York School Department Presents FY28 Capital Plan and Discusses Consolidation Options

2026-11-03 · 1h 44m · Source: Capital Planning 11-3-2026 (Town of York (YouTube))
Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[0:03] Speaker A (unidentified): All right. So we are a couple minutes after, not after 11, it's after 10. Ignore the clock in the corner there. So we're here at the York Public Library, the community meeting room, and this is our 2026 for FY28 capital planning committee, whether you want to use a calendar year or a fiscal year, I guess, to describe it. so today we'll go around the room do introductions the people at the table probably won't change for most of the meeting so that's good but today we have a school department here we've got several school staff so i'll lead off we'll just do introductions peter joseph i'm the town manager wendy anderson finance director [0:47] Speaker B (unidentified): robert parma select board. [0:49] Speaker C (unidentified): Board of the Planning Board. [0:51] Speaker D (unidentified): Kim Doakes, Superintendent of Schools. [0:53] Speaker E (unidentified): Neil Rideout, School Board. School Committee, School Department. I know, I'm giving myself promotions everywhere. [1:00] Speaker F (unidentified): Amanda Suddy, I'm the Assistant Superintendent. [1:02] Speaker G (unidentified): Marie Evans, Vice Chair, School Board. [1:05] Speaker H (unidentified): Courtney Munoz, Vice Chair of the Budget Committee. [1:08] Speaker I (unidentified): Heather Campbell, Budget Committee. [1:10] Speaker J (unidentified): Marla Johnson, Select Board. [1:12] Speaker A (unidentified): All right, we got a couple audience members who are also town officials, so anyone watching at home, you for tuning in so i'll just kick off here really briefly tim and i met a couple times as recently as yesterday on the school committee capital plan is any change from our plan yesterday of two days tim and how we're gonna break it up okay so tim's got today the five year list of capital projects to go over with us that are i'll just say these will not change throughout the capital process unless we make a change we don't fund them and we decide to do them at a later date or something like that after consulting there is also a question that's floating around of school consolidate I shouldn't say question there is an open discussion that's been going on for quite a while on school discussion school consolidation that's floating around so Tim and I talked about that is I understand it is there's the plan still to have school board our school committee sorry discussion later [2:13] Speaker D (unidentified): this week and on that okay correct yeah today we'll do the capital improvements the five-year and then what's we'll be asking for FY 28 and then we have a school board meeting tomorrow night to wrap up some of our reorg discussion and then next Tuesday we'll talk strictly about the reorg if you like I think [2:31] Speaker A (unidentified): that would be great does anybody at table have an issue with that I think that's probably a good course of action good Marla I have a question that's not [2:38] Speaker J (unidentified): school process related I was hoping we could revisit a couple of things that we talked about at our last meeting will we have future meetings where that would be yeah we have [2:50] Speaker A (unidentified): at least one meeting or we can do it either after the meeting today if there's open municipal items or after the meeting next tuesday as well either of those are fine with me if that's good that's great whatever as long as we have opportunity whatever our appetite and schedule allows you after we talk with the school department right now we can take up some open municipal items we are going to schedule at least one follow-up we have them on the schedule but one of those two follow-up meetings we're going to need to do because I still have like three or four municipal departments that are small but we still need to go through all those items so all right so Tim and I talked about their programs or sorry the projects that they have scheduled in this capital plan and my understanding correct me from wrong any folks from school these items depending on the school reorg consolidation plan that's that you guys come formally endorsed and come forward with and that we discussed next week some of these projects may shift a little bit but there's nothing that's contained in here that is irrelevant based on any of the school consolidation schedules right they all have to happen maybe the timing might move a year or two on a few of the projects but these are all projects that we're going to talk about today that happened irregardless or regardless maybe i'm not sure grammatically how to use that of the school consolidation and the school reorg plan that comes forward okay awesome do you wanna tim dennis do you how do we wanna yeah neil let me start off [4:21] Speaker D (unidentified): and thanking everybody for this process we'll talk about the fy28 capital i'll be referring to this booklet that we just passed out for the most updated pieces in that, like Peter said, everything in the FY28 will not change from today on. So we'll hopefully stick with that throughout the process. It was a little bit of a tough year last year, but this is, I think, much more laid out over time. So Neil is our new facilities director. We went all summer without a facilities director and finally hired Neil into September. So this plan was worked on with all the principals, myself, and the coordinators in each building all summer. We spent most of our summer kind of mapping out, repricing things, getting more accurate pricing on everything. So I'll have Neil start off. We're going to start with Village Elementary at the very top. and then we do have photos that go through everything that is happening at Village, so you'll be able to see firsthand what we're trying to discuss. [5:26] Speaker E (unidentified): It's starting off at Village Elementary. And right off the bat, this is an item that we kind of shuffled around a little bit. On our original five-year plan, we had the walk-in cooler and walk-in freezer in different years, and it didn't make sense to us to do those in different years because any kind of cost savings, it would make more sense to do something like that in the same year. the walk-in cooler and the walk-in freezer at village elementary are undersized been undersized probably since the place opened and at the end of their useful life we got numbers to replace each of those and you can see those in there it was 45 and 65 respectively and if you look over you got pictures of the walk-in freezer and the walk-in cooler now what's the what's the cost [6:16] Speaker I (unidentified): savings of doing both at the same time? We don't but we know if you bring in that [6:22] Speaker E (unidentified): contractor to do one and you bring them back in a following year to do the other one it's you know you're gonna realize a savings doing them both at the same time because a lot of the cost of a company is just showing up so just the idea that they'll show up to do both. We could definitely price it out but I [6:41] Speaker I (unidentified): I think it would be a really good idea to just have an idea that we'll pay 20% more if we do it in two years. Correct. Just so that you have a numeric. [6:49] Speaker E (unidentified): Okay. Yep, we can look into that. The next item is the gym doors over at Village Elementary. From a distance, they don't look too bad, but when you start zooming in and looking, unfortunately, the climate we live in, and it affects all five of our buildings, it's a salt air climate, and you guys all probably notice it with your houses. anything metal outside corrodes really fast and if you look in that's a metal door frame that's just corroded if you if you yanked on that hard enough unfortunately I don't know how strong that would be so you know we're looking at replacing some door frames the exterior lighting and I apologize I don't have any picture of the exterior lighting up at village it was just really difficult to take a picture of a dark parking lot but the upper lot if you guys have ever been up there after hours it is really dark and needs some [7:43] Speaker I (unidentified): help up there from one of my colleagues Melissa wanted us to ask if you guys are talking at all but with York ready for climate action or the climate action [7:54] Speaker E (unidentified): committee on this we haven't with them yet no but I think anything we do is [8:02] Speaker I (unidentified): with a knife reducing our carbon footprint yeah i think getting the climate action committee involved in this would be really useful for you and yeah it'd give you some expertise also [8:12] Speaker K (unidentified): that you don't necessarily have to absolutely unit [8:21] Speaker E (unidentified): ventilators a unit ventilator that again it was i didn't provide a picture of it 's just a box that hangs in a classroom it's a self-contained unit that provides heating fresh air and they're mostly used in schools and in classrooms you wouldn't really use one in your house they're at the end of their useful life up at village and we need to start replacing some of those the moving on we got a price for those go ahead so [8:51] Speaker J (unidentified): start replacing how many are there in total and how many would you be replacing [8:54] Speaker E (unidentified): for we were hoping to start replacing two a year and this is something that potentially could be affected with consolidation so we would definitely be [9:09] Speaker K (unidentified): looking at areas that wouldn't be affected so this dollar amount would [9:14] Speaker J (unidentified): cover two yep and how many are there total in the whole building I'd have [9:19] Speaker E (unidentified): to get an exact number but I would say there are probably around 25 to 26 I'm [9:24] Speaker J (unidentified): just I'm just remembering back when we did the I think it was the windows at the middle school and it turned into a phased project and I know some of us didn't realize at the time the first year we thought oh okay we're replacing the windows done and so I just wanted to flush out okay so this is two out of about 25 or 26 so you would see that something they're being budgeted every [9:47] Speaker E (unidentified): year for that kind of yes thank you oh you're welcome if anybody has any questions please feel free to flag me moving on unit ventilators membrane roofing same we're finding our capital limit is 25 000 and our roofs are just at nearing the end of their useful life and what we're finding is the repair process for them we're getting bills that are going over our 25 000 so we felt we had to put it into our capital project for all the buildings actually to start budgeting on the capital plan for roof repairs where we're getting to the point where we'll probably have to do a roof study and look at replacing some roofs but in the short term our roofs are good they just require maintenance to you know keep them sound what were the [10:43] Speaker A (unidentified): difference just in rough order of magnitude for a full reap rehab or replace on one of those schools as opposed to the 30 000 for maintenance hundreds of thousands yes yeah so i mean [11:01] Speaker E (unidentified): it's worth it for us to maintain them you know playground upgrade over at village elementary i learned a lot about playgrounds my previous life working at the high school we didn't have a playground so interesting some of the rules i learned i didn't realize the rules that are in place for kids of different