Brunswick Town Council Reviews Draft 2028-2033 Capital Improvement Program

2026-10-26 · 1h 38m · Source: 2026.10.26 Town Council CIP Workshop (Town of Brunswick (TV3 Cablecast))
Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[0:01] Speaker A (unidentified): Good evening, everybody, and welcome to the Monday, October 26th Town Council Capital Improvement Program Workshop, hosted by the Finance Committee, which is why I'm up here. I'm Steve Weems, District 7 Counselor and Chair of the Finance Committee. committee. With us tonight are all councillors except for. counselor Anderson, who's not present in Ramona themey, who were still determining wish he's going to be this evening on either in the room or on zoom on zoom are Corey Peralta counselor Peralta and counselor Kathy Wilson also at the. on the dais here is Assistant Town Manager Jay Astle, who will be standing in for our Town Manager Julia Henze, who's still on vacation, will be back tomorrow, and Darian Plante, our Finance Director. I guess I've got to ask if the meeting was properly noticed, and I will turn to Assistant Town Manager Astle. [1:28] Speaker B (unidentified): Yes, it was properly noticed. [1:31] Speaker A (unidentified): Would you like to say anything about further about that? Yeah, I thought you might ask that question [1:37] Speaker B (unidentified): So properly notice means that we posted it on the town website under the calendar section That's where all town meetings Committees task forces subcommittees. It's all listed there And it means that we've posted it Try to do it seven days ahead oftentimes it's much more than that and sometimes it's as close as three days ahead but we try not to let that happen I would also add that I highlighted the calendar section of the website I know some people sometimes go to the agenda center to just grab agendas for meetings that are upcoming agendas sometimes lag in being posted to the their respective events that are listed on the calendar your best course of action to figure out what's going on is to go to the calendar section of the website which is immediately on the front page you can see the upcoming events you can drill down another with another click and see everything that's happening this month next month future months it's all right there and you can access the agendas from the calendar the [2:44] Speaker C (unidentified): calendar postings as well thank you can I know to just real quick the it must be well visited. As a digital marketing professional, I'll say if you also Google Town of Brunswick calendar, it's like one of the first pop-ups. It literally comes right up to the top. So very easy to find for anybody who's looking for that. Thank you. Can I interrupt [3:06] Speaker D (unidentified): and say I'm on Zoom, but I'm not seeing anything. It just still says CIP workshop. I don't know whether anybody else on Zoom can see the meeting or not, but I can't see anybody. [3:22] Speaker A (unidentified): Thank you, Kathy. We can tell you're here, and we're working on getting you access to the full event. [3:35] Speaker D (unidentified): It's not me, because I don't know. Okay. [3:39] Speaker A (unidentified): No, it's being worked on. Thanks very much. You're welcome. Welcome. And Corey Peralta is also on Zoom, and we can tell she's present because she's got a little circle here with CP in the middle of that circle. Are there any adjustments to the agenda? Seeing none, I'll just say our agenda is basically two things this evening. One is to get an overview of the capital improvement program process and what's in this year's first draft plan. And secondly, to hear in more detail the activities and objectives of the economic development and community development department. We're not actually required to have public comment, but I'm certainly going to entertain anyone who would like to make a public comment either in the room or on Zoom. Zoom. Do we have any takers? Seeing none in the room and I don't see any on Zoom. We will move to the full agenda item, which is the first draft of the 28-2033 five-year capital improvements program. And I'm going to turn this over to Assistant Town Manager Astle to give us an overview presentation on what we have. Take it away, Jay. [5:14] Speaker B (unidentified): Thank you, Steve. So the town manager gave a brief overview at the October 15th CIP workshop meeting. I won't go through that entire slideshow again today. We will be talking about the CIP for the next several months until probably the beginning of March when Council will vote on accepting it as for inclusion with the budget process that will be voted on in May so I just wanted to sit on the first slide for a minute just to remind everybody that what the CIP is and of course what the CIP is not. So the Capital Improvement Program has a lot of projects in it. I would say during my time with the town, so almost 11 years now, the number of items in the CIP has grown considerably. considerably, and that's been in large part intentional in terms of trying to incorporate projects into it that maybe in past years we would have left on the outside and not included them. All these projects help the town set priorities in terms of what we're doing, where we're spending money, as not part of the operational budget. it. These are large-scale projects that typically are more than $100,000. Occasionally, there are operational aspects in it that are of significant cost as a way to track them and keep them on the radar so that they're available to see. It also helps us interdepartmentally coordinate various projects within those priorities it helps the town decide what are what our debt financing options are and how we want to align the funding for all of these projects so that it isn't all coming out of one place I'm trying to balance those over a over a certain time horizon and it also incorporates other plans that are outside of their operational budget into the budget process things that we don't typically see as being called out in the normal municipal budget and of course what the cip is not it is not a funding mechanism or does not authorize funding in any way for any of these projects all it does is affirm that strategically these are priority projects this is what we want to focus on for those projects that require either an approach appropriation or any type of funding decision those projects will come back as individual projects not as part of a large CIP effort but as individual projects that require either by ordinance or resolution what the funding is going to be so again can't stress that enough just because you see a project in the CIP even if it's slated for recommended for approval it does not mean that there's any financial obligation tied to that council sees that again at another time when that project is fully formed and ready to ready to seek out what that funding mechanism is that makes sense I'll take questions if there is just [9:13] Speaker E (unidentified): give one comment on that J is that universally true for other stuff that's in there like the reserves doesn't that allow funding of those things without coming back to the council for certain things yes but it's [9:27] Speaker B (unidentified): when the cip gets approved there is also an accompanying resolution that there are certain things yes that are itemized that vote would encompass those items so yeah that's a good distinction to make other [9:48] Speaker C (unidentified): questions probably just putting more of a bookmark for when we get into budget session but if there is a quick answer this can't help but notice how much next year you mentioned timing of it but next year seems to be a pig through a Python type of situation like what's causing that is was that anticipated is it something that maybe next year is less certain because of the size of the number or is it just we're getting lots of money from other places [10:17] Speaker B (unidentified): no I would say that 's fairly typical it's a five-year plan so the most immediate year is when we've got especially for those projects that are recommended for funding they're the most fully formed they are and because of that they are ready to go and we know that they're ready to go and we have a very good sense of what that cost is things that you see in the out years, two, three, four, and five of the five years that you see are either to some degree less formed at the moment. It's also that based on the timing of things, they haven't like stacked up in those years. There'll be things that come off from the projects and development kind of the yellow category that will over the next year or two years become more fully formed and or determined to be of a higher need and will migrate on to the recommended for funding but it tends to be like not like a backlog but a stacking of projects and yeah so it looks like right not year one fifteen million and then it drops down to six,, and then two, and then one and a half, and I would say that is fairly typical. [11:44] Speaker C (unidentified): That's just infrastructure, though, on those numbers. Yeah,, yeah. Like if I'm looking at the total, I guess more my question towards the future, that's a really good answer as far as it's stacking. But if I'm looking at last year's significantly smaller number, is it normal for the number that's sitting on the plate right now for total of $23.1 million for that to shrink down before the budget season? [12:04] Speaker B (unidentified): or is that well it's definitely an iterative process right so we're on draft one so in the next four months things will could move around and so if [12:18] Speaker C (unidentified): that's what you're asking I'm just curious like we landed at ten million last year was that a slightly larger number at this point in time last year or is it I mean I'm looking at the number it almost doubles for next year And I'm just, again, it strikes me as are we going to be having discussions about what we can fit in there or is it, is that normal, I guess is what I'm. [12:41] Speaker B (unidentified): Yeah, I would say that you're very much going to have discussions about is that too much to bite off in one year. And part of that will be, you know, how much of that is bonding and how much of that is money that is going to get defrayed by grants. but yeah I think it would be reasonable to expect that number would move and if it's going to move it will probably be in a downward direction as opposed to adding more things into recommended okay thank you thank [13:16] Speaker A (unidentified): you thank you Jay I'm going to invite Jay to kind of walk us through the major items that are in the capital improvement first draft here not to