in favor. I Move that we adjust the cash Apple blossom inspection account by fifty seven dollars and forty one cents Moving second in is there any further discussion hearing none all in favor. I Move that we adjust I move that we adjust the cash in the TIFT account by $30,791.25. I second. Moved and seconded. Is there any further discussion? Seeing none, all in favor. I move that we adjust the undesignated fund balance by $510,436.28. I second. Moved and seconded. Any further discussion? Seeing none, all in favor. favor? I move that we adjust, we credit the capital investments invested by $482,778.03. [Speaker H (unidentified): I second.] Move and second it. Any discussion? All in favor? I move that we adjust the cemetery checking account as a credit to $5,940.92. Second. Move and second. Any further discussion? All in favor? I move that we adjust the cemetery savings perpetual care account by $827.65. [1:10:13] Speaker H (unidentified): I second. Move and second it. [1:10:15] Speaker A (unidentified): Any further discussion? All in favor? I move that we adjust the Meadowbrook inspection account by one thousand nine hundred and twenty three dollars and nine cents move in second any further discussion seeing none all in favor I move that we adjust the cash Meadowbrook work guarantee account by twenty six thousand six hundred and fifty eight dollars and sixty cents move in second any further discussion seeing none all in favor I move that we adjust a general checking account by $34,482.86. I second. Moving second. Any further discussion? All in favor? [1:10:56] Speaker D (unidentified): Motion carries. So the next section are what is typically called pass-through funds. These are fees that we've collected for the state but are owed to the state and we would have collected these in June but paid them out in July. So we're adjusting our general fund account to the actual numbers. And that's what all these are with motor vehicle fees, title fees, inland fisheries and wildlife, sales tax collection for both motor vehicle and inland fisheries and wildlife, the dog registration fees, the state plumbing fee. And then we have one small typeset when we HAVE TO MAKE CORRECTIONS TO A CASH OR CHECKING RECEIPT TO FIX IF WE COLLECTED SOMETHING THAT WAS 20 CENTS AND SHOULD HAVE BEEN 10 CENTS, AND THAT'S AN ADJUSTMENT TO THAT. [1:12:01] Speaker A (unidentified): NEW SPEAKER, I MOVE THAT WE ADJUST THE BAMV FEES BY $5,010.75. NEW SPEAKER, I SECOND. NEW SPEAKER, MOVING TO SECOND, ANY FURTHER DISCUSSION? SEEING NONE, ALL IN FAVOR. I move that we adjust the BMV sales tax by $7,571.09. I second. Move and seconded. Any further discussion? All in favor? I move we adjust the vital records account by $536.40. I second. Move and second. Any further discussion? All in favor? I move that we adjust the tax refunds by $34. I second. Move and second. Seconded. Is there any further discussion? All in favor? I move that we adjust the... [Speaker D (unidentified): Cemetery lot sales.] What does FB stand for? [1:12:53] Speaker D (unidentified): FB, fund balance, cemetery lot sales. [1:12:56] Speaker A (unidentified): Cemetery lot sales by $1,140. Second. Move and seconded. Any further discussion? All in favor? I move we adjust the IFW fees by $2,305. three hundred and five dollars i second i've been moving seconded to adjust the moving second any further discussion on favor i move that we adjust the my bmv title fees by 165 dollars second moving second any further discussion on favor i move I move we adjust the dog state fees by $59.00. I second. I move and second it. Any further discussion? All in favor? I move that we adjust the cash drawer overs and shorts by $227.44. I second. Move and second it. All in favor? I move that we adjust the undesignated fund balance by $17,074.68. 68 cents second moving seconded all in favor and I move that we adjust the state plumbing fee by 205 [1:14:14] Speaker G (unidentified): dollars second moving second any further discussion all in favor the next section is adjustments to [1:14:23] Speaker D (unidentified): previous years of personal property tax collection and prior tax collections it also is got that deferred property tax i talked about where we collected the next year's tax in that fiscal year but it shouldn't have counted against any revenues for that year and their adjustments [1:14:43] Speaker G (unidentified): for the actual collection with interest okay i move that we adjust 2016 personal property tax by [1:14:52] Speaker A (unidentified): five thousand three hundred twenty four dollars and twenty five cents second move in second any FURTHER DISCUSSION? ALL IN FAVOR. I MOVE