ages a kindergartner for instance can't play on the same playground as or a pre-k can't play on the same playground as a first grader never would have known that and once i learned that in talking to jay up at village elementary the principal up there we actually went out and walked his playground he's got implements up there that he has to close off aren't safe for little ones so doing a fresh playground up there is [11:52] Speaker A (unidentified): is absolutely vital to his operation how is that handled operationally tim or amanda whoever is dealing with that to so we have like an all-age playground now would you say or [12:05] Speaker D (unidentified): are there components that are yeah pre-k needs its own existing playground now if you're in first grade you could still play in that playground but kindergarten you can't go to a first grade and a lot of it's all the implements are low to the ground so if there was a spill or a fall it's not like you're coming down four feet you're actually at the ground level a lot of its earth mounds that kids can climb and things in the earth mounds balance beams smaller swings but the big set swings that are there now in the jungle gyms or monkey bars that schools put in and they can't be on those, it's not. [12:42] Speaker A (unidentified): So we currently do like access control, keeping the kids off of certain elements. That's right, there's a certain, [12:47] Speaker D (unidentified): I think there's two or three implements they can be on. And they can run around, but they can't be on the big swings or the slides. [12:53] Speaker A (unidentified): So that's managed by whoever's observing at recess? Right, teachers. [12:57] Speaker B (unidentified): Labor intensive. So I know we're not talking about school consolidation, but, and I may not be up to date, But the last I knew, it was two school, two buildings that you were going to keep, and you weren't going to keep Crescent Village. So I'm assuming you're putting this much money into Village. That has changed. That's changed. So what is the plan now? [13:21] Speaker D (unidentified): That's next Tuesday, but we will talk to our board about this just to make sure all the board members are on board. I think there's a couple that have talked about keeping pre-K at Village and combining that with the superintendent's office rec department [13:36] Speaker B (unidentified): so what percentage of the school would be in village yeah I mean you could try [13:45] Speaker D (unidentified): to go universal but we had an extra classroom for this year and we met all the 16 that were on waiting list so four classrooms so you got superintendent in [13:57] Speaker B (unidentified): there as well correct how much is left after you have schools or how much the school i would say a [14:03] Speaker I (unidentified): good 60 percent is the schools yeah okay yeah so based on the state standards i just did the calculation the classroom space would require 2240 square feet for four classrooms because it's [14:17] Speaker B (unidentified): 35 square foot per kid i guess so when i was involved in we had some meetings talking before for the community center all that got off the ground it seemed to me that any conversation we had was that a school campus had to be secure and so you couldn't allow the public to come and go on a school campus so this would sort of mean you village would be totally for the schools [14:45] Speaker D (unidentified): no you wouldn't allow people to come no that sort of trouble if students are in a building it's considered a school although you can go the legislature to get approval to actually have a big part community part school on their approval I've been working hard over the last week contacting people the DOE to give me that answer because I've experienced that in my last profession I was in we did the same thing, we took a school, kept a grade in it, and brought the community in for town office, and even to serve lunches to community, so. [15:22] Speaker B (unidentified): Yeah, I guess I thought it was the policy of the school, locally, I guess I didn't realize the state piece, but I thought it was the policy of the schools to secure campuses that they didn't want. [15:34] Speaker F (unidentified): That was our policy, you are correct, we made that a policy a year ago, to close our campuses to the public, and so this would be making a change to either our the state policies laws and also district procedures and policies if we were to make this shift and have the public be at village but to [15:56] Speaker A (unidentified): interrupt and be clear that's not a formal decision that's been made yet but it's one of three scenarios or two or three or five depending how you do it that is expected to be maybe you can speak for the score expected to be discussed at the school committee meeting yes tomorrow night we will be discussing it at length there so if that if anything if that discussion results in not having pre-k or k or any of the you know the junior elementary levels at village this project would [16:23] Speaker F (unidentified): go away no this we still need to have a playground at village that's appropriate for the age of students that's there so whether village is there for three more years or so you don't have one [16:33] Speaker A (unidentified): currently the concern is that it's not or at least it's not set up correctly yes correct it's not the [16:39] Speaker F (unidentified): best playground for our pre-k students and so wanting to give them the opportunity so regardless [16:45] Speaker A (unidentified): of what the reorg plan is you would have some proposal to make a change at village at least even if it's for three years for that period of time or something like that you mean for [16:56] Speaker I (unidentified): the playground yeah for the playground yeah okay so however if the school board decides to move forward with this proposed plan where pre the four pre-k classes stay at village one of the things we've talked about is needing a separate entrance and so this sketch is probably obsolete from what we would we may or may not need for if we make that change so i think robert is getting to the question of are we building something that we don't actually need and so based on how the school department votes tomorrow if it's only pre-k in the in village then we may not need this as large an expense for the playground because we also need to we'll need to reconfigure the entrances so there'll be some redesign so i would definitely flag this one for future like [17:51] Speaker A (unidentified): honing down as we get closer through the budget season before we get to march obviously but it stays, the opinion of all school officials here is this should be on the plan. Maybe the scope might change a little bit depending on what the final outcome is. Okay, that's great. [18:08] Speaker J (unidentified): Could I ask a question about this one as well? Can you remind us the history of the playground improvements that have been done at Vest? As I recall, within what, the last five years or maybe time flies, there was a big project to improve one of the playgrounds. And then I think maybe there's been some smaller ones and the portable was removed and that sort of thing. So can you remind us what projects have been done there already for how much and in what timeframe? And then I'll call it a placeholder for what's on here now. Looking at this schematic, is it this lower that you're talking about and not the upper? [18:51] Speaker E (unidentified): Correct. the lower area is the pre-k area the upper area is the playground you're talking about that was redone within the last few years okay has there been any [19:01] Speaker K (unidentified): work done to the lower area there's a little bit a lot of talk of that work [19:07] Speaker J (unidentified): but nothing's been done okay and did remind me did the old portable get [19:14] Speaker D (unidentified): removed correct so thank you for bringing that up Marla that was the reason why now it's an adequate place because we can move that playground up into the portable area because the portable is no longer there and the bottom area of the playground could make an additional parking which is definitely needed at village so the area shown on this [19:33] Speaker A (unidentified): sketch the upper part has been construed that's pretty close to my recollection of what it looks like the lower corner the triangle part in the lower section of the building is where the portable used to be so part of the current playground and part of where the portable is along the backside of the building would be could be turned into playground space compliant playground space and then the parking over there would be the feet in the next project that i'm assuming we're headed to in a second once we get done with these questions parking okay or one [20:02] Speaker H (unidentified): of the next two or yeah so this is a design sketch of essentially what the concept would be if we renovated the playground because it's pulling it around the corner there so this is not current [20:14] Speaker I (unidentified): this is a future design or old i'm hearing two different things so i was on the committee for the playground i remember this being one of the sketches that they presented of if we wanted to do both playgrounds this is how they could tie together so i am understanding that this is an old sketch old sketch of a future design of a future design right so that's not either the plate the placement of is you know of the playground should we move forward with that plan and these elements could change substantially depending on how the [20:47] Speaker A (unidentified): school board votes conceptual space how you would hope to utilize the space has been freed up by the portable going away [20:56] Speaker E (unidentified): to finish up village the perimeter fencing is in need of some upgrades they're constantly worried about kids safety sneaking through holes in the fence and it needs to be upgraded and finished off. There's multiple holes. Get any pictures of the fencing? Well, all I have is a conceptual picture of what a new fence would look like. I didn't take pictures of the old. Unfortunately, when I went out taking pictures, they were using it and it felt a little creepy to be walking around the playground. And then the last part was the parking, which the great thing about that parking is no matter how we use that building, parking is very tight up there and it was an interesting way I'll give Jay Delahanty credit he came up with a way to get some more spaces in there and you [21:54] Speaker A (unidentified): know it's a it's actually a really great idea so conceptually there's not any future utilization of the building other than scrap and sell that's really not on the table right now where we don't anticipate needing more parking at that correct especially if uses increase or split in the facility is that yes can I [22:15] Speaker J (unidentified): ask one more hopefully closing question on the playground issue so if the setting aside the next few years if the ultimate plan is to keep just pre-k at village and no other grades wouldn't it make more sense to modify the existing an existing upper playground than to? [22:38] Speaker E (unidentified): Not necessarily, because you don't know [22:40] Speaker K (unidentified): what the rec department used. [22:42] Speaker J (unidentified): Lower the, as you were talking, Tim. [22:44] Speaker E (unidentified): I don't think you, it may end up costing you more to actually modify the old stuff and bring it down. I never even looked at it, but that playground could be used