discuss each one in any depth but just to give a flavor of what's in the plan this year there are I may have missed it and he probably already said this but there are three sections one is projects that are recommended for funding at least in a first draft document subject to change as he said there are projects that are in development, which means they're being worked on, but not in the recommended for funding category in this draft. And then there are other projects that are not recommended and are not town projects, in other words, funded by others, mostly the Maine Department of Transportation. So in the first category, Jay, if you could give us a summary, In summary, however you want to frame it, because there are 40 items on that list, and this is not an invitation to discuss 40 items, but it is an invitation to give all of the people that might be listening or watching in tonight a flavor of what's in the draft plan. [14:37] Speaker B (unidentified): Yep, I can do that. It may be a surprise or it may not be a surprise that the bulk of CIP is infrastructure-related. Those tend to be really expensive projects by infrastructure, roads, stormwater, and facilities are kind of the three biggies. And in terms of, I would say, road infrastructure, there are large paving projects that live outside of our normal paving reserve fund. These are projects that are more complicated than a typical paving maintenance project on a road. For instance, the Jordan Avenue project, which was a road rebuilding, a replacement of a significant culvert, and the construction of a 8-foot to 10-foot multi-use path alongside. side so that the combination of those three things made it in terms of order of magnitude such that it would have decimated the paving reserve and therefore we kind of tease it out and put it into its own cip project while the wildwood neighborhood is another example of that we had originally had it as part of the pavement management or the pavement reserve fund and we grabbed that out. It's a significant project that encompasses all of the roads in the Wildwood development. I think there's like eight different roads. It includes not only the road work, but also curbing, stormwater, and sidewalk work. So big project. Again, would have completely eaten up the entirety of the pavement management reserve. Steven Drive is another one, construction of or extending an existing private road between Gurnett Road and Thomas Point Road. That's a big project, $3 million, and why you'd see it as a CIP project as opposed to living within the pavement reserve. reserve. A couple of large culverts, the Bunkanuck Road culvert has been reported to us. It's inspected by the state and it's that and the River Road culvert, which is right below it, are significant culverts that need to be replaced based on their deteriorated condition. Pleasant Hill culvert needs to get replaced same problem and the reason that these culverts are important is size of the culvert meaning the amount of water that's passing through them but also the roads under which they lie are important roads the Pleasant Hill you can imagine if there's a an issue with the culvert that washes out the road which has actually happened in this location. Not only does it present a dangerous situation, but also significantly alters the traffic pattern there. Same with River Road. That would be the same case there. There's a couple other comprehensive road projects that are also here. Noble Street, Columbia, Bowker, Thomas Point Road. Those are all significant, projects that are not just road maintenance projects or road rebuilding. It's there's stormwater involved. There's sidewalks involved. So again, the type of project that those are really points them to CIP as opposed to elsewhere. What's the final one? There's a Bank Street parking lot. Again, a sizable project that the entire lot needs to be repaved. It's falling apart. It presents challenges during the wintertime in particular. That's why it lives in the CIP as opposed to the pavement management reserve. Jumping down to facilities, so not road infrastructure projects. There's the Perimeter Trail, which is at Brunswick Landing. standing. Houston Park, which is the former main gravel services property, those tend to live here as opposed to in the Parks and Rec operational budgets where again just the size of them really sort of outsize if they lived within the operational budget of Parks and Rec, for example. There are a couple of school items here. I think this started maybe two years ago where the school started maybe there's a couple more years than that where the school we started including the school within the CIP project just to highlight them and bring them surface them here and that is it for infrastructure road infrastructure and facilities there in this portion of the recommended for funding also lives the annual reserve programs for vehicle and equipment replacement, pavement management, which I've talked about, sidewalks, yeah, I think that takes us to the end without going through every single one of these. I will point out that there are detailed project descriptions for every single project in the recommended for funding that are, it's in the back of the CIP PAC booklet. Additionally, through the next two months, inclusive of tonight, every department that has a significant number of CIP projects will provide presentations in this forum, in the CIP workshops, to describe their projects in more detail and certainly be able to answer specific questions about those projects I can't answer some of them but it's probably would be better to kind of wade through the process and let that play out for each of the departments to be able to come before you and explain those Thank [21:38] Speaker A (unidentified): You Jerry questions counselor Decker yeah and I don't know [21:43] Speaker E (unidentified): So given what you just said a moment ago, Jay, I don't know how many questions you want to answer tonight. I have some questions sticking with that, those couple pages there. I wonder if I can run through. [21:57] Speaker B (unidentified): Yeah, go ahead and answer them. And if there's anything that might be better left unsaid by me and better said by a department head, I will defer to them. [22:06] Speaker E (unidentified): I'm hoping you can answer them, not me. Big picture on the bottom line, can you just give us some sense for the CIP we approved last year, the FY26-27 CIP, we approved, and I know what's on the screen here says we didn't exactly approve it, but in essence, we did. 12.6 million in total recommended programs and reserves the bottom line that was in the last year's plan that we approved but in the gray column which shows that same year the year it's in it shows 10.1 million being spent is there a flavor for a story [22:59] Speaker B (unidentified): for what the difference is there yeah because even if we forecast now so keep in mind where, well, right now, we're eight months ahead of when this actually goes into effect. So it's a ton of pre-planning in advance of the projects. Many projects that we think are going to happen in this next fiscal year, for whatever reason, don't happen or get delayed for a year. Sometimes those are partnerships that we have with DOT. sometimes those are projects where we learn about another entity doing some type of work whether it's DOT or sewer or water is doing work on a project where we'll try to take advantage of work that's already occurring in a roadway for instance and delaying meaning it doesn't make sense to do it now if sewers just going to open up the road next year why don't we wait till then and that and that actually sometimes works in both directions yeah i was just [24:04] Speaker E (unidentified): curious two and a half million dollar difference if there's anything big we should hear about that got pushed into this year that would go to counselor ellis's point of you know this next year the one we're planning for looks especially big were there were there big [24:23] Speaker B (unidentified): items that got pushed ahead yeah let me just look down quickly nothing's coming immediately to mind. [24:29] Speaker F (unidentified): You know Wildwood was on last year's CIP and then it because it just [24:34] Speaker B (unidentified): became too expensive. It was in the reserve. Yeah it was in paving though. I'm trying to think if Sparwell was, Sparwell might have been one that got kicked a year. We had gone out to bid for it and got terrible numbers and so we decided to sit tight we've actually applied for a grant to help defray that grant from the state so we're waiting to hear back on that but that might have been one that's a million dollar project i think that's the only one that stands out but yeah i don't need an accounting [25:19] Speaker E (unidentified): of it i was just wondering and again to maybe counselor ellis's question earlier is it is it typical that what gets approved we don't end up spending it all is that I would [25:37] Speaker B (unidentified): say that is typical yes I think we try to be as encompassing as possible when and realistic as possible when we do this but I will I will say that it feels like every year there's something or some things that for one reason or another that we thought we were ready to go in the next fiscal year the upcoming fiscal year that ended up not happening for some reason not that the project wasn't going to happen but that it gets delayed either a year or two years so yes i would say that is very [26:11] Speaker E (unidentified): typical yeah okay chair can i ask a couple other quick questions absolutely okay oops my questions roads and the comment was made i think it's a great move to move wildwood to a bonding situation freeing up the other money for the annual reserve when will we see the actual [26:37] Speaker B (unidentified): road resurfacing schedule we're waiting for the results of our recent street scan project that will give us the pavement condition index of all our roads we had done it last back in 2018 so we did we re-up that pretty sure we don't have the data on it yet I don't know that for sure but as soon as we do we'll use that to match up with the list that we have been going on and it would not surprise probably anybody to if that list changed and I'm not sure how substantially it'll change but my feeling is that it likely will it'll inform our correct yeah that work yeah just be a reprioritization of not only what roads but also the order in which roads happen and just as a reminder and wound up talking about this when engineering does their presentation. But we often try to pair up roads so that we can save money on the efficiencies of