THAT WE ADJUST 2026 TAXES BY $2,861.10. NEW SPEAKER, I SECOND. NEW SPEAKER, MOVED AND SECOND. ANY FURTHER DISCUSSION? ALL IN FAVOR. I MOVE THAT WE ADJUST THE UNDESIGNATED FUND BALANCE BY $5,014.01. NEW SPEAKER, I SECOND. NEW SPEAKER, MOVED AND SECOND. ANY FURTHER DISCUSSION? ALL IN FAVOR. I move that we adjust the 2024 taxes by $766.63. I second. Moved and seconded. Any further discussion? All in favor? I move that we adjust the 2027 taxes by $1,815.48. I second. Moved and seconded. Any further discussion? All in favor? I move that we adjust the 26 personal property tax by $5,324.25. second move in second to do it all in favor and i move that we adjust the deferred property taxes by five thousand nine hundred two excuse me five thousand two hundred ninety three dollars it's been moved and seconded any further discussion all in favor [1:16:07] Speaker D (unidentified): motion carry okay next section is employee deduction payments that were collected in june but expended in july through the ap warrant process so it's just adjusting the [1:16:19] Speaker G (unidentified): general fund accounts to the actuals i move that we adjust the dental insurance account by 740.63 [1:16:27] Speaker A (unidentified): move in second any further discussion all in favor i move we adjust the vision insurance account by 454.73 move in seconded any further discussion all in favor i move that we adjust the undesignated fund balance by two hundred and sixty nine dollars and sixty nine cents move in seconded any further discussion on favor I move that we adjust the ICMA contributions by three hundred and by three hundred and ninety eight dollars and eight cents move in seconded any further discussion all in favor I move to adjust the health insurance account by four hundred and twelve dollars and ninety seven cents second moving second any further discussion all in favor i move that we adjust the income protection account by thirty six dollars and eighty four cents second move in second all in favor i move that we adjust the supplemental life insurance account by seventy seven dollars and seventy eight cents second move in second and further [1:17:34] Speaker G (unidentified): discussion all in favor all right okay last section the first line the public works impact [1:17:40] Speaker D (unidentified): pack fee adjustment is money that was approved last year through town meeting but then was expended in this fiscal year but in those warrants that were supposed to be for last so it's adjusting that count to the actual expenditures approved the rest of them you'll they'll sound familiar with capital to reserve the cemetery investment it's because within the budgetary system we have two sets of accounts for each of things like the cemetery investment and these SRO accounts so it's adjusting again as you did in that first section those balances thank you for that [1:18:16] Speaker A (unidentified): explanation I move that we adjust the public works impact fee by ten thousand four hundred eighty dollars and fifty two fifty cents move in second any further discussion all in favor I move that we adjust the fund balance for a capital reserve account to 491 128.82 moved in second any further discussion all in favor i move we adjust the fund balance for the cemetery interest by four thousand one hundred sixty seven dollars and ninety five cents moved in second any further discussion all in favor i move we adjust the escrow for the meadowbrook subdivision by $25,436.20. Moved and seconded. Any further discussion? All in favor? I move we adjust the escrow for the medical inspections by $1,849.62. Moved and seconded. Any further discussion? All in favor? I move that we adjust the fund balance by $35,000. dollars moved and seconded any further discussion all in favor i move we adjust the fund balance for the pcwa sinking fund by 1029 dollars and 48 cents moving second any further discussion all in favor i move we adjust the fund balance for the cemetery unexpended by one thousand four hundred and ten dollars moving second any further discussion all in favor i move that we adjust the escrow apple blossom inspection by one thousand eight hundred and ninety six dollars and sixty three cents move in second any further discussion all in favor i move that we adjust the undesignated fund balance by 493 dollars 728 493 thousand seven hundred twenty eight dollars and ninety 98 cents. Second. Move and second. [1:20:17] Speaker D (unidentified): Any further discussion? All in favor? And then the final bottom where she says currently the funds are out of balance. To correct this, the following two entries can be posted. TRIO will warn you