for rec programs if that's what ends up there. [22:58] Speaker I (unidentified): It also has to do with proximity, right? Aren't there rules about the proximity of the playground? [23:02] Speaker B (unidentified): Yes, there's rules about bathrooms. [23:04] Speaker I (unidentified): rooms and they're closer to the lower one close to the gym so that's that's another side of the building it's the whole other side of the building so that one and one of the security questions that's come up is that if the pre-k were on this kind of lower you know lower east the southeast side that would also provide quite a bit more protection from as a closed campus by having it on a different side of the school. [23:34] Speaker J (unidentified): Lots to think about, thanks. [23:36] Speaker B (unidentified): There is, there is. [23:40] Speaker E (unidentified): Moving on to Coastal Ridge, if there's no other questions on Village. Drainage up at Coastal Ridge, and I'm sure most people have heard about this, is really an issue. There's a lot of ledge up there, and the building itself, as you can see from some of these pictures, I feel like there's been lots of fixes over the years and some have worked partially and some have not worked so well. What I think we need to try to do is where you're looking at that crushed stone, we need to put some drainage in there and tie it into some storm drains and pull water away from the building. A lot of the landings around the building were poured completely level. so as those walkways have been paved over and maintained they end up building up over the years and they're not things aren't sloped away from the building as much as they should be so we're hoping to pull some of that moisture away from the building the roof design we get a lot of ice dams you look at some of the pictures. Ice dams, for anybody that's not aware, ice forms when you're losing heat through a roof and your snow starts condensing and it turns to ice. And then once it turns to ice, it starts backing up your roof. And shingle roofs and roofs in the northeast are designed to shed rain from the top down, not the other way around. So when you start backing up you start getting leaks inside your building so what i believe has been happening and what you know we've had a couple roofers look at it we 're pretty sure that areas are under insulated and some of the insulation has gotten wet over the years when that insulation gets wet it loses its r value and exasperates the problem so that's why we're getting ice dams worse now than we did 15 20 years ago it's an exposed overhang in a lot of these places yes [25:52] Speaker A (unidentified): yeah yep so heat leaking horizontally from the building into the eaves on the overhang would cause that problem sorry for the reference snowballs and [26:04] Speaker E (unidentified): and these are all pictures of last winter of us shoveling the roof so we 'd like to take off any of the rolled roofing that's up there 's quite a bit of it and i think you combat this a few ways we could add metal edging we could add some heating on the edge for some of those we got to peel back the roofing and fix any damaged insulation that's up there so you know i think we got a pretty darn good plan and i almost feel bad saying that because i know i'm not the first person that has said i have a good plan to fix the ridge at coastal ridge so you know this is this is our crack at it now and i really think no matter what we do with that building we get a responsibility at some point to turn that building over to somebody in [27:01] Speaker B (unidentified): good state so well i'm not sure we do have that but so i apologize already for my next question which is about school consolidation so how many years do you think you will be occupying this building three [27:18] Speaker D (unidentified): more the votes well that's that's that's it's hard to ask that question robert i mean no you have a plan i mean if everything goes well right three years we were plan to cut down the tree today but in a perfect world the plan is three years [27:41] Speaker B (unidentified): so you know investing in a building that you're only going to have for three years you just need to think about and i not sure we do have any role in making sure that it's whatever shape it's in when we decide to probably get rid of it so i think this is this is a tricky one because [28:02] Speaker A (unidentified): assuming that no project moves forward let's say we know what listening to you folks and what the school department is going to propose but there's still the voter hurdle so if nothing if nothing passes let's say you which i'm sure you will let's not hypothetically you guys put forward the best plan in the world it makes sense to all of us but it doesn't pass the voter hurdle for whatever reason maybe even though it makes sense and it's the best laid out financial plan it still doesn't get voter approval you still have kids in coastal ridge forever moving forward until something changes so you're what i'm what at least when i talk with tim what i'm hearing from you is that you're reaching the point of like damage to the building that's right if we don't address these two issues and i guess if there's a voter approved plan that eliminates the school and to get to robert's point say there's a voter approved plan that eliminates the school funds the elimination and we're moving kids in two to three years maybe we evaluate at that point whether you do the project and if our kind of long-term plan is that i guess there's a lot of hypotheticals here but if the building goes away to get to robert's point and we you know the most valuable part of the site is the land and there's no one's gonna pay for the building and there's no use in selling the building. Maybe that's a scenario where we don't need to do either of these two projects because we don't care if things get worse for a year or two and there's structural damage because the building has no long-term value to the town. That would be a scenario where maybe we would not do these projects. Correct. In most other scenarios, you folks think that these projects need to happen. Is that the best assumption? [29:45] Speaker D (unidentified): And that's where we hopefully will share with you next Tuesday is the actual timelines and it's 2930, the year 2930. A point I wanted to make, if you look at the picture where the gentleman is shoveling the roof, I think it's third page of pictures in. Just so you know, because we talked about it before. These are air intakes. At the bottom of that picture, by the building, that little vent area is an air intake. take yeah and that's where the moisture comes off the building onto the ground and back into the building so that's what's happening in the coastal ridge because of the design of coastal ridge we're getting moisture into the building which is causing issues in the building window sills doors air quality to a [30:31] Speaker G (unidentified): degree so we also Tim can I don't remember but the amount of men we had up shoveling the roof last year wasn't it like 10 to 15 men shoveling the 20s for hours and then they [30:45] Speaker A (unidentified): have to snow blow the area they push the snow off of the roof so in a weak snow year not a big deal in a heavy snow year it's a lot of unexpected major expense yeah did you have people up [30:57] Speaker K (unidentified): on the roofs of your other school buildings last year no coastal ridge was the only one was the [31:02] Speaker J (unidentified): only one where it accumulated i mean we got the same amount of snow another roof the design of [31:08] Speaker E (unidentified): the roof itself like we didn't have ice dam issues at any of the others we had to get the snow off the roof it wasn't as much snow load as getting the snow out of the way to prevent the ice dams [31:18] Speaker K (unidentified): from the leaking inside the building buildings you were able to leave it leave the snow in place so [31:23] Speaker A (unidentified): if we got you didn't have the risk of ice dams we got 15 feet over two weeks you'd have to go and shovel the flat roofs, the same as you had to here, but even when there's a low snow year, you're still spending time on top of coastal is what you're saying. [31:34] Speaker E (unidentified): Yeah, the ice dam issue up there has really reached a tipping point. [31:44] Speaker C (unidentified): Sorry, I could maybe share a little bit of history on this. I actually was on the school committee when this building was approved and built, or before it was built. And in the school committee's defense, fence we had no control over it there was something called a separate organization called the school district at that time that was responsible for all design and building a capital building and the school district they were entranced they had two final there was a company that built lots of schools and one that had that had that had never built a school before but they were entranced by the architect they loved the design they loved the cost and they went with that and pretty much ever since there's been problems with that building because it was not designed for its [32:48] Speaker I (unidentified): use is there any connection between fixing the drainage and fixing the roof how do you mean well if we fix the drainage and did some mitigating to the roof would that eliminate the issue that you're getting because what I'm what I'm seeing is not just rain coming down and you know pushing against the building [33:13] Speaker E (unidentified): but also snow the two could work hand in hand in that some of the roof issues as far as or i should say some of the issues and getting the water pulled away would be installing some gutters so i mean the two are definitely tied together i don't know that one definitely affects the other more i [33:35] Speaker B (unidentified): guess the time frame also is i mean if we go forward with all this it gets approved essentially a year from now and then it's another year before you do the work so you're two years in and you're going to use it for three so it becomes real a question whether you want to invest this in the building when that's really like you'd have use of it for one year I mean I know the plan could change right yeah [34:01] Speaker E (unidentified): no we don't totally understand that thinking you know a year ago we were looking at keeping coastal ridge and you know shuttering village and we went a year without really doing a lot to village yeah and then we were looking at two schools and yeah plans and flux but at some point we need to choose a course of action and move forward [34:21] Speaker A (unidentified): well yeah i mean i think this yeah this lays out the situation all possible situations which i appreciate this will probably get you know changed and this will be a funding discussion as we get further along as decisions are made and it'll be even a funding discussion into next year and the year after and just so we're all clear on the same page even if the project is funded but things change in the future and we haven't done the work it doesn't mean we do the work if it's unnecessary to do the work so we have those discussions frequently about capital private well what if something changes so we don't that's where wendy comes in and we don't bond the money or we don't you know you guys even if we have the money you don't issue a contract if something changes up until the date of a construction project is necessary so there's a lot of decision points where this might get rolled back and i think right now we're just looking at a all cards on the table what might