mobilization. So that's a key aspect of deciding. I know sometimes it doesn't feel as obvious to others as it might to those of us that kind of talk about it every day, But that is a big part of it, is trying to align various roads together. [28:06] Speaker E (unidentified): So sticking with that theme for a sec, the sidewalk reserve, would it be possible to get a page to go with that to show what sidewalks are getting replaced? Because that question comes up sometimes, and it would just be helpful to have it in this document. [28:25] Speaker B (unidentified): Yeah, and what I might offer on that is everybody knows the prices have gone up on just about everything. And so asphalt mix is no stranger to that. And the amount that it gets funded right now, sidewalks, it is really all it can do is fix very small, discrete areas. It isn't like a wholesale 1,000 feet of sidewalk replacement. That number is, for like 1,000 feet, is probably close to $300,000. And if you see, we have it funded at $150,000 to $175,000. So when I give you a list, I want you to understand it is nowhere near what needs to happen anywhere in town. it is it's for spot repairs we try to do the worst sections of sidewalk that see the most number of pedestrians that kind of makes sense but yeah we can do that give you that list [29:37] Speaker E (unidentified): just curious is that was it out of that reserve that the library sidewalk got fixed [29:43] Speaker B (unidentified): i believe i believe so but i don't know that for certain that was a good project [29:50] Speaker E (unidentified): I'll put in a plug here, an advocacy, see if others think about it, about having another public works reserve specifically for traffic calming and seeing that used for more permanent traffic calming solutions, just like the example with Spring Street where there's temporary solution out there but it's it's it feels like it's headed towards an engineering solution and it won't be it won't be you know picked up in a little maintenance budget if we have to bump outs or stuff like that and i think everyone around this table knows of roads around town that are pressed pretty hard now with the need for traffic calming and trying to make that a just an embedded part of our of our of our budget that we have money for traffic calming so i don't know if that's i'll just throw that out now for consideration and i would leave it to staff to figure out what that should be set at but that would it's a concept i'd like [31:02] Speaker B (unidentified): to get out there yeah and you didn't say it explicitly so i will it would kill an operational budget to do traffic calming and so if you wanted to point to a reason why it doesn't happen as often as maybe some people think that it should that's in large part why it's they can be expensive we did do the traffic calming on Spring Street three sets of speed temporary speed humps on there and those things aren't cheap. It's really expensive just to do that. And we elected to do it out of the Public Works operational budget. And, you know, it was like $20,000 to do that between the speed humps and the required signage for it. And that's just a temporary seasonal fix. So I don't think that you would hear any objections to doing something like that of setting up a reserve for traffic calming. any objections from staff at all and one of the not recommended for fundings in here is curb bump outs for Spring Street it's not it's not in development even because we're still collecting data to figure out if that makes sense but I think the number on it is probably yeah three hundred and fifty thousand dollars So it's because it involves road work, curbing, drainage, and once you add those things together and then incorporate in the engineering cost to be able to figure it out, drainage in particular would be a concern. That's why that number, I know it's really easy, like go down Longfellow where we most recently did bump outs at the intersection of Coffin Street. and you look at it and you're like, oh, you know, that looks like a $50,000 project. And it's just not. It just isn't. So, yeah, the reserve would be, I think, from staff perspective, very welcome. [33:19] Speaker E (unidentified): The last question, if you can meet here. [33:21] Speaker A (unidentified): Are you transitioning from that one to a new one? [33:24] Speaker E (unidentified): Yeah, it'll be my last one. [33:26] Speaker A (unidentified): Well, before you get to your last one, I just would like to add in my own two cents on this. that i think it's just your suggestion of a council echo's suggestion of a line item in here is a good one because we all know there's a there's a an epidemic of neighborhood concern about traffic calming issues you can go all around town anywhere in town on arterials on neighborhood streets, even on dead end streets probably, there's a lot of concern about this and having a way, it may not make the cut in the end, but having a way to in the short term address the worst of those issues and having a fund to be able to do it would be widely acclaimed improvement in our town operations if we find we can afford it. So I just think it's a good idea to put something in here as at least a starter project category of that type. [34:33] Speaker F (unidentified): Counselor Hicks. Did you have one more? Did Counselor Ecker have one more question and then I can ask? [34:38] Speaker E (unidentified): It's on a separate topic. Okay. [34:41] Speaker F (unidentified): I was going to say that if we do decide to put a line item for traffic safety calming, I'd like a presentation of what does that mean? What does that look like? I think that would be helpful even if we don't fund it. having the a tangible conversation where we actually know what the tools are what could be available and maybe figure out and scale it back and figure out what can we afford or what are some things that we could put potentially do for some spots but then i had a i just wanted to mention counselor alice was asking you know this amount that's being requested in And this first draft, or not requested, but the total amount of project costs for the CIP for this year is a lot higher than what was approved last year. Last year's first draft CIP was $18 million. So it was a lot higher than we ended up voting in. And I suspect it's partially because there's projects that just weren't ready to go. and I think also we cut the heck I think the manager and I was reading the tea leaves and knew what our tolerance was as a council of what we would support and I think things got slashed Premature not from you know as a pre-emptive, you know way of bringing a budget to this council that so it wouldn't get Too decimated. So that's my two cents on that [36:11] Speaker A (unidentified): Thank you. Back to Councillor Ecker. [36:13] Speaker E (unidentified): Jay had one more thing. [36:15] Speaker B (unidentified): I just wanted to follow up on that. I think that is right, Councillor Hicks. And I would add, there's two ways we can do it. It's moving a project out of recommended for funding and putting it into project and development. We can also move it from year one to year two, year three, or year four, meaning just kick it out over time so that it isn't creating an undue hardship in that first year where you've got that, oh my gosh, it's $17 million, right? So is there a way to both kind of spread that $17 million over the next five years or take certain selected projects because maybe there's a way to delay it because the need isn't critical right this minute, meaning there's a safety concern or something like that. So there's two ways to do that. [37:02] Speaker C (unidentified): And just to throw more difficulty onto this whole thing, The complexity of where's the money coming to pay for it is also complex because I look at this sheet and I see the state of Maine is sending us nearly twice as much as we got approved for last year. So, you know, if it's being funded somewhere else and it's not impacting immediate thing, I'd be a fool to turn away money. We've got more in donations as another one, which is significantly higher than it was last year. And so it's going to vary, but I was just looking at that, trying to sort out how much of this is going to be pencil sharpening by us and how much of it is going to be like natural course of evolution of projects. And it sounds like a little bit of both, which. [37:42] Speaker E (unidentified): Yes, I am a council record. I'll yield the floor that last thing is public works facility. It was it was a project recommended for funding last year. got moved it got it got demoted to a project in development and i know there's an art to an aspect of this but two councils in a row at least that i've been on it's been a priority this is like our major facilities priority i think everyone i think everyone agrees with that knowing that we don't have the plans fully baked but it seems to me it would more accurately reflect our priorities even if a plan isn't fully developed to at least have a placeholder in there for projects recommended for funding partly because of some of the comments you made at the beginning around this is all this is a tool for predicting our financial projections and bonding estimates over the future years. And so if I look at this, and then if I have to force and choose, I question, I'll just go a little further here, I question why Houston Park has got three items recommended for funding category, except for what's in for this coming year. it's unclear to me what these others are. I've read a little bit on the notes but we haven't really voted on them as a council or anything else so I'm just trying to, I'm not trying to point out pitch one project against the other. I'm just saying in terms of a value priority for the town I think it's a discussion we need to have and I personally would rather see the public works facility get moved up into that projects recommended for funding. That's my last comment. Other comments on this? I was going to say I thought I had heard [39:50] Speaker C (unidentified): in the beginning of this that we're getting department heads will be coming in to present the details of the projects which I think is where we'll be able to weigh in on the merits of one versus the other I hope because that I think is a prioritization as a part of the job right you don't get everything you want all at once but that is happening in the next series of meetings is that how we're looking at that yeah so you'll have economic development tonight [40:18] Speaker B (unidentified): following this and then the next one i will i don't remember who's next actually might be public works engineering but yeah