that it's still out of balance, but to override it. And that's with the little glitch we're having with SQL, even though in theory when I'm moving the TIF money, I'm debiting and crediting it, 's popping up an error code. So that's to correct it. And we're hopeful that when we move to TRIO web in two months, that will right itself. [1:20:46] Speaker G (unidentified): is there a motion needed to attach to that statement you should probably just motion for me to do those two entries as well i move that we authorize the town administrator to [1:20:57] Speaker A (unidentified): to perform entry number one debit g one slash five oh one slash oh thirty thousand seven hundred and eighty two dollars fifty two cents moved and seconded any further discussion all in favor and i move that we allow the town administrator to adjust entry number two credit g three dash one five three oh dash zero thirty thousand seven hundred and eighty four dollars and fifty two cents second moving second any further discussion all in favor [1:21:32] Speaker C (unidentified): great thank you so [1:21:42] Speaker A (unidentified): the second page has no need for the future facilities mallet hall dormer repair [1:21:51] Speaker D (unidentified): THAT YOU'VE ALREADY APPROVED. I JUST INCLUDED THEM SO YOU HAVE THEM AS PART OF THE WHOLE PACKET BUT THEY WERE IMPROVED IN JULY. [1:21:58] Speaker G (unidentified): I WILL STOP IN AND SIGN. I'LL HAVE A FRESH COPY. [1:22:03] Speaker A (unidentified): I WROTE ON THIS LETTER. THAT'S OKAY. I CAN PRINT ONE TOMORROW. THERE WILL BE A POP QUIZ ON THE AUDIT NEXT MEETING. NEXT ITEM ON THE AGENDA IS ELECTION CLERK Oh, Pat Hodgson. I move that we approve. Oops, can't do that. In and for the municipality of Pownall, County of Cumberland, State of Maine, the select board of town of Pownall, determining that a vacancy exists within the town of Pownall, hereby appoint in accordance with the laws of the State of Maine as follows. Position to be filled, election clerk. Person to be appointed, I MOVE THAT WE APPROVE PATRICIA HODGTON TO THE POSITION OF ELECTION CLERK. DATE START, OCTOBER 26, 2026. DATE EXPIRES, APRIL 30, 2028. NEW SPEAKER, I MOVE AND SECOND. IS THERE ANY FURTHER DISCUSSION ON THIS APPOINTMENT? seeing none all in favor thank you patricia hodgson next item on the agenda is an abatement account two nicholas carter elizabeth catario 215 tuttle road pound domain 0469 dear mr and mrs carter has been brought to my attention that there was an error in the amount of acreage for which you are assessed this year i split the property according to your deed however i neglected to update your property record card resulting in an overvaluation in your land assessment i have done the necessary paperwork for the abatement in value of twenty five thousand seven hundred dollars or four hundred and eleven dollars and twenty cents in taxes which will go to the select board of assessors for their approval the adjustment will be made to your future quarterly tax payments i apologize for this error and any inconveniences might have caused i am in the office the second and fourth tuesday of the month if you have any questions signed donna moore hayes cma assesses agent so we the assigned undersigned assessors of the municipality of town panel hereby certify to rebecca j chase taylor chase tax collector that an abatement of property taxes have been granted as follows i move that we approve the abatement to nicholas and elizabeth carter account number 224 amount twenty five thousand seven hundred dollars in value two four hundred and eleven dollars twenty cents taxes reason error in acreage second moving second any further discussion staying that all in favor motion carries next [1:25:10] Speaker G (unidentified): NEXT ITEM, NEW BUSINESS, WOULD BE THE RFP. [1:25:19] Speaker A (unidentified): SO WE ARE GOING TO MOVE TO PASS THIS RFP ON TO THE TOWN ATTORNEY FOR APPROVAL. DO I HAVE A MOTION? [1:25:31] Speaker H (unidentified): NEW SPEAKER MOVED THAT WE PASS THIS RFP ON TO THE TOWN ATTORNEY WITH THE AFFORMED EDIT. [1:25:37] Speaker D (unidentified): THAT WOULD BE MY SUGGESTION AND I ASSUME YOU'LL BE GOING OVER THOSE AT THE NEXT COMMITTEE MEETING with the committee right the edits oh [1:25:48] Speaker B (unidentified): great [1:25:52] Speaker C (unidentified): okay great so [1:26:00] Speaker D (unidentified): yes to the town attorney with the edit suggested tonight would be what I would motion [1:26:09] Speaker A (unidentified): seconded is there any further discussion on favor motion carries next item on the agenda any other new business old business stand and sell i [1:26:30] Speaker D (unidentified): went back