be necessary so to that point just wondering in how [35:18] Speaker H (unidentified): we structure the warrant articles is there an opportunity to have a single warrant for example around all roofing repairs for schools that would allow for flexibility or maybe a less expensive option becomes available to do a short-term fix let's say you know at crest and then allocate the funds to the high school if that needs a roof repair or something [35:41] Speaker A (unidentified): like that I think we did a I think we did a consolidated one for building improvements last year which was a pretty good light duty it was only three or four different projects but that would be another good thing to look at for several of the school projects maybe by school or by type of project so it would have to be grouped somehow that made sense to the voters but yeah so for [36:02] Speaker I (unidentified): bond purposes if it were bonded we still have to track every project [36:06] Speaker J (unidentified): individually unfortunately [36:18] Speaker E (unidentified): what I think every school district does everywhere in the country is you run out of small spaces and I think we have a lot more need for offices now and smaller settings than we ever used to and over the years coastal ridge has taken larger rooms turned them into smaller rooms and I think a lot of times you think it's as easy as putting up a wall until you realize one side of the wall has the heat and the other side of the room doesn't. And I've seen it in our district, I've seen it in other districts, and I subscribe to trade magazines and it's a common practice all throughout the country. Fortunately for us, a lot of those areas can be fixed fairly inexpensively with heat pumps. And that's what we're proposing to do in some of these areas is we got some areas that need definitely more air some heat i when you walk through coastal ridge it's interesting we got areas that are bringing in fresh air and it's tempered but it's not really heat you know you don't just dump cold air into a building in the winter you temper it but it's not like coming in a 50 as opposed to the 20 degree outside you turn that thermostat up and it doesn't go anywhere so you know fortunately heat pumps have come a long way and it's it's something we can fix fairly [37:40] Speaker J (unidentified): inexpensively so he pumps are about 25,000 each and with these would these be connected to a an existing centralized system or they would [37:55] Speaker E (unidentified): actually work independently of the central heating system in the school itself that's the drawback is they don't all they would each have their own [38:04] Speaker J (unidentified): outside exterior unit and they're about 25,000 each roughly yep ductless [38:15] Speaker I (unidentified): I'm gonna ask the question about the climate action committee again this might be another opportunity to engage with Taylor to see if there are any grant opportunities from efficiency main especially for school heat pump upgrades grades and changes also are heat pumps movable yes i mean yes i mean it's you're thinking if we [38:39] Speaker E (unidentified): if we ended up abandoning the building we use them somewhere else yeah i think you would have to you know evaluate each one and see what you know the viability is of it but yeah we i mean you're [38:51] Speaker A (unidentified): paying if a third or the cost is install you know two-thirds is equipment you're paying that install cost twice but equipment does have a 10 20 30 year lifespan depending how well they're [39:02] Speaker C (unidentified): maintained so and i will say that we asked that question for our house and it is not cheap you know you're not saving the whole cost of it by far but it depends on the age of the unit and the appropriateness of the size whether it makes sense the length of the line and the type [39:21] Speaker A (unidentified): of refrigerant as well because it's all going to be recovered at a high cost for per ounce. The longer it is between the outside unit and the inside unit, the more waste there's gonna be, more copper piping, all that stuff. [39:39] Speaker E (unidentified): Portable building improvements. We actually are getting pricing now. Our last school board meeting, they wanted pricing for the potential of replacing the portable unit versus putting some money into it. The portable unit that's up at Coastal Ridge right now, which is needed it was originally meant to be temporary it's been there for a whole lot of years that makes it way beyond temporary when you go in that building and look around it's it's came in two pieces those two pieces are starting to pull apart one side settling a little more than the other I had the pleasure Saturday of going out and crawling around it and under it and around it and it's it's a temporary building that is there far past its life expectancy it's a nice space out there but it's you know inside it's falling apart it's a good you know area as far as large enough good sized classroom we either got to put some money into that or move it out and get something new it's it's well beyond its useful life and we asked to look at new [40:50] Speaker G (unidentified): with the intent that if we could move it in the future especially during transition phases of how could it be best utilized not just a grass as I [41:01] Speaker J (unidentified): recall touring the schools a number of years ago it was used for stem and maybe art stem is still in there yep you didn't tell them it is there stem is [41:10] Speaker I (unidentified): there a lot for extra extracurricular activities because it could be locked on its own so odyssey of the mind you know things like that often move there also it's the [41:23] Speaker A (unidentified): primary om yes area as many of us know firsthand vacuuming those carpets are very fun and flushing [41:32] Speaker I (unidentified): toilet you're flushing toilets with buckets in the winter right yeah running water we're having [41:37] Speaker E (unidentified): issues with lines freezing underneath and you know that if you crawl underneath that as you can see by some of the pictures. The insulation is starting to fall. [41:47] Speaker A (unidentified): So the $50,000 in here would be to rehab the existing unit. Rehab. Correct. And not buy a new one with the knowledge that we are not in the current plan. Any of your current scenarios don't anticipate this being a 30-year need. Right. Yeah. Correct. Yeah. In the short term, there's a short-term need to make those fixes, though. [42:06] Speaker D (unidentified): Yeah. How about another $100,000, $150,000 more for a new unit? and if we did receive a new portable we probably would relocate it in a closer proximity to the building it's a little bit of a walk to get there but I'm not gonna you know as a superintendent who's looking out for children it's it's it needs help and I have a hard time believing that or continue and trying to go with this portable, with the shape that it's in. I think they deserve better. [42:42] Speaker A (unidentified): So if the long-term plan is kids at Coastal, if that changes, then this would be a non-repair and would be a replace immediately. [42:52] Speaker D (unidentified): Everything plays out and we won't need to replace it because we won't have kids up there. [42:59] Speaker E (unidentified): There's a problem with sewer lines under the gym and kitchen area. We've had it scoped. we kind of got a pretty good idea where it is it's a candidate to I don't know if anybody's ever heard of having sewer lines reline if this is a candidate for relining again I apologize there's really no pictures but it's one of those things how do you take a picture of a sewer line underground and honestly if I had a picture when it was flooding it would be wonderful but I'll pull a card [43:35] Speaker A (unidentified): of the deck that's already been said but instead of climate action committee york sewer district would be a great utility because they line they're talking bigger pipes but they line it's the same company that would probably do it they can give you their lowest bidder i'm sure yeah two or three lowest bidders that they've got on a recent project to steer you guys to the right people so i feel that the sewer district is more than willing to help on these kind of things so your district's always helpful for us considering it's a government unit to government unit hopefully they'd might not maybe they might not consult for a private company but yeah [44:11] Speaker E (unidentified): wonderful and finally the last piece of coastal ridge you can look at some of the pictures the trim around windows the islands and the i guess not islands the stanchions on either side of the doors coming in all that trim is starting to rot away it is just absolutely falling apart up there the siding up along the gym if you look up there it's it's really starting to separate and pull away nothing appears to be leaking right now but it's a matter of time the more that moves around on you and it's you could probably tell me Wayne that building opened in 93 so I mean that's original siding to my knowledge I don't think we've ever replaced any of that siding up there so again at the end of its useful life any questions on coastal ridge more on to the middle school the first items in there is the oven our food service people do a great job and from here on out you'll notice there's a lot of food service items those two larger schools could use some help the high school in particular right now we're talking about the middle school so that combination oven that's a single oven there she'd like to replace that with a combination oven it's a double oven essentially so it'd be it'd be like you'd be replacing that with two so [46:16] Speaker I (unidentified): you don't have to heat the whole unit if you only need one rack is the idea [46:20] Speaker E (unidentified): and same this you know i could almost hit repeat on this the door frames the doors the being so close to the salt water that they rot out fairly quickly these door frames are in rough shape yeah in my previous life just working at the high school boy they it's unbelievable how fast things were anything metal rots out so fast we actually had one year we had the bell from the exterior fire alarm just fall right off the building we went out and looked at it and it had rusted it was luckily it was a cheap fix it was hardware but where does that happen you know we're fortunate to be this close to the ocean and unfortunate to be this close to the ocean I was just thinking [47:13] Speaker I (unidentified): about Peters suggestion around or Courtney suggestion around consolidating warrant article questions I think one thing that would be useful when you are presenting the school consolidation is some sort of schedule that says we expect doors need to be replaced this often we expect roof to be repaired x often because when we're only maintaining two buildings that changes significantly our your r m line and what your capital requests are and to marla's point you know the how many doors need to be replaced is this two doors is this eight doors like how many doors are next and making sure that we have that we're planning ahead which it sounds like you're doing a great job of okay next year is the other doors and the following year is the compressor on the roof and the you know just so that we have some idea of what that forecast might look like for the for the two consolidated schools and being able to push some of those things into one article for capital i think is the voters would be very appreciative of rather than saying do you want to