parks and rec is on the schedule and i won't make deputy director sabrina best come up here today to say anything because she'll have her day in the in the spotlight but yeah so that is the plan and that's how it how it materializes and right and she'll be able to speak specifically about the various aspects of houston park and at a certain excuse me at a certain point yeah you the intent is that you would be able to you'll hear all these presentations you'll be able to digest it all And then your job will be very much to compare and not necessarily pit projects against projects, but, yeah, figure out how you want to lay things out. [41:16] Speaker E (unidentified): Absolutely. By the way, my intent was not to pit tonight. It was just that was one that really stood up to me that I just wanted to point out. And I don't know if staff has any view on that right now, but or you want to save that for another time? [41:31] Speaker B (unidentified): No,, I'll speak to it. in one sentence i would say that us there was some hesitation on the part of staff about the direction of the public works facility and because it's such a large project we didn't want to mire down the projects slated recommended for funding we threw it back into projects and development because it felt more like that's where that lived well [41:59] Speaker A (unidentified): it might be a topic that we could agree to disagree on tonight and leave it for another day council [42:06] Speaker G (unidentified): mcdonald just to give a preview so currently what's on the docket is monday november 9th is public works and engineering on the november 23rd monday is parks and rec and december 14th monday is school department there's still three other placeholders in there for january and february that are also listed but those are the ones that are on the docket at least for cip presentations this year great [42:34] Speaker A (unidentified): thank you counselor wilson and perol do you have anything you want to weigh in on at this point or can we kind of orient ourselves to hearing from our economic development director i'm good thank you kathy anything you want to add we'll take that as a no [43:09] Speaker D (unidentified): you can go on I've been listening but no I don't have a comment [43:13] Speaker A (unidentified): anything you want to add [43:16] Speaker D (unidentified): no I said I'm sorry I've been listening on TV because I still don't get a picture here but no I've been listening and I'm good [43:28] Speaker A (unidentified): Yeah, thanks for weighing in. Existing town manager, Estill. [43:34] Speaker B (unidentified): I just wanted to make note of one other thing before we move to economic development. And this is maybe right on the heels of a meeting that we had here on Thursday night for Brunswick Landing. I think one of the questions that often comes up is you know is this everything that's going on in the town in terms of big projects or our projects that are coming down the pipeline and the answer is probably not as you can see it's largely driven by infrastructure roads and culverts because they're they're so expensive. And along those lines, one of the things you don't see on here is anything related to Brunswick Landing. So roads, stormwater infrastructure, sidewalks, all of those roads are private right now. This has been an ongoing conversation for a number of years. And again, fresh off from Thursday night's Brunswick Landing neighborhood meeting where, again, topic of those private roads being assumed by the town as public roads, that's a big, I don't know if it's a gap, but it's a monster number. You don't see it in this document because we don't have a really good handle on what that dollar figure would be to even assign to even some portion of that endeavor. of that endeavor so just know that yeah we're aware of it but you don't see it reflected here as a as a future cost and yeah just wanted to point that out because well i'm glad you [45:23] Speaker A (unidentified): brought that up because none of us are clairvoyant but it wouldn't be at all surprising to know that when that lands it'll be a big load of coal that's being and be in the category of a new school or a public works department or greater yeah I [45:44] Speaker B (unidentified): mean realistically the way that it will probably happen won't be in one fell swoop or we should all hope not it will be in bite-sized chunks so that we can absorb it in a responsible manner, but we don't even have, like, the, you know, how that might happen in terms of what would be first, second, third, fourth, how do you do it, but there would need to be quite a bit of strategy involved, and certainly we need to figure out what the financial implications of all of that are. [46:21] Speaker A (unidentified): Yeah, thank you. it's a huge subject and not for this for any kind of in-depth discussion this evening counselor [46:28] Speaker C (unidentified): ellis i was going to say with that 's one of the things that i could be completely off base on this one but every year we appropriate essentially a credit enhancement agreement with mira and i'm wondering if we couldn't begin using that to basically earmark certain percentages of that they need to be putting towards these types of projects that are geared towards handoff and that's the one thing that we control the ability to either approve or not approve their budgets but I would love to see that become a priority of this council so that some future council doesn't get that big arse bag of coal that I think you're right on that it is not going to be a small issue and so taking it down bite by bite before that turnover event would be something I think I would be supportive of trying to encourage some discipline on their side to begin investing in it now and not saving all of that for right before they're going to turn it over to us yeah that's a good point and not to be debated [47:27] Speaker A (unidentified): tonight but i think you'll find that most of that money has gone into those kind of same kind of projects that you're talking about in the past so there's not a lot of movement there i don't think it's available but that is a subject for another night i'd like to move to our planned agenda here. Any other comments before we do so from any of the members here? Assistant Manager Ashton, would you like to introduce the next item? Oh my goodness, I would love to. [48:00] Speaker H (unidentified): Welcome Economic Development Director Sally Costello. Thank you, thank you. Yeah, I am here tonight to talk a lot about several different projects. I'm interested in what you just all brought up because we have a lot of infrastructure projects you're going to see in my presentation. You're absolutely right that we need to take this bit by bit, and that's what we're doing, and you're going to see some of the projects tonight that I'm going to talk about are doing exactly that. These public-private partnerships, MIRA and the town need to work together on this. It's a huge upcoming cost and current cost that we really do need to plan for. Next slide, please. So the first project I want to talk about, and again, it's sort of an out-of-the-box project that I brought last year that was not funded through the general fund, but the affordable housing support fund. As you know, our housing committee has made a lot of progress in giving... [48:57] Speaker E (unidentified): Can we get the title at the bottom them moved someplace? [49:02] Speaker H (unidentified): Yeah, thanks. The amount we're requesting is $325,000. We have a balance of about $300,000 and we started, this fund was seeded with a million dollars which we have been very successful in leveraging a lot more than that for a number of projects that are both for production and preservation and direct assistance of affordable housing. The reason I have the picture of the Hawthorne You know, we recently just awarded that to Doriard, and part of their proposal was that they were going to come to the town for some money for the affordable housing support fund to help them score well on their main housing rural development application, and that was $250,000. So knowing that 's coming up, we don't want to deplete that fund, but also we're hoping we're going to have a lot more entities coming to us so that we can assist, and we just certainly don't want to get down to a razor's edge. So I know there were counselors in the past that really supported some funding coming on an annual basis, and so I am just going to make my pitch again that it would be a really great thing to have some additional funding there so that we can continue to do the good work. Next slide, please. So this slide has just got the Cook's Corner Overlay District, which is the design standards. You know, that's an official ordinance whereby any businesses that are under this overlay must comply with the design standards. There are a lot of projects going on in the Cook's Corner District that are either planned or underway. The three on the left, these are the stars, these are all transportation and connectivity goals that were in the Cook's Corner revitalization plan. There were three goal areas, and this was the number one goal area that had the highest community support. You know, there's a lot of missing infrastructure, and there's a lot of transportation and connectivity problems out there, and so we have been working very hard on those, some of which are placemaking, which I'm going to talk about in a little bit. But those are really taking underutilized and blighted sites because, of course, that is part of economic development is taking these underutilized sites and making them productive. Being productive can also be that we just preserve those as land. It could be beautification. It could be turning them into a park. It could be fixing a safety issue. So there's three projects I'm going to talk to you about and talk a little bit about more of the progress. progress. The three on the end are, you can see Jordan Avenue and Bath. That's the pedestrian hybrid beacon. We're working on that one with the main Department of Transportation and coordinating the bike ped facilities with them on Jordan Avenue. The next long site, kind of in the middle of that is a star. That is a site that we are working on that we actually have control of now that we have a long-term lease with Mira. So the three placemaking sites, The reason they have taken a little bit of time is because we didn't own any of those sites, and we didn't want to pay for any of those sites. Two of them, the next one over is the gas station. They're both over an aquifer. They cannot be developed. And we've been working very hard to get control. As