through with the help of george and found the powerpoint presentation he put together which had a lot of the information from it's rub or rup i always get it wrong the alternative he explored and the cost estimates and then he had also gotten an estimate after that from Knowles in regards to working I think working on the concrete was it or the seal no it was for the concrete [1:27:00] Speaker I (unidentified): so the scope of their work would be basically have the salt shed emptied they'd repair the structural damage to the I-beams any of the other stuff like that and then they would have to chip into the current foundation about one to two inches or until they could get decent rebar. And then they basically spate spray concrete in and build it out to almost the base of where the columns are now that are underneath the vertical I beams that support the bulk of the structure. And that came in at a cost estimate of 280 to $300,000. And would take approximately four to six well six plus weeks of a crew of four to five people that they'd have to have access to it from 6 30 a.m until 5 p.m four days a week you [1:27:54] Speaker A (unidentified): just run them that figure by me again so [1:27:58] Speaker I (unidentified): just to have the foundation chipped back to what they can find good metal and spray it was 280 to three hundred thousand dollars and [1:28:15] Speaker A (unidentified): then we just have good concrete tied into the old yeah i mean [1:28:27] Speaker I (unidentified): they will address the structural damage to the i-beams but that's still only so much that doesn't do anything with the roofing or the other stuff that was called out in the inspection by well [1:28:41] Speaker A (unidentified): thanks for all your work i mean it really sort of now is incumbent upon [1:28:47] Speaker I (unidentified): upon us to decide what's in the best interest of the town so I was going to try and meet with JJ at some point I thought it was this week or last week I don't know but I'm available some days so him and I will get together because I'm trying to really lock in a good fundamental idea of what we should anticipate for what the town's going to need because everything I've done so far for research is the exact same footprint the exact same size of 60 by 80. and if we're going to look into going down a road like the rub engineered building it may behoove us to go slightly bigger if it if it works for them operationally because then they can store more sand or salt etc but at least that way we can get a more definite size to start piecing together for cost estimates We [1:29:56] Speaker A (unidentified): really can't kick it down the road. We really have to come up with a plan for next time meeting. So I guess this is the venue to start. So, not to put you on the spot, Kate, but what do you think is the best approach here? Should we be directing whenever Isabella has a chance, look at grant writing for a new building? which what do we talk a million dollars yeah i think that would be good or do we want to [1:30:28] Speaker G (unidentified): town approved 250 000 to repair up to 200 000. so want to [1:30:45] Speaker H (unidentified): put words in your mouth yeah well my thought is that it doesn't make sense to repair a building that's in such poor shape and requires that much money to repair I also very appreciative that we have Isabel as a resource to help us go after some grants for this and I could only pray that we would be awarded grants for it seems to me like it's an excellent candidate for Grant and that works in our favor so [1:31:19] Speaker A (unidentified): what's your thought [1:31:21] Speaker I (unidentified): thought george where do you see the town coming down so one of the biggest problems i saw with the initial inspection they said if we do the work that they kind of called out it could get us another five years speaking with knolls if we went with their gunite slash weld repairs they said sometimes they can call places like a hodgson back in and that number could go from five years up to 20 years. With that being said, the state that I've seen our current salt shed in, I would find that a hard sell to go from five years to 20 years with just a spray coat of gunite tied into the old foundation and a few weld jobs on items. At the end of the day, as a taxpayer, I look at it like this we'd be spending almost as much money for that with a i'm assuming 40 year old building at this point or we could spend just a whisker more and have a brand new building where we'd have a proper site plan done with any contamination mitigation planned out in the for the for the conception in the