replace the west side door of the middle school and question two do you want to replace the front door at the high school right so where we can consolidate i [48:31] Speaker E (unidentified): think it'd be helpful and we'd probably have to get creative writing warren articles but if you think that's totally doable that would make a lot of sense to me well this isn't the [48:43] Speaker D (unidentified): first time we talked about that right yeah we brought this up a couple years ago which makes a lot of sense, but I think we get to the point where it's time to vote and we do kind of zero in on the vote question on the article just so it's clear to the people. [48:57] Speaker J (unidentified): Then it becomes all or nothing. And then the Warren article dollar amount becomes really big. And so there's sort of some psychological, yeah. [49:08] Speaker E (unidentified): Yeah, there's lots of moving parts for sure. The brick at the middle school, Cool. It's in need of some attention. Some of the masonry is chipping away. Some of the brick needs to be repointed. This is one of those expenses that the quicker you do it, the more often you do it, the less it becomes a huge expense. I wouldn't say that the building is in terrible shape, but there are some areas that definitely need some work. [49:42] Speaker J (unidentified): are these items that if a renovation of the middle school is included in a reorganization plan could be folded in absolutely that's why we wrote it this [49:57] Speaker D (unidentified): way just because if it can't happen now it can happen during the could do's yes [50:04] Speaker E (unidentified): Yes, and regardless of what happens, it needs to be done anyhow, like obviously looking at the high school and the middle school, we're much more confident in the plan moving forward because in no scenario are we looking at abandoning either one of those sites. [50:20] Speaker J (unidentified): I guess I'm thinking about the concept of having a repair person come twice, right? If somebody's coming to do work on the middle school as part of your consolidation plan, and then this is sort of a one-off it's is it the same vendor coming twice [50:38] Speaker E (unidentified): or I don't think so because even in a consolidation plan if we got this done I don't think we'd have to repoint masonry in any kind of reconsolidation scenario we're not adding on to the middle school that wouldn't be part of a [50:54] Speaker I (unidentified): of a middle school budget well I don't think they were talking about exterior changes yeah it's just interior for the school consolidation and so the [51:04] Speaker J (unidentified): consolidation renovation plan well then wouldn't include any exterior correct some because sometimes it's like well if we're gonna do work there we might as [51:14] Speaker E (unidentified): well do yeah these two are definitely separate okay pieces and this one goes along with that Cox and sealants when you when you go around the outside exterior of any building it's if it's done right you don't notice them but there's expansion joints there's you know areas especially in a brick building that you know if water gets behind them you got to make sure you got holes that are draining properly and it's it's just a maintenance item and it's one of those things you don't necessarily notice it when you're driving by the building but when you get up and like i said saturday i walked completely around that building and was just looking at those things and it's amazing when you zero in on one item what you start seeing so yeah it would it would definitely behoove us and it would it would help the overall life and in the quality of the building to go around and start replacing some of the caulking that's drying out falling out you know and sealing your building up exterior lighting at the middle school again goes right back to where we are on the coast you can see some of the bases of these lights if you look at the pictures there the bases are rusting out on us I know a few years ago at the middle school we had one of them in a storm tipped over and I don't think we're you know in looking at them everything feels pretty solid but you can see just that is just a cover on the bottom but when you start looking at those again it would behoove us to start replacing those before they ever get anywhere close to coming down on their own not an exciting maintenance item but and 30 000 would [53:00] Speaker K (unidentified): accomplish what how many out of how many lights i think we would be able to replace all the exterior [53:05] Speaker J (unidentified): poles oh good yeah and i have a question for you about that do you stress test these i mean having raised children [53:18] Speaker E (unidentified): so we had our school electrician come over and look at him and we looked at him in conjunction with our staff and you know you go down there and you got a hammer and we just you know to actually stress test them with a weight load no but common sense is it is it you know can you put your fingers through it is it leaking is it you know we feel they're safe at the moment but there's a boatload of surface rust that you know we can look at treating but it's it's a maintenance problem it's it's just something we need to do periodically you're not [53:52] Speaker C (unidentified): and just fitting replacing the lights themselves yes we would we would start looking at replacing [53:58] Speaker E (unidentified): some of those some of those heads aren't as old as the poles the heads have been replaced more recently so we would have to almost go case by case and look and see what needs to be replaced [54:08] Speaker C (unidentified): and what doesn't and just a reminder there is a dark our dark sky ordinance in the zoning that you'd make sure there's no yeah our electricians well aware yeah up lighting i feel like again [54:21] Speaker E (unidentified): in my former life at the high school i constantly had a ongoing banter with our electrician i want more light i want the place flooded and he was like no you're i don't want your neighbors coming after me so yeah he's like i gotta do work in town so all right moving on to the stage actually it's the whole gym project really that the middle school gym what they would like to do is make that a black stage paint the whole thing black sand it down so they can use that for their performances the interior the gym and the ceiling of the gym all needs to be painted hasn't been painted in quite some time the roof in there is a tectum material it's like shredded wheat and i think what ends up happening is it ends up acting as a filter so in the picture where you're looking at that air vent that vent's blowing it out and it's blowing air out and you know the more the dust moves the more that shredded wheat acts as a giant filter and we've gone up there and blown it all out and cleaned it up and it's you know but the whole area is in need of a good painting it is it is gross looking it's unfortunately it's it's not I don't even want to say the four-letter word, but it is definitely dirty. [55:49] Speaker D (unidentified): That's what I was thinking. Yeah. I don't want to say it. Please tell me it's not the M word. It looks like it, but yes. It's not. [55:53] Speaker E (unidentified): Yeah. It's dusty as all get out. [55:56] Speaker A (unidentified): So is that roof material, not to say any other four-letter words, but that roof material is not a hazardous substance as it is? [56:03] Speaker E (unidentified): We do not believe so. [56:06] Speaker G (unidentified): I think it's important too with this space. This is a space we share so much with Park and Rec. The public in general- I'm looking at Courtney as I think about basketball games on Saturdays, we've sat in underneath that. Yeah. Ceiling. We're having an allergy attack. [56:20] Speaker H (unidentified): Yeah, exactly. It is true, I mean, and it's used year round. [56:24] Speaker G (unidentified): Yeah, summer camps, everything. Yeah, it's. Yep. [56:29] Speaker E (unidentified): It is an eyesore to be sure. Moving on to pavement. I wish I could have got you pictures of pavement that was crumbling, unfortunately. There is no pavement up there that's crumbling. it's in decent shape but it is in need of an overlayment knowing that it's in that good of shape and this I mean to be straight up that's only gonna do about half your parking lot because that building is used so often we wanted to do it over the course of two years and be able to use it while it was getting paved and not have to close down any summer programs or anything but as can see through the pictures you know it's it's got some cracking it's got some growth coming up through some of the cracking it would really behoove us to put an overlayment over that and preserve a decent parking lot and not have to go in and ground that up you know and the longer we wait the more it's going to cost this kind of thing the heating loops the middle school was built and renovated without a lot of shutoffs so anytime Dave Morris and his crew have to shut down an area to do any kind of heating repair we have to drain the entire building and obviously we can't always we can't do that in midwinter you know that's dangerous in itself so what we'd like to do is take those heating to be able to isolate them and it's putting in a series of shut off valves again it's not anything that the public's going to see and they're going to love it but man it's not a matter of if something breaks it's when we know something was going to break eventually and at some point we could potentially be missing school because we got to shut down and drain our heating system in god forbid january or february how does this tie [58:35] Speaker J (unidentified): into the three million dollar HVAC project that was not at all approved not foreseen when that one was designed inspect and the HVAC is primarily air [58:47] Speaker E (unidentified): and that's a great question great question like the HVAC is primarily air conditioning and this is heating and it's the forced hot water heating system so that the two systems work totally independently of each other that answer your question unfortunately yes okay I know I 'm disappointed in it too I'd love to be able to put that kind of money somewhere else in the building when it feels like you're going back and fixing a problem that probably never should have been built that way but that's where we are flooring upgrades we traditionally build flooring into our operating budget there are big sections of the middle school that over the years have just fallen behind that we would like to get caught up on and redo they're looking at doing 13 different areas and I feel terrible Dave Morris provided me with some incredible pictures and I didn't want to overload you guys with the 600 pictures that he gave me but I took a couple I tried to get a tile and a and a carpeted area [1:00:02] Speaker J (unidentified): it's it's just stuff that was the high school you have a repair and upgrade program where you do a certain number of classrooms every year same at the middle school is this in addition to that or is this the annual in addition to that [1:00:15] Speaker E (unidentified): because we try to do it and keep it out of our capital plan we try to do it in our operating budget so the middle school has just fallen behind there's so many spaces up there that they haven't been able to do that they wanted to put it in the capital plan and do a chunk of the school it's roughly a third and would talk about [1:00:34] Speaker H (unidentified): and would these floors then be kind of part of or leading into the renovation