I said, we're under lease for the 87 bath. The 101 bath road, we have been working for two years, and we're hoping that donation agreement is on its way. It's being drafted, but it's taking some time. but I was hoping to have it on the November 2nd, but we're going to have to push that probably another couple weeks because I still don't have it, but they say it's in draft. The three that are kind of clustered around Allagash Drive, I came to you last week about just the whole hour that I was talking was about Allagash because it's a very complicated project. That has gotten pushed up in our CIP because we got a grant agreement and a grant award from MDOT. And there's four partners in that, as I explained, Mira, the town, Priority Realty, which is called, it's under the Pinnacle Group LLC. And who did I leave out? Town, Mira, oh, MDOT. So that project is about $1.8 million. And we are paying a portion of that, but it's basically a third, a third, a third. And then I explained that we're making that a complete street. Complete street is a goal. We only have one, We're trying to get more. This is part of the Cook's Corner, but it's also part of what the town would like to see from our public input, that we create these connecting streets so we don't have these islands, and that we start to actually build an infrastructure that people can use, with cars, bikes, and walkable. So that is a real goal there. So I have two there, because it's the access road as well, so the Allagash Road would be straightened, to allow for the development of the two parcels on Admiral Fitch. Again, that's an economic development thing to Councillor Ellis and Councillor Ecker. We would get TIF revenues from that, which would start to build up our account, which then we can start having more partnerships with MIRA. We do expect that they are going to pay their share, and when we have projects that bring in this TIF revenue, then we start to work towards getting those things done. Very, important, and we need to step that up. The star across the street is the placemaking where we would be closing the jug handle for a beautification project. I brought that to the town council a while ago. Very pretty light in terms of funding that project, but it's going to close the curb cut because people are jumping that, so it will be a safety issue, but it's also going to be a beautification. So infusing these green spaces, making these connectivity parcels, again, a key component of the Cook's Corner. I know that Councilor Hicks talks about the big picture, and I'm trying to say there are nine projects up here that we've been working on, and we are advancing, and we're moving fast. We're serious about getting this stuff done. It's been in our CIP for years. It's been in the old Cook's Corner. It's in the new Cook's Corner. It's been a priority of the community. You can see the star there where Stevens Drive is. We just put in a BPI grant agreement on Thursday. That is another third, a third, a third. What's advanced that one is that we have been able to negotiate and finally work with adjacent property owners. And so we're hopeful on that one, and we hope to hear soon. So that's another one. And then the other one is the old Bath Road. And Bath Road, that is a pedestrian crossing that we're going to get done. Chrissy, you can keep forgetting about this, but I think it is next spring. So that's another kind of, that's a, Bath Road is a barrier. So we're trying to make these connections so that people on the other side of Bath Road can actually get over to the rest of, you know, the Cook's Corner and Brunswick Landing. So we're trying to move forward in a very coordinated fashion. Next slide, please. So these are the three placemaking sites that I talked about. And I talked about where we are, and we are in very good shape. MDOT, we also did get approval to move forward on that site. None of these are having any cost implications. In fact, we are getting a donation. We will have some cost implications with the improvements that we're making, and I'll talk about that in a little more detail in a minute. Next slide, please. So this is the site where we're going to have the pedestrian hybrid beacon. And this, as we have paid for in the Cook's Corner Revitalization Fund, which I come forward and ask for funding every year, we have been paying for the design and the planning for these sites. And the concept was to, again, create this path all the way through that finds its way to where the gas station is, which would be turned into a public park. We're not going to stop there, and we'll talk more about that later. That sign there is kind of a neat sign that would be kind of a viewing area. You could step, you could walk up it, and you could watch the planes come in. It's kind of denoting the Cook's Corner area. We want to keep it sort of rustic looking, but it is kind of a placemaking element. You can see on the left there'll be a lot more. This was an early concept. It didn't have all the plantings, but that's kind of the latest sketch of all of the plantings. It's going to be a meadow. It's going to be all native plants, so it will be very easy to care for. we've been working with our arborist on that to make sure that we make it as easy as possible, but also with native plants. Next slide, please. So this is where you can see the little red mark there. This is what is currently the gas station. We've been moving through a lot of concepts on this and how we're going to create this space that is a destination but there's also something to do there we talked about coming in from so we've got this sort of zones enjoy is the sort of top part which we may have we're thinking about having some kind of I don't know if you've all been in Portland where you drive down and you can see like off the side of the road you can see they have this really neat area that's recreation that has these sort of workout things along the way that could be something we have along the path and then you have more kind of area back because we're trying to make sure people are far enough from the road because again we talked about how the traffic is quite faster although i think the pedestrian hybrid beacon is going to slow that down and maybe we'll have a second one at some point and then the gather space what we're recommending is reutilizing the canopy and kind of cladding it because it's got these it would be very expensive to take it out we would demolish the convenience store and we've had a phase one on that and we've done a sort of a site phase two and we're going to be doing a phase two but there's no indication that there's any asbestos but in order to be able to demolish it we have to do an asbestos we have to do a phase two so that we can get rid of the materials in a safe way and then activate is kind of where people would kind of come through you can see there might be a future sidewalk connection there might be a future pedestrian crossing so we're trying to get these crossings over into Brunswick Landing and we're not trying to create these islands. Next slide, please. This is just kind of a rendering of what that might look like. And then you can sort of see where we are with the design. So we're kind of moving through the design development on these three sites. Next slide, please. And then, of course, you've seen this before. This is just a rendering of what the park will look like with a lot of plants that will be seasonal all year round. We want color. The punch, we originally thought we were going to have a public art piece, but we have to have so much of a setback, according to MDOT, that we decided that wasn't going to work. So what's going to be the public art is going to be the beautiful plantings, and I think that's really needed. A lot of people complain about the aesthetics of Cook's Corner, and they're not wrong. We need more green spaces, and we need more beautification out there. Next slide, please. so these are this is kind of an early estimate and i say very early because it's not been vetted i just got this last week and for the three sites the total project cost right now is 756 ish thousand i think it's going to be a lot less than that in terms of the plantings i won't let's not say a lot less but i think it is going to be less because i think we're going to be able to get some of the work done ourselves and also get better pricing on the on the plantings This came from the consultant, so I'm working with Dennis Wilson on that to see kind of if he can take our scope of work, because a lot of it are the plants. The bigger, you know, the 87 Bath Road is just a long site, but the other one is that we've got some work to do, and that also includes 100,000 of demolition for the convenience center. so and then what we'd like to do we were going to be doing that the curb cut closure and planting this year but we the schedules of we tried to get this entity this to move from one of our projects to another construction entity and they weren't able to do it so we're going to have to we'll do that one next spring as well but we're ready to go in terms of closing the curb cut and planting we just missed the planting season as well and we'd also like to move of those other two projects for it. I do have money that's been building in the Cook's Corner Revitalization Fund. This is not fund. This is outside of the general fund. It's been set aside for this project, the Cook's Corner Revitalization. So I would not need to come back for additional funding on that. And hopefully we can get this pricing down as well. Next slide, please. So I bring this back only to reiterate just like this comprehensive approach that we're taking. The two other projects that the economic development team has been working on are, you know, raising money and putting together the, I guess, the deals for Allagash and Stevens so that we are not out on our own with this. and working through donation agreements, working with the property owners on the legal aspects of this. In the case of Stevens, there's a lot of overlapping easements and a lot of different work that way and working with the property owners because we are going to need to take their property, which they are donating, to build that road. So the other thing that I was able to include into the BPI after talking to the manager's office was I feel very, strongly about handling the Thomas Point intersection in Bath. We have a few projects coming on Thomas Point Road, and then that cut-through is going to help alleviate some traffic. But we've got a terrible situation right at the Thomas Point in Bath Road. We'd like to address that through the grant, partially through the grant. And