build of the building okay [1:32:35] Speaker A (unidentified): so when you talk about that then we're looking at the site here and so not being able to predict the future. If the new building happens, we'll have to figure out what to do with the old building. The road commissioners mentioned that there will be some equipment, brand new excavators that will be outside. [Speaker C (unidentified): So might] as well address the issue. So much speculation, but if that goes through, are we going to tear that building down or use that for storage or do we want to design something that can accommodate the road commission's conception of pole barn to store the larger equipment it's silly to build a building that then put a pole barn up [1:33:48] Speaker C (unidentified): so i think we need [1:33:52] Speaker A (unidentified): to move you know move by i don't know we'll find them but you know set up another committee to move this project forward design whatever the future speculation you know if we don't get the grant can't tear this down what do you think becky [1:34:26] Speaker D (unidentified): I at the last meeting you did ask me to email Isabel so I have emailed her and looking in grants but she was away at a conference last week I also have a meeting on November 10th with the land redevelopment program through the state that might be able to help us with this project so fingers crossed that maybe I'll bring some good news back in a couple of weeks. I mean, more heads together sometimes does help. I think I agree with George. I feel like you're putting sort of a Band-Aid on a broken elbow if we're looking at the knolls, and that's only taking care of one, I think, of three major things that they've identified in repairing that building. The pole barn, you know, hearing about that tonight, you know, where could we incorporate that somewhere in here? You're right, there's a lot of speculation I'm starting to sort of ramble a little bit with some information there but I think let me see what the meeting with the land redevelopment comes in maybe Isabel has reported back let's circle back at the next meeting and then maybe we have a bit more of [1:35:33] Speaker A (unidentified): direction to go okay i'm going to ask the board to with a head shake authorize becky to [Speaker C (unidentified): write] up a conceptualization of new facilities project committee what would that what would the wording look like so when you have a minute i can help just design a call out this is what we're thinking okay all right well george i appreciate all the work you've done on this planning you'll report back november i met [1:36:27] Speaker D (unidentified): with them back in august and we talked a little bit about the scope of this building and then they reached back out and wanted to have some more detail come because i didn't have any information with me at the conference so we have scheduled it for the week after election when hopefully i can have a few minutes to focus on that conversation with them and it may be that they can't but i'm kind of hopeful that they'll have some avenues or ideas to help us [1:36:54] Speaker I (unidentified): move forward feel free to kind of copy me in because when you're starting to talk close to the week of thanksgiving i'm generally pretty flexible with my work okay great okay [1:37:07] Speaker C (unidentified): under old [1:37:12] Speaker G (unidentified): this is how we set up for first week in november for election good yep schedule's been posted [1:37:21] Speaker D (unidentified): we have a list of backups in case somebody gets sick hopefully not we are hosting a training Monday afternoon with our counting team and our warden to go through a mock tally so that they're good and rehearsed and fresh and ready to go Tuesday night helping us out. We have worked on our food menu, purchased some supplies. We are setting up with Public Works on Wednesday in the voting room and we have issued well over 300 absentee ballots as of now, which is the highest amount that I have seen in my time here in Palinol for absentee ballot. So participation is huge this year. It's great. Great. [1:38:03] Speaker A (unidentified): This will be the last meeting before the election. Correct. Yes. All right. We get to pick a time. We would like, usually like to cover, have a select board member around during election you divide the day thank you for volunteering for the [1:38:29] Speaker D (unidentified): morning we are opening at 7 a.m. this polling one too early availabilities [1:38:37] Speaker I (unidentified): after 5 p.m. maybe shortly before but all right [1:38:46] Speaker A (unidentified): any