for school reorganization and consolidation i'm assuming that we're not planning to do any work that [1:00:45] Speaker K (unidentified): would need to have to rip any of them be redone yeah yep okay so the sort of the cycle that [1:00:52] Speaker J (unidentified): you're on you're not keeping up i'm thinking about like the middle school fell behind Is it, will this be sort of a full catch up and you would be able to? [1:01:03] Speaker E (unidentified): Be able to go back on a cycle of trying to do, you know, a few floors a year and keep [1:01:09] Speaker J (unidentified): it- Yeah, how much is in the operating budget for floor replacement every year, do you know? [1:01:14] Speaker E (unidentified): We try to, our level is $25,000 for cap. So usually we try, we keep it under that and depending on what areas we're doing and what square footage in my previous life at the high school that usually meant i could do three classrooms in one office that's usually what my square footage ended up being if my need was more classrooms i started hunting for a classroom they needed so this is sort of an additional three to [1:01:41] Speaker K (unidentified): four times your annual budget this proposal at the middle school yes yep they've fallen behind for sure are [1:01:52] Speaker C (unidentified): you done with asbestos flooring is that all out of this yeah it's out of the system now [1:01:57] Speaker E (unidentified): yeah well [1:02:02] Speaker A (unidentified): that's not i mean it's not an insignificant threat and there are places around that still encapsulate the asbestos flooring and insulation so when you say are we done with it like [1:02:16] Speaker E (unidentified): we have some asbestos in the buildings not the flooring the high school i know some of the asbestos we have is the glue that holds some of the tile together so until you disturb it 's not as exactly and none of these areas none of these areas have asbestos yep that's that's okay [1:02:40] Speaker A (unidentified): i mean as long as you know the maintenance plan and what needs to be done for safety yeah yep [1:02:44] Speaker E (unidentified): Yep, absolutely, and again, roof maintenance, we're finding the roofs are, yearly maintenance is coming in over our limit for operational budget versus capital plan, so we thought we had to move roofing into our capital plan. That sums up the middle school. Are there any more questions around the middle school? Thank you guys for putting up with a rather long presentation, but first off at the high school is the kitchen project I'll talk about it as a whole group the kitchen we've got broke down into several sub areas but the pictures you can kind of follow along as we go our serving line at the cafeteria was how to be kind it's really not conducive to putting a lot of students together through it quickly it was designed almost 50 years ago and it was an open concept cafe style that looked good on paper and looked good to an architect in 1978 and it does not fit schools today our kitchen line when we go to start amanda could speak to this it probably takes 15 16 17 minutes for our kids to get into the line and get their lunch and get seated it takes a while we could definitely make it way more ergonomic for our kids and for the staff being in that kitchen and watching them prepare meals and how they do it, 's excellent space. It's good sized. It's not laid out in a very good way. They spend a lot of time walking back and forth to things. And I didn't realize until we visited other schools and saw how modern schools, their layouts were so much better. The walk-in freezer and refrigerator are original. we did replace the condenser a year ago unfortunately the freezer and the walk-in fridge are so old we're having trouble finding parts for them it's frozen and thawed so many times we're worried about that m word again that i don't want to mention but it's it's definitely time for those walk-ins to be replaced at the end of their useful life what that staff does with the implements they have in place we had two kettle boilers three steamers and we still have the electric skillet we had to remove all the equipment we couldn't get parts for it and it was just it was hindering like their movement half the equipment didn't work it was in their way so we removed it on our own just to get it out of their way I hate I can't imagine what that staff would do if we gave them proper equipment Whitney and her staff over there do an amazing job our lunch program is great but it is definitely in need of a full reboot and we're actually looking at ways to expand our space in our cafeteria without changing the footprint so [1:06:31] Speaker H (unidentified): go ahead go ahead i was curious to that point right i think a lot of the conversation was around how to make this more efficient in addition to the upgrades that you mentioned and the safety but to make it more efficient so that we could i think move more kids through the lunch program if that's right so that we could increase the capacity effectively in addition, it sounds like, to some seating. So do we have any, I guess, numbers or data around what these upgrades would provide us in terms of the capacity increases so that it could accommodate, I think, the move in for eighth and seventh, if that's the longer term strategy? [1:07:18] Speaker D (unidentified): I don't know. I mean, I've never seen schools have that. I mean, I'm sure with a larger serving area and a variety of food that's laid out, you could probably put at least 75 to 100 more kids through there quicker than you know additional kids than we got now but that's it's a great question I mean [1:07:36] Speaker A (unidentified): we talked Tim about the queuing I think is kind of what you're getting to yeah the speed of the turn right that's an average lunch break 30 minutes and if 10 of that standing in line right kids are sitting down at minute 18 and I know [1:07:53] Speaker E (unidentified): it's tomorrow but again with an eye towards consolidation it's not just about increasing square footage right you wouldn't necessarily have your seventh grader having lunch with a senior in high school anyway so it would be scheduled as well yeah and even with the same space with a more efficient system you could service more people in the same amount of time yeah with a [1:08:17] Speaker A (unidentified): shorter lunch period yeah I think that 's I mean I think you're you're just getting to that by showing this picture that all the kids have to go through this serving capacity as opposed to if you had twice as much square footage option Tim was talking to me yesterday about options where you provide different meal options and kids aren't always aren't gonna stand all in line for the same station they might go to two different stations and less queuing [1:08:42] Speaker E (unidentified): time yes somebody that just is gonna do a grab-and-go you know some sort of little if they just want an apple and milk yeah they're not gonna stand in [1:08:49] Speaker K (unidentified): that line waiting for everyone so absolutely so this is just the cafeteria in the serving [1:08:55] Speaker J (unidentified): line it's not the seating area just to clarify that for everyone and then so the total for all six of these items is two and a half million which on average one would say is 600 000 per item and i know it doesn't break out that way but i am curious are there high ticket items and low ticket items in this list of six for example how much does a walk-in freezer fridge and are we talking one or two how much does the oven cost do you have a breakdown within the two and a [1:09:28] Speaker E (unidentified): half we have it we got the overall numbers from our architectural firm when we wanted to redo this a few years ago yeah we broke it all down we broke this out from one of the Harriman proposals. [1:09:45] Speaker D (unidentified): But the 2.5, we just received it three weeks ago? [1:09:50] Speaker A (unidentified): Yeah. So it's essentially a reduced scope of the previous kind of design. Correct. [1:09:56] Speaker J (unidentified): So if the electrical panels are 50 to 100, then there's gotta be a lot more in some of these other elements. I'm just making up a number. I think you figured out that we're all pretty anal around here, right? [1:10:11] Speaker I (unidentified): so not at all i mean if you look at the other items in the cap plan it's a great question like the walk-in freezer at village and the walk-in refridge that's a hundred thousand dollars right there fifty thousand dollars for the oven replacement at the middle school assuming those are probably a different capacity much different yeah much the walk-in at the high schools are [1:10:35] Speaker E (unidentified): probably three times the size of the ones at the elementary school at least yeah so do you have a [1:10:40] Speaker I (unidentified): an architectural mock-up of what the idea would look like? [1:10:45] Speaker E (unidentified): I actually have, Whitney provided me with conceptual pictures. I didn't wanna put anything in the packet as far as the conceptual, because the minute I put a conceptual in there three years down the road, the concept isn't exactly what's there. We didn't want people to be disappointed [1:11:02] Speaker K (unidentified): or say, you said we were doing this, you know? [1:11:06] Speaker I (unidentified): I think it might help to pass it around in the school consolidation meeting I think one thing that comes to mind for me is knowing that we're under enrolled at the high school and at under enrollment we have at least based on what the school was built for in 1976 right then we inefficient processing line for the low number that we have now right and considering the changes that have happened right we pay or the state pays for kids to have lunch and so likely there has been a drastic I don't know what the numbers are change in the patterns of how many kids are getting hot lunch in 1976 versus how many kids are getting hot lunch in 2026 especially knowing that the funding model has changed you know everything about society is there's there no more stay-at-home moms in you know in 2026 so i think it's it is important to point out what some of those trends are data-wise that have changed that could support helping to understand because at first i was like yeah i made it through the cafeteria it was fine but i do a higher [1:12:16] Speaker J (unidentified): percentage of kids using the cafeteria is that what you're is that what you're pausing no yeah [1:12:21] Speaker I (unidentified): significantly higher most likely so and they're serving brown bags yes right more grab and go exactly yeah and they're serving breakfast right which they have a [1:12:30] Speaker H (unidentified): award-winning lunch program which also then in a great way right it drives up [1:12:34] Speaker B (unidentified): usage and no more square pizza so last spring it seems a similar Warren article for kitchen serving line renovation cafeteria renovation was six point two to 6.3 million. What's the difference between these two? [1:12:57] Speaker D (unidentified): Cafeteria is not gonna be touched. That's where they sit and eat. [1:13:01] Speaker B (unidentified): Are you never gonna touch that? [1:13:04] Speaker D (unidentified): After what we kind of looked at last year? Include the gym. No,, no. [1:13:09] Speaker B (unidentified): That was just the cafeteria. [1:13:11] Speaker H (unidentified): That was a full remodel of the seat area. [1:13:12] Speaker D (unidentified): There was an upgrade of that a few years back. You probably know that better than I do. [1:13:17] Speaker E (unidentified): Yeah, it's