this was a priority of MDOT as well. So it would be a right-in, right-out, but there would be a little bit more to it. It added another couple hundred thousand to the grant request and the total budget, but I feel strongly that it's needed. And there's some culvert work. There's a median that has to be adjusted. It's never as easy right in, right out. There's a lot of work there, so we did put some funding towards that. And then, of course, you heard about Allagash. But I think it's just important to see that we are really working hard to move the agenda of the Cook's Corner revitalization plan. We're not sitting on this plan. And we're working, and people don't get a really good chance to see all the stuff that's happening. And these projects take a while, and they're starting to come together because we're really starting to get these partners who are willing to step up and know that it's a joint effort, and that's the way we're going to be getting things done. Next slide, please. So the next slide is about the MARC, and I've got Sabrina here as well. Went to the rec commission, and Sabrina and I talked to them about the next phase of the MARC. You can see this is the master plan. It's changed slightly from the original master plan in that we flipped the basketball courts and the tennis courts, And we did that purposefully because there is a big stormwater investment that needs to be made under that parking lot on the left-hand side there, on the west side. And so at the time, our fundraising capacity – oops, I hit the wrong button, sorry. I meant to hit the little pointer thing. Oh, there we go. Okay, so that's what I'm talking about right there. So these two flipped. We're going to have to come back and do that. We've got the perimeter trail done. the skate park, the pickleball courts, and now the basketball courts, if you haven't been out there, and the sports lighting, and the first playground. So we had a lot of discussion just within staff before we went to the rec commission about what are the next elements we think are really critical for our community, and the things that we hear and the rec commission hears that there's a need for, And what we've ended up moving forward with is the Tier 1D, what we are recommending and what we brought to the rec commission, and we brought three different concepts of this, of just these particular elements, is bringing the next playground up. We know, and I know you had a big meeting on this, and we know that sometimes the developments are happening and playgrounds are being removed and they're not necessarily replaced or we just need more because we have a map that shows the population that's in and around Brunswick Landing. It's more than 2,000 people. It's very impactful about these neighborhoods and all of the need. And we know that the toddler playground is definitely having a regional pull. And if you have questions for Sabrina about that, but we know that. People are coming from all over. So we think that's really urgent. And then the other thing we'd like to do, because we think the pool is a bigger fundraise, we know it is a bigger fundraise, but it may be a few years off, is to bring in a water element to this. So the green is actually a splash pad. I keep hitting the wrong button, sorry. It's actually a splash pad. And then this in the middle is a shade structure. That was information that Sabrina really brought to the table because we have a consultant who helps us with designing our sports facility. He's very accomplished. They do sports facilities all around the country, CHA, and Jason Pollard, who's been helping us from the very beginning. And she said that we really do need to keep adding these shade structures, that it's a really important element. And that is what we actually added to the last phase, this Tier 1C that has the basketball courts and the sports lighting, is a shade structure. And I think I mentioned to you all that we are getting really good feedback from our user groups. And our pickleball folks were really lobbying hard for this. And we said, well, can you help participate in this? And they raised $13,000. So that was really great. We have been able to. Our users and our community is really participating. So we're getting really good buy-in and really good, you know, support that way. So that, and then the next, the other element with that is the natural grass field. And, you know, Sabrina and her team really feel like this is a need. This could have any number of programs, whether it's for summer, you know, programs or just other things that they need, soccer, you know, different things. And Sabrina can definitely talk to it better than I if you have questions. But that is something that we feel is kind of an urgent need right now. So the estimated cost is about $1.4 million. Again, we want to show progress every year. We think our community deserves it. We fundraise really hard for it. And that's about what we think we can do for a 2027 build, which would be in the summer and fall. So, any questions about any of these projects or I've also got Sabrina here and Chrissy if you have any questions about the bike ped stuff or you have any questions about the mark that from a programming aspect for Sabrina, we're all here to answer. [1:09:10] Speaker F (unidentified): Also here. Thank you for that big picture that I always like to have when understanding these projects. projects. So going back to the Cook's Corner, kind of placemaking, pedestrian pathway, that network that was broken into three projects, basically. And those are, so those are, you're hoping to be funded for this coming fiscal, this next fiscal year. So those projects already have [1:09:44] Speaker H (unidentified): funding set aside for it, but every year I ask for 200. So my ask is to ask for 200. I will be using those funds, hopefully, for these projects, and so I'm just requesting my, every year I come and ask for money. [1:09:57] Speaker F (unidentified): So will this year's allotment, you know, you can call it $200,000 allotment, will that tip the scale so that those projects could get built next year? [1:10:07] Speaker H (unidentified): I've got enough right now, but I just want to replenish, because I think I've got close to a million, but these probably are going to be around $800,000, all told, so if I'm I'm going to move on to other things. I need some funding to do that. Okay. [1:10:20] Speaker F (unidentified): And then a question about the MARC projects, and that is, again, it sounds like you have some money already saved, you know, collected for some of those projects that you've been proposing. [1:10:38] Speaker H (unidentified): So we actually don't. I mean, we are continuously fundraising. We have in the past used LWCF, and then we've also used rec impact fees and we've our stakeholder partners we are going to be we're hitting the ground running we already have some stakeholder meetings set up and we're just going to be fundraising for that but we feel good about it we feel like we're we're going to get good support there and i think there are other we probably will request some tiff revenues one of the things that i would like to do and we're working on is when we are looking at some of these TIF development programs. We'd like to go back to DECD and ask that we amend those so that we can use those TIF revenues for municipal facilities. Those could be used for the MARC, which would be absolutely tremendous because then that's not general funds again. And other towns are doing it. We've never been able to do it. And so we'll be talking more about that with you all to see if you all agree that 's a good thing. but we think that would be of real benefit, and it could be used for other projects. It doesn't have to just be used for the MARC. Maybe some could be used for the public work facility. I mean, any number of things. So we're always looking for ways to not hit the taxpayer. [1:11:58] Speaker F (unidentified): And then how much more would you say, or what's the added cost of building the MARC facility on the landing, knowing that there's extra steps you have to take? because of the nature of that location being a Superfund site. Does it add a significant... [1:12:18] Speaker H (unidentified): Oh, it absolutely has. I mean, our facilities have been, I'd say, 40% to 50% more because we've had to deal with the land development. We have done a lot of it, which is good. But like this next phase, we don't anticipate there'll be much. And we've had, when we have our soil borings and everything that we do, just as we move forward with each of the phases, Like, we had our environmental consultant come out when we dug way down. You know, we had to go, like, 16 feet down for those light poles because they're awfully big and heavy. And that's what it takes to anchor them. And everything came back good. There was, you know, he inspected them. And we moved that way. But, you know, we've been working with the same team for four and a half years now. We have a very good understanding of the site. Same, you know, CHA is the same, you know, consultant we've been using on the planning and design and construction management. We have the same team with CV Mahar on the environment. We use the same people for the geotech. So we've got a really good team who's got great knowledge. So we don't move forward, you know, without knowing that. But this next phase, I don't think there's a whole lot of risk. [1:13:25] Speaker F (unidentified): And then my last request is that, and maybe other departments could do the same thing, but you do find a lot of your projects has multiple funding sources. So I think it would be interesting and helpful maybe as a messaging tool to understand how your projects leverage money we wouldn't have otherwise. So what we put in towards a project leverages money from other places. And I'm wondering if there's a way to – there's a number or there's a percentage of your projects. [1:13:57] Speaker H (unidentified): So I would say every deal is different, right? Yeah. So, like, you know, I mentioned the Allagash. We were lucky. We have four partners there. We went to Mira, and we said, you've got to pick up a third. Jim, you've got to pick up, you know, we'd like you to donate the land. He's picking up the difference between what Mira got. So they were one-third, one-third, one-third, right? On the one for Stevens, again, we talked to them about the donation of the land. MDOT's portion is bigger, and the town's portion is bigger. So it doesn't – all these deals are different because there's different players, But, you know, it depends on the source. But we absolutely don't want to be alone in this, and we are always