other old business perfect correspondence we have this notification from central main power do you have any idea what it [1:38:56] Speaker G (unidentified): where these holes are being replaced they did not list an exact date or sorry exact spot [1:39:05] Speaker D (unidentified): on here i'm not sure if the qr code that they have put on that which we have put up on the website site brings that to it just says that they'll be working in our area so i'm assuming along the transmission lines from the substation sort of that section but i don't know they're going to [1:39:26] Speaker G (unidentified): all steel now taking down the wood and going all steel yep it's a multi-year effort to upgrade [1:39:34] Speaker D (unidentified): wooden transmission structures with stronger steel poles engineered to improve grid reliability okay so this is oh there's a map on the back if you can actually see where the dots really point to the map on your back oh i'm sorry there's a map on the original one i didn't print two-sided the one online should be should be both i hope if not i will replace it [1:40:09] Speaker A (unidentified): and there's also some correspondence from our friends at the main dot there will be a public meeting with an on-demand publicly that's great to discuss the proposed bridge of merrill's bridge number 0197 over chandler brook located 0.4 tenths of a mile east of lawrence road i did your state was located on the poland ringer questions and comments so access to this and [1:40:44] Speaker G (unidentified): other active means i'm not quite sure what that means is it like ongoing so it's an on-demand so [1:40:51] Speaker D (unidentified): rather than being in person like we have public hearings you can submit your comments and questions through multiple avenues email this qr scan we've already gotten some comment and feedback from Pownall in regards to this public hearing, but it's an opportunity for the residents to weigh in over a period of time from October 21st, which has started, to November 10th. And I think the QR code, which is posted up with the agenda, will take you right to that virtual public hearing. I believe after, I don't know if they're answering people individually or if they're gonna post answers to comments and questions or just post them all after. or i've never seen it completely play out but it's an opportunity to be involved [1:41:37] Speaker C (unidentified): so i [1:41:43] Speaker F (unidentified): actually went online and looked at that and they do answer your questions right individually i don't think it's posted to anything but i've been in direct contact with the project manager and we're actually going to have a meeting out there before the project starts to discuss the [1:41:58] Speaker A (unidentified): dry hydrant did they give you any indication on when the project was going to start sometime [1:42:04] Speaker I (unidentified): next year really pretty specific so the link i saw said they were shopping it or presenting it to contractors in 2028 because i clicked on a link that popped up on my social medias for this [1:42:19] Speaker F (unidentified): project and i was like i thought maybe when she says start in 2027 that means putting it out to [1:42:24] Speaker I (unidentified): contractors i'm not sure but yeah so that was that was going to be my question to you is if you've gone on if they said they're actually going to be working on this in 27 or if they're kicking it i [1:42:34] Speaker F (unidentified): know i have a meeting with her in 27 about no 27 and 20 this year this summer i have a meeting with her about that dry hydrant so thanks for keeping yeah is [1:42:50] Speaker J (unidentified): there any other correspondence [1:42:51] Speaker D (unidentified): on it i received a call from a resident from poland range road stating that there were some white dump trucks going down poland range road at a higher rate of speed to the point where it's sort of rattling the windows but they were not able to see the printed name on the door because i would be happy to contact a developer or contractor and give that feedback she also mentioned that there was an rsu5 bus traveling at a high rate of speed so I suggested that she emailed the director of transportation which she did and copied me on that email and she mentioned a couple other notable cars that had been running at a high rate of speed going down poland range road and I said I would mention it in correspondence so it was in a minute why [1:43:41] Speaker F (unidentified): were you going that fast i don't have a dump truck i've seen that white dump truck it's i think it's second generation