longer than I care to admit, [1:13:19] Speaker D (unidentified): but it was 12, 14 years ago [1:13:21] Speaker A (unidentified): we redid the actual cafeteria itself so that's that was a bigger area footprint than this much [1:13:29] Speaker D (unidentified): bigger area that was lighting tiles everything off the plate that's off the plate yeah for the foreseeable future right okay yeah i mean robert we may need to put some tables upgrade tables but it's not like tearing out light fixtures and you know we weren't really fans of the trophy case should be at the office, but that's all gonna stay, so. [1:13:54] Speaker I (unidentified): Wasn't that six million also with a double serving line? Yes. Where there was a separate calf area for the younger kids? [1:14:02] Speaker B (unidentified): Serving line is a separate area, yeah. But that's what I'm saying, [1:14:05] Speaker I (unidentified): the six million dollars included two serving lines with additional seating area for kids. This one does not. so that's the four million dollar Delta is one less serving line and less seating area fewer upgrades it's a big number for that mm-hmm [1:14:29] Speaker A (unidentified): I think that's part of the whole process here is getting in front of questions that we're all gonna hear from voters at some point yeah I think it was expanding the [1:14:36] Speaker H (unidentified): footprint to was right taking over like that what it was a significant change I [1:14:42] Speaker K (unidentified): I think in that cafeteria space. [1:14:43] Speaker J (unidentified): Bump it into the lobby area. [1:14:45] Speaker H (unidentified): Yeah, there was a whole redesign, so. [1:14:50] Speaker E (unidentified): I didn't talk about the electrical panels. It says FPE. Those are, the electrical panels at the high school are actually Federal Pacific panels, which. Oh, I remember. Usually as soon as I say Federal Pacific, people go, ah. yeah they the residential ones were far worse than the commercial ones but federal pacific has since gone out of business they couldn't really survive all of their panels got recalled they were fire hazards and they're all through the high school so again we have the commercial ones which aren't as troublesome as the residentials but any chance we get to replace place, federal specific panels, I want to jump on it. [1:15:48] Speaker I (unidentified): So why is there no price on this one? Say again? Included in the two and a half. It's included in the two and a half? [1:15:54] Speaker E (unidentified): Yeah, it's part of that. [1:15:56] Speaker J (unidentified): And these are just the ones in the cafeteria area, kitchen cafeteria, but you've got them elsewhere in the school? [1:16:02] Speaker E (unidentified): We do have them elsewhere in the school. It's irresponsible to go in and renovate an area and not change those out while you're in the area. you know moving on to art room and this i know again it's tomorrow but this would definitely affect consolidation our art rooms all right let's face it i'm old our art room started out as one art room and in my tenure there we put a hallway right down the middle and we've made two small, long, thin art rooms. They're not conducive to what we're trying to do in there. They're teaching in essentially an oversized hallway. We have things in there like jewelry making, and we've tried to make it work in the space, but the vent that's in there that pulls the fumes out was made by a contractor who was incredibly talented, but it was a backyard mechanical fix we need to put some money into upgrading our teaching spaces and again once I traveled to other schools and looked around at what other schools have wow we're really putting our kids at a disadvantage so fixing those art rooms and being more creative with the building space would definitely enhance the experience our kids are having I know our teachers would be much appreciative. They've done amazing with the spaces they have, but they need to be upgraded for sure. And these are also numbers we got from Harriman. [1:17:52] Speaker J (unidentified): Can you remind me the dollar amounts for the family consumer science and the science rooms? Particularly family consumer science. [1:18:01] Speaker E (unidentified): When we did them originally or what they came in at? The most recent. [1:18:05] Speaker D (unidentified): yeah it was 395 i think 395 for family consumers 395 yeah 395 000 the bids came in anywhere from 5 to 800 000 but neil did a really good job i mean that's that's kind of where i'm [1:18:22] Speaker J (unidentified): trying to calibrate three rooms as opposed to the sort of one and a half correct yeah i remember that one had all the appliances yeah because we talked about and your science rooms were 3.6 [1:18:33] Speaker D (unidentified): 6.6 yeah so thanks for that reminder so it's a kind of a there were seven of them this is two art rooms this is three art rooms and yeah three art rooms three robotics is [1:18:50] Speaker E (unidentified): currently housed in one third of the old wood shop and it's it's a big cube and again what we do in that room is amazing, but that's a direct reflection of the teacher in that room, not the space we provide him. Storage is inadequate, electrical systems are inadequate. He's got a heater hanging over his room that was originally installed that heated the entire shop, which was three times longer. I'm pretty sure that heater, it could heat an aircraft hanger. It's huge, it's way oversized. it's really loud the worst part about that space in the space next door you can't turn that heater [1:19:35] Speaker K (unidentified): on and teach class it's just so loud so loud and robotics is now part of the curriculum not a [1:19:42] Speaker F (unidentified): after school both thing both yes it is part of our computer science curriculum -huh how about at the middle school out of curiosity it is we do have some computer science curriculum grab the [1:19:54] Speaker A (unidentified): the mic and pull it towards you that way it's better coverage yeah we do have computer science [1:19:58] Speaker F (unidentified): curriculum at the middle school but we also have the robotics club team that is housed at yms so that's kind of we have two parts of robotics one is our club and after school team and then the other one is our computer science program curriculum wise that we have that's the same at the high school the high school has a it's a bigger curriculum that goes from python programming computer science drones robotics so there's some parts of the renovation for the robotics room that's a clean and a messy side of robotics and computer science and so but they are, we have two programs basically from YMS to YHS. [1:20:43] Speaker J (unidentified): And so this project is for the element of computer science that is robotics. You've got other computer science sort of sub. [1:20:55] Speaker I (unidentified): Doesn't he teach all his classes in this room? He will be, yes. Okay, so I think you need to rename this then. [1:21:01] Speaker J (unidentified): It's more than robotics it's sounding like. Yeah, sure. Which is a good thing from an investment taxpayer, right? [1:21:09] Speaker F (unidentified): is this really computer science it can be stem so we can we can rename that into the science technology engineering whatever you do there right it sounds like you do more than robotics [1:21:20] Speaker I (unidentified): yeah which is a great thing yeah i think the right label will make a big difference [1:21:24] Speaker J (unidentified): because i think people think about robotics as the after-school club i guess is where i'm coming yeah kind of where my mind's going i understand that yeah computer science [1:21:33] Speaker I (unidentified): is the subject you're learning in school so i think that would be helpful although i don't [1:21:39] Speaker F (unidentified): see a lot of screens or well that also will be renovated we'll have the screens because there are some computers that they have to use for the programs that are not the Chromebooks and so right now the clean side of computer science meaning not getting out tools and glue and all of those elements is in a different classroom and so we have to move out of that classroom into the classroom that's there so we can renovate the art rooms so there's some shuffling and so the picture that's there of the com of the current robotics room will be renovated to have also a computer bank in the back of it or i don't know exactly where in the room they'll have it well yeah be [1:22:28] Speaker J (unidentified): accurate with what it is but if and if it's robotics this robotics but if it's more than that i think that would be that would be helpful well yeah point taken yes for sure absolutely i think of robotics is needing a lot of floor space i remember going into the gym and [1:22:44] Speaker K (unidentified): to one of their competitions and which is coming up in a couple weeks [1:22:50] Speaker E (unidentified): moving on the yca control room band and chorus cooling you're gonna look at me and say why does your community auditorium control room need cooling it's already cooled and to some degree that is true the York Community Auditorium is air-conditioned the problem we encountered is it's air-conditioned at the same the control rooms air-conditioned at the same rate as the auditorium itself we added a bunch of equipment in there that generates heat so when you turn your set your air conditioning in the auditorium at one level it is 10 to 15 degrees cooler and warmer in the control room because it's generating heat all the time and what we noticed is in times when we don't have to turn the cooling on in the auditorium itself we definitely need it in the control room electronics don't like heat so you got it you got to tend to keep them cool and we're just basically trying to protect our investment in that control room you can see some of the pictures of the components in there that all generate heat so we proposed putting a mini split in the control room to help to that end and same than band and chorus when we built the band and chorus area we had to value engineer some cooling out of it and unfortunately when we did that we didn't allow for windows to open and all the windows down there 's a big bank of windows in there 's a tremendous amount of solar gain and what we've discovered in years past we used to block open the door and it provided fresh air we can't really do that in schools anymore so I think we can with some mini splits make things much more comfortable down there we can we can put film on it but it still wouldn't provide any kind of cooling and it's it's it's warm down there without being able i just if the heat's coming from the wind yes yeah no it would it would be helpful but it wouldn't solve the problem okay so next [1:24:59] Speaker D (unidentified): monday the 9th at three o'clock if you're interested once again we will walk you through these areas at the high school if you'd like to see them so three o'clock monday november 9th it will be a right on time start because we have to negotiate at four o'clock so we've got about an hour to show you these areas. [1:25:20] Speaker F (unidentified): Robert, we can get an updated picture of you in the computer science room for the newspaper. [1:25:25] Speaker G (unidentified): So that the newspaper sucks. [1:25:28] Speaker J (unidentified): I think I'm all hunched over by you, which I know I am. [1:25:32] Speaker D (unidentified): People have been through these areas last year, Robert. I remember you were here. [1:25:36] Speaker B (unidentified): I was on the building committee for the