looking for partners. [1:14:38] Speaker F (unidentified): What I'm thinking is you've done this enough now where you probably could come up and figure out, you know what? A lot of this money, the taxpayer money going towards these projects has actually leveraged. We could probably put a dollar sign. Oh, yeah. That would be kind of interesting. And then the same thing with the fact that the rec department charges fees for these facilities. So now that we're, what, three years into or two years into fees, I'd love to hear more about how much revenue that's been generated. [1:15:10] Speaker H (unidentified): Yeah, and we did use some of those fees towards the playground. We've used some of these fees. We've pledged them back into it because, actually, we have to – everything has to go back into the MARC until the whole site is completed. And we did this sort of exercise where we asked our consultant to break down by each facility what, you know, the latest estimate would be because every year it goes up and we have to make sure that we're thinking in that comprehensive way. And we've got about $20 million left of work to do. We've got a lot of work to do. And so, yeah, we're always thinking that. How do we leverage other? And the next phase, we think, you know, there's going to just be the really big elements left. We feel like we're going to have enough to show there and enough progress made is what we've been told to go to some of these bigger entities who might help us with a donation, right, at some of these foundations and things who, you know, they don't want to be on the frontier, right? They want to make sure you can execute. And we are doing that. And every year we're adding, we're getting more and more. So that's why it's nice to activate that part of the quadrant as well so we can point to it and say, hey, you know, you want to be part of this. Like, this is the story, this is a real reason, there's all these people using it, and it just gets, I mean, you know, Sabrina can speak much more to the usage of the mark, but it's just outstanding, you know, the amount of people that are understanding this as a regional source now, just by every little bit that we keep doing, and they see we're getting it done. [1:16:40] Speaker F (unidentified): Yeah, I would be very interested in hearing, like, an update about MARC usage and lessons learned and things that we didn't see coming actually happened, didn't happen. That would be a very interesting update for me. So I don't know if we can do that at some point. Yeah, thank you. [1:17:00] Speaker E (unidentified): Councilor Ecker. A couple quick questions. Is it 101 Bath Road, the gas station? Yes. Do we have that now? Do we have control of it? [1:17:13] Speaker H (unidentified): We are waiting on a donation agreement, and it's in with their legal, and they are saying they're getting it to me. And we should have it very soon. We did actually talk to them and say we actually had to threaten the dangerous building process, and then they reconsidered to work with us. but it's been a long time but I feel pretty confident we're going to be getting it you know they've said we're getting it, they're working towards it so I'm hoping that's going to come on the 16th now, not the 2nd yeah [1:17:50] Speaker E (unidentified): great and I forgive me for getting a little confused about this but the mark, the slide before I don't know if I could come back up but this is which phase 1C that's being 1D? Yeah. Okay, so 1D. [1:18:06] Speaker H (unidentified): So we had the pickleball, quartz. Let me go back. [1:18:13] Speaker E (unidentified): So you're working on 1D? Yes. And did I hear you say we're hoping to start constructing this next summer? [1:18:27] Speaker H (unidentified): We would like to start next summer and fall. Okay. [1:18:32] Speaker E (unidentified): Because I think it shows it in the following fiscal year, at least in the plan right now. Yeah, and it's under projects and development. Yeah, okay. [1:18:43] Speaker H (unidentified): I just wanted to make sure. Oh, okay. We can coordinate that. All right. Yeah, that's our goal. I mean, we're fundraising and we're pushing, and that's what our goal is. All right, great. Yeah. [1:18:59] Speaker C (unidentified): Councilor Ellis. I'll table the one, because I had the similar question on the MARC thing as far as, because that obviously if it moves from in development to the 2728 line it makes that number even bigger than it was before so not that I'm only worried about numbers but certainly it's one of the things I am concerned about but with the parcel on Jordan Avenue 87 is just the thin strip there yeah and 101 is the gas station itself is there any impact to the house that's [1:19:29] Speaker H (unidentified): right there at 105 are they is that no it doesn't go to that house we have talked about that though because we would love to although i we just don't think we have the real estate to be able to make a sidewalk connection and a crossing with maybe a pedestrian hybrid beacon at some point but a sidewalk connection that goes to like the commercial businesses there you know again those businesses are all kind of like an island so we're really trying to figure out how do we do that So not at this point. There's no there's no impact on that house. And then with the 101 property [1:20:02] Speaker C (unidentified): Be awesome if they donate it but a question on that when they vacated the facilities are the tanks still in the ground? [1:20:09] Speaker H (unidentified): No, those are removed. Those have been completely And we've done a phase one and we've had we've actually done a phase one twice because they took so long We had to go back out there because it expired only good for six months So I had to get them back out there. We did get a donation of services. It's called a gift of services is through MCOG, the Mid-Coast Council of Governments. And so we did that twice. We're also getting a phase two done. But the phase two, we did pay for through them. The consultants to come out and just do a walk. They have an asbestos expert who came out just to kind of do an initial look of the property. So we've been out there three times on the environmental investigation. And again, we're not going to be digging down or anything, but we haven't found anything that's of concern and that's the one that just [1:20:56] Speaker C (unidentified): made me chuckle when you said that's the property you'd indicated was on the aquifer right because yes historically just behind that was the old Crystal [1:21:03] Speaker H (unidentified): Spring and the whole yeah we had to make the case because they keep they kept trying to put it on the market and they'd come through planning and I'd have people calling me and I'm like you can't it's you can't develop that site so anyway we did have to make the case that you know it basically didn't have [1:21:20] Speaker C (unidentified): have any value and all of that so and there's no problems anymore with that location in regards to the navy because at one point in time that was also locked down that the navy didn't want any level of people and or development in that area because of the runway we've been working with [1:21:37] Speaker H (unidentified): so we had because mira you know with especially with the long sight you know has oversight obviously from the faa and navy and everything else we've been we've been hooked in with them And also we've been hooked in with the water district. And, you know, we've been working with all those folks so everybody's informed, you know, and didn't have any issues with what we were proposing. Excellent. Yeah. [1:22:04] Speaker A (unidentified): Further questions? I have one, if I'm permitted. Do you have a copy of the – I'm not sure this is for you, Director Costello or the assistant town manager. Just looking at the recommended projects list in the CIP, do I see only two in here? I say only two. I see two, the $200,000 for Cook's Corner revitalization and recapitalizing that fund, and the $325,000 for the Affordable Housing Support Fund. Are those the two items in here that would have a fiscal impact on the next tax year? [1:22:48] Speaker H (unidentified): Those, yeah, those two. I thought there was a third. Allegiance. Global housing support fund, Cook's Corner. You know, I mean, the only thing I will say about the mark is that, you know, there may be some request for use of rec impact fees or other funds that are set aside, you know, that we've got in different, you know, like TIF revenues. Yeah, in the past we've used Bowdoin funds. You know, there's a number of funds that we may or may not need to help us, you know, with our funding. [1:23:28] Speaker A (unidentified): So all of the MARC projects are in the development stage for two years out. Is that what I should understand here? [1:23:42] Speaker H (unidentified): It should be for next summer. I don't know how you have it, Jay, in there. [1:23:52] Speaker A (unidentified): Jay, can you help out on that? [1:23:54] Speaker B (unidentified): I would love to help out on that. Yeah, right now it says it's two years from now on the draft one of this. And to my point earlier where this will go through probably four more iterations before we get to the final. yeah it sounds like this if they're aiming for next year then that would move up a year but also jump from projects in development to projects recommended for funding yeah and sometimes during [1:24:24] Speaker H (unidentified): this process like we'll either you know obviously if we have something great happen the town manager's office knows and knows like we push something forward because we've had an opportunity But that can also roll back the other way, too. So we are definitely going to get – our goal is to get those three things done, you know, the splash pad, the playground, and the field. But we will do something. We are going to be – I'm going to be – we're a little bit behind in our fundraising for this phase, but we're feeling pretty good about a couple of stakeholders that we're going to be hopefully working with. [1:25:02] Speaker C (unidentified): Councilor Ellis. Yeah. And so with that, with that moving, there are three lines on that particular project, two of which, and I don't want to say that I don't care about as much, but one is funded from impact fees, the other is from donations and grants. So again, no impact on that. But the big number of 4.3 million is general obligation bonds. Is that also what you're suggesting would be carried into? [1:25:20] Speaker H (unidentified): Last year, we had thought about bringing forward the turf field. We did back away from that, given all of the controversy