construction seventh or second yeah and they are flying really and i think it's because jj is doing such a good job keeping that rope created [1:44:14] Speaker K (unidentified): so after i was notified that there were some speeders going down poland range road i went down to investigate i did notice that on the route 9 end the speed limit says 30 but as soon as you get further up the road it's posted 35. so i figured okay well maybe that's why that seems like they're going fast so i came back here and pete coughlin one of our representatives we talked with a lot and do trainings with showed us dot map viewer which actually tells us posted speed limits and it's actually posted for 30 miles per hour so i'm working on getting new signs to post all along Poland Range Road for 30 miles per hour thank you JJ real quick JJ while [1:45:04] Speaker I (unidentified): you're up and talking about speed limit signs have we addressed the one at the bottom of the hill to drop it down to 35 coming into panel center so that one we actually need to call dot to make [1:45:17] Speaker K (unidentified): sure that they're aware that sign was taken out via an accident I think last winter I guess which i would have thought that it would have been reported but it was so then we get a we're gonna have to follow up with dot on that one plus there's a sign down that i noticed for the intersection of route nine that was taken down by accident so thank you i [1:45:46] Speaker A (unidentified): get people credit if they can speed on that poland range road [1:45:51] Speaker D (unidentified): is there any room to put the speed sign thing on poland range anywhere [1:45:56] Speaker K (unidentified): there is i could put that up i don't want one side but i need to remove the sign all the posted speed limit signs to say 35 right if the speed is technically posted at 30 then what i should do is take all the 35 mile an hour signs and put the speed sign on three-fourth and so that when people are aware i could try that right now and follow waiting for someone [1:46:22] Speaker D (unidentified): you did make mention when it was just down in the dip that it did seem to help based on your data so i don't know if that would help i [1:46:34] Speaker A (unidentified): remember when i first was on the board there was a motion to buy a used main state police car and just park it because there was one they did it was it was not a novel idea they did it at Pineland they parked a used state police car in a little turnout right on the top of the Allen Road and there were so many brake lights coming up over that hill but until we have you know until we have something some method of enforcement all right is there any other correspondence okay then i'll entertain a motion for german real quick john [1:47:25] Speaker I (unidentified): so i had a resident contact me about a bunch of tires in the ditch on chadsey road this was last Sunday morning I want to say so I reached out to JJ and asked him where we could place him because the individual was actually willing enough to pull him out of the ditch so he came down I helped him unload him right next to the connex box but in total it was 23 used tires that were cut off the rim they were cut in half so I don't know if somebody just had tires they to get rid of if they're cutting them off the rims to scrap the rims neither here nor there they dumped 25 tires in the ditch the individual also made me aware that somebody at one point tried to do the treadmill in the ditch on that road as well so just [1:48:23] Speaker A (unidentified): like to let's thank that please that family please report that so i suppose since we're talking about So I had four phone calls about the Allen Road from the substation to the Sweetser Road. And apparently there is a competitive racetrack there from the hours of 2 to 3 and weekend nights. night so just thought I just if someone was listening I did pick it up with Cumberland County Sheriff dispatch got a chuckle but no I mean what are they going to do by the time those people are they must have some very wealthy daddies with their buying them tires don't know but for you callers i reported out i also had a call once again asking what the town plans to do with the bear that is currently going through bird feeders between the north panel road and the durham road and the lawrence road does the town have a wildlife management plan set up to protect homeowners bird feeders i said yeah they do bring your bird feeders inside we didn't like that but i should probably report that in case we get angry recall votes for snarky slick board responses I move that we adjourn all in favor