around the product, and we didn't feel that our community was ready for that. Our consultant also said he thought there's been a lot more improvements on that, and so we kind of were waiting that out until we felt that was a better product, that we had a better source of funding for that. but at the time that's what we wanted to bring forward and because it is one of the elements of the mark that generates a lot of revenue and so yeah so that was that last year that's what we were thinking this year we're we've dialed back to this so i'm looking at draft one on this [1:26:07] Speaker C (unidentified): what were draft 1b if you will is going to move those things forward into this year is it not moving is the 4.3 million what you're telling me that was earmarked for the turf field and yeah [1:26:18] Speaker H (unidentified): Yeah, that was for the turf field. [1:26:20] Speaker C (unidentified): So it'll be some different number than we're seeing on here that's being moved forward into the 2017 one. [1:26:24] Speaker H (unidentified): And to be fair, I mean, the town manager's office, we had not even been to the rec commission until last Wednesday. So we haven't had a chance to coordinate on that and get it all cleaned up. Again, this is a first draft. So there are people still working every day. That's the thing that is happening is, like, things are kind of moving based on what people's, you know, work – what's happening. you know in terms of fundraising and everything else i'll lie and say i'll save my stress for later but it's when we get draft two then but again if we are able to get tiff revenues to be used for municipal facilities that will help immensely with the mark and other things yeah so [1:27:07] Speaker A (unidentified): one thing that would i think be helpful just a nomenclature here those items in currently in the projects in development, the three MARC projects, to just annotate those a little bit more fully about what do they all mean. They're all labeled Phase 1, T, or D, but what is each one? So we just have a little better sense of what the money would actually be going for. Yeah. Other comments, questions, and Councilman McDonald? [1:27:40] Speaker G (unidentified): Donald. Yeah, I think mine is just kind of a zoom out a bit. I suppose taking Councillor Hicks language to assign to it. It seems like, well, first of all, thank you for this presentation. There's a lot of things that the Economic and Community Development Department is kind of tapped into. And I'm wondering, I guess my higher level question is, do you feel, I suppose supported and comfortable in taking on this amount of projects like the it seems as though at least in my experience here a lot of these like there's some pretty substantial infrastructure and I get that some of those infrastructure projects are partially economic development because you're getting more businesses to go on those streets and mixed use development like I get all the different pieces and how you could make the compelling pitch that economic development you know should be involved with this but i know that y'all are in it a lot and it seems like you're doing a lot of this type of large-scale project management and i'm just wondering like how do you do you feel like you have the resources to do that like do you feel [1:28:51] Speaker H (unidentified): like what is the temperature or gut check on that yeah so i would say we 're very we're very busy but we are we're really connected in with all the departments so we really focus on I hate to use this word but the deal side of things and bringing resources to bear but also have experience in real estate development have worked on things like this and this is actually and putting together partnerships in order to get things to move forward so I think we're really focused on that part of it we don't have to worry about the engineering you know we've got a lot of support there you know the finance department ends up you know helping out with a lot of different analysis and things, or supports us in what we've done and checking our work or whatever to make sure that they're comfortable with whatever we're proposing. I will say we do, we're really focused on grants. I think Chrissy has like eight grants or something. So we're trying to figure out one of the things we could really use help on, and we're trying to work with Darion on this, is a better reporting system on the grants, because you have to manage these things, right? Right. But yeah, I mean, at some point it would be great if we had a third person. But, you know, we'll see. I'm not necessarily making that request right now, but. [1:30:12] Speaker G (unidentified): Cool. I can empathize on the grant reporting side of things as someone who does grant reports. But I just think it's it's an interesting point of conversation, perhaps in the future for, I suppose, a future council or council to have around like that organizational structure. because i know that we have a lot of projects that come through here and kind of like how they land in the different departments is always an interesting i guess like i don't know the word i would assign to it 's a it's an interesting test to see who gets what and when [1:30:45] Speaker B (unidentified): yes sir can i just follow up on that i think that's a an astute observation there are certain departments that are involved in almost everything and you'll see that thread through a lot of these presentations, that eco-dev has a part in something, and engineering has a part in something, public works has a part in something, planning has a part in something, Parks and Rec has a part in something, and finance has a part of something. We try to apportion projects based on where they are at any given moment in terms of who's going to carry the workload on it but it is not it wouldn't be surprising to have a project meeting about something and to have five or six department representatives at it and that's maybe more than norm than it is the you know atypical it's just that's how we work and those departments there's a reason why they're fundamental departments to how we operate as a town right that they most of our projects touch so many different elements of the various disciplines that you really can't sit in a room and talk about something without having everybody there to weigh in on their on their particular focal [1:32:07] Speaker H (unidentified): point and i will say we don't have operations so the parks and rec department has operations they got to focus on we're on the real estate working managing the consultant managing the land development all that kind of stuff not to say and obviously you know tom and i were co-project managers but that is kind of a helpful balance because i can focus on the money the management he can focus on the operations the needs you know the revenue all that kind of stuff that they need to make sure that everything is you know responsive to the community right that what we're building is [1:32:43] Speaker G (unidentified): what they want and everything so yeah i 'm not necessarily casting judgment on the system i was just curious as to the how you know the system kind of works in those places i suppose yeah other [1:32:58] Speaker A (unidentified): comments questions i'm gonna jump in just briefly here myself then just to note that in understanding acknowledging that this is a first draft and some of the earlier comments big picture ones about how things change over the course of the next four or five months i will note that the difference between total cost of infrastructure leaving apart what they afford how they're funded is about 13 million dollars more this year in this draft than it was last year and that carried out it's all in infrastructure basically the roads and culverts and other basic infrastructure items that Assistant Town Manager Astle was talking about. And that carries all the way down through the list so that at the bottom line there's still $13 million increase because everything else is more or less smaller increases and kind of comes out in the wash. If we move the $5.6 million for the mark again leaving aside how it gets funded up into the recommended list. Now we're $13.6, almost $19 more. Just a cautionary note that we're going to need to put some serious work into this list as we go through the next few months. Councillor Ecker. Yes. [1:34:37] Speaker E (unidentified): I think it's a great observation. I think I'm just going to give a very brief comment on Councillor McDonald's comment, meant, layering on yours, that's a lot of projects to put through a pipeline with limited staff, I guess, to do that, many of whom have operational day-to-day responsibilities. So I just say, maybe I'll just leave it there for right now. but it does it does speak to the perhaps some larger need for project management capabilities with these things if we're really trying to do that many it's a lot of money we may not but even without moving the markets still a lot of projects so just maybe food for thought for now thank you [1:35:34] Speaker I (unidentified): finance director flan please i just want to highlight something else i know big picture we're looking at these amounts of what we spent last year versus what we spent this year but if we dig into the funding sources you know last year we had 250 000 in donations and grants this year we're budgeting for 1.9 million tiff revenues we use just over a million this year would be 2.8 just about so next year this CIP for yes so it is more but I think it's going to be important to really look at where the money is coming from and take that into consideration too yeah and I just respond to that [1:36:19] Speaker E (unidentified): absolutely that makes a difference it's also I'm speak trying to speak to the capacity of our staff to be able to do that amount of work. [1:36:33] Speaker C (unidentified): And I would add that I appreciate the fiscal capacity concern as well. [1:36:37] Speaker I (unidentified): I don't think we'd ever turn down more staff. [1:36:41] Speaker A (unidentified): And I'll just add one of my recurring refrains is that TIF revenues are taxpayer revenues too. They're just categorized differently and has real advantage to putting them in that category, but they're still taxpayer revenues. Any other thoughts tonight? I'd be happy to entertain a motion to, thank you, Director Costello, for a really good presentation and coming with us this evening. We have a motion to adjourn, thank you. [1:37:14] Speaker F (unidentified): I move that we adjourn. [1:37:16] Speaker A (unidentified): And second from Councilor Ecker, all those in favor? Good night, everybody, thank you. Good night.