amendment. [1:25:39] Speaker E (unidentified): Nice. And it's a wonderful space. I don't mean to animate that it's not wonderful. It's just it was what it was. the numbers came in they came in high we had to we had to make a decision with [1:25:50] Speaker J (unidentified): respect to the YCA control room heat issue are you having to keep the auditorium itself cooler than you otherwise would because you've got to [1:25:58] Speaker K (unidentified): keep the it's a it's a fine balance right because I'm thinking right [1:26:06] Speaker J (unidentified): theoretically you're gonna save some amount of heat or cooling costs in a big [1:26:13] Speaker E (unidentified): empty auditorium. Correct. There could be times we don't need to air condition the auditorium at all but we do need to keep those components cooler. Right. Very good [1:26:24] Speaker F (unidentified): point. An assembly in there in February is not super comfortable because we have to have it at a certain temperature. Not comfortable in the control room? No, not comfortable in the auditorium because you have to keep it cooler for the [1:26:36] Speaker E (unidentified): the control room the next item we got a wall repairs painting and trim there's there's areas in the building that are think more than one story areas that are one story our maintenance staff takes care of and they do a great job but areas that you know go up 20 feet that have settled over the years and you start developing cracks in drywall, and it's just normal maintenance. And we got painting in areas that, you don't wanna put any of your staff on a ladder much more than six feet safely. And just some maintenance items that, YCA hallway, for example, back wall of the gym needs to be repainted. There's just areas that we need to maintain that it would make much more sense to contract out a lift or scaffolding or yes correct sidewalk along Weber Road we were asked to do that as part of the turf program we've made a commitment to putting a sidewalk in up there we would again it's in our five-year plan when we get there next week but we would also like to put a sidewalk heading out to long sands road roofing systems you'll see that again in all the buildings the baseball and softball field upgrade our baseball field hasn't been completely redone since tim do you have a it's it's been years 10 12 i think we told me yeah, Nick Hanlon spoke to us about that. The lips around the edge of the turf all the way around the infield are coming up. They're turning into a bit of a safety hazard. It's time to do to that field what we just did recently up to Village Elementary. And if anybody gets a chance to go up to Village Elementary and look at that field, boy, it came out wonderful. [1:28:50] Speaker D (unidentified): Village Elementary field softball, baseball was an outstanding cooperative effort between the town and the schools commend Peter Murray for his leadership did a great job they had an outside firm to come in and helped him also but I commend Peter Joseph for allowing us to take out at this summer or late summer instead of next year because now the kids will be able to play on the field of spring it is beautiful and we you know I think it's was needed but it's the cooperative effort that really that's how it should work it was great thank you so same deal here if you [1:29:27] Speaker A (unidentified): and Pete there I think that you know that there's good outside specialist or any of our staff that needs to help with that just let us know absolutely that [1:29:35] Speaker E (unidentified): appreciated and finally walkways up at the track there isn't direct handicapped access up at the track to the bathrooms there is access unfortunately if you're handicapped you want to get to the bathrooms from the parking area you need to go completely around the field onto the visitors side we could solve that with a walkway that goes in behind the bleachers and it would be a more direct route the other item we looked at is one side of those bleachers are ramped we looked at ramping the other side of the bleachers. Unfortunately, there's a light pole in the way, so it really didn't make a lot of sense. So we were looking at putting that walkway in and improving handicapped access to the bathrooms. [1:30:32] Speaker C (unidentified): I'm sorry. [1:30:33] Speaker F (unidentified): This came up in the build, and the part that's unfortunate is that we are ADA compliant. It's just not the best that we want for our fans. ADA friendly. Correct. and so I think that's where it is exactly and so really needing to upgrade that walkway should have happened a year ago but we were we were compliant and now it's just yeah like you said [1:30:58] Speaker J (unidentified): not friendly so what are these pictures of because they do show up what looks like a [1:31:02] Speaker E (unidentified): wheelchair ramp so that's the ramp on one side of the bleachers that you could get up into the bleachers from the parking lot and if we could do that on the other side the other side is closer [1:31:12] Speaker K (unidentified): closer to the restroom the bathrooms are on the far side of that so if you could come down and go around the back right way right there it'd be a direct route instead of having to go [1:31:24] Speaker A (unidentified): completely around the field so if you're in the stands and you need the ramp to get into the stands and out of the stands you've got to go all the way around and the bathroom is close by so you would like to go yeah you are 100 feet from the bathroom on the spectators in the stand that need the ramp can go around behind the bleachers and hit the bathroom as opposed to going 400 yards around the outside of the correct their trip would be a quarter of what it is now perfect it's a no-brainer and we missed it of arm injuries yeah we missed it not quite mobility [1:31:59] Speaker D (unidentified): impaired right now we missed that in the plants and then the hairman said that no not harriman excuse me CHA but it is handicap accessible but it's going to go all the way around [1:32:09] Speaker H (unidentified): that's not a good that's not a good answer there's a lot of foot traffic here anyway [1:32:13] Speaker E (unidentified): you've got a lot of wear you can already see yes absolutely and our final piece is windows at the superintendent's office you can see looking at those photos boy they're in rough shape yeah I went out and took some fresh pictures as well as you know some other pictures that we had it's as spongy as it looks you might need another [1:32:43] Speaker A (unidentified): layer of paint there on top of the paint I drive your finger right through those [1:32:47] Speaker J (unidentified): cells on the ballot last year and was defeated this is the same dollar amount [1:32:54] Speaker D (unidentified): out or do you anticipate what it was a year ago it's 10 000 more it was 73. to [1:33:03] Speaker I (unidentified): be as we i know we're dancing on the edge of school consolidation but unlike cress we imagine that this building would be of value to sell at some point potentially if the town chooses to do that so maintaining and changing the windows would not go to waste i don't believe so but [1:33:24] Speaker C (unidentified): and there [1:33:27] Speaker G (unidentified): was like wasps coming in through this there was wasps coming in through these windows raining on the inside of the windows so it's an issue it [1:33:40] Speaker D (unidentified): was close it was close yeah people thought we were working out but we were we're swaving this wasp so [1:33:51] Speaker E (unidentified): any questions on anything so can i just [1:33:55] Speaker B (unidentified): Some of the things that we talked about in the spring, so like one of the big projects was the changing the admin from one side of the high school to another. Is that going to go forward or we're gone? Nope. [1:34:10] Speaker F (unidentified): So this summer we moved our athletic director up into the auditorium lobby, and so we now have an administrator on that side of the building. so we were able to completely take that out of our plan and then the gym there [1:34:26] Speaker D (unidentified): was like several items to do in the gym the gym floor got completed and had to we had a specialist come in and look at the floor so that's been resanded re-varnished and repainted that's going to be good for 10 12 15 years you just took that out of [1:34:42] Speaker B (unidentified): operating out the locker rooms locker rooms are still a big deal yeah so that's still something you're going to do next year next year and the fitness rooms were also in there that's also the [1:34:55] Speaker D (unidentified): same that's going forward in another well we haven't put it in the plan yet we do know what cost of that yeah that's because it was everything under one [1:35:08] Speaker H (unidentified): there so it looks like it's an FY 29 rooms the weight room renovation is an [1:35:13] Speaker B (unidentified): FY 29 okay and then there were a lot of there was one worn out or go for like 9 million and a lot of that was electrical mechanical roofing paving so I think you're just sort of breaking it out and doing smaller pieces over time well that was a [1:35:32] Speaker A (unidentified): that was a five-year plan i think you can yeah those are shown in the five-year plan at the back there's those are shown in out years mode the majority of what was i think to get to robert's point none of that magically got better no issues no broken out into multiple years here i [1:35:48] Speaker E (unidentified): think marla brought it up earlier like you know when you when you consolidate things there's also or risk right it's an all or nothing you know maybe we can get some of the pieces [1:35:59] Speaker J (unidentified): the second wing i understand is no longer part of the plan or the extension at the high school [1:36:06] Speaker G (unidentified): it was just an option that was put on the table but i remember a lot of discussion about we can't [1:36:13] Speaker J (unidentified): have seventh graders in the same building as 12th graders they need to have their own wing they need to have their own entrance yeah that was the sixth grade here next week that was sixth grade [1:36:22] Speaker D (unidentified): and sixth grade won't be moving up to the high school so right now we're doing everything to not put an addition onto the high school because that's about 22 million of that so there is [1:36:31] Speaker A (unidentified): notorious 88 million so the five-year total for the high school on the high school plan long term is third currently on this schedule is 13 million so it's not quite the amount of what [1:36:45] Speaker B (unidentified): was what the points we were making but a lot of them are once you decide about consolidation that [1:36:49] Speaker D (unidentified): number will probably go up all right well you know we put once you talk to harem and here we'll find stuff remember that they get paid as a percentage yeah so that's a soft [1:37:03] Speaker F (unidentified): scale that's a soft cost put those in though the locker rooms certain things that we're going to talk about next week are already in this five-year plan so those numbers may change obviously there is an asterisk down the bottom that they are an estimation only but it is that does include all of our phased approaches that we've come up with as we're going to discuss tomorrow at the school committee and then next week with you so those that's in there for the middle school that's in there for village that's in there for the high school so that all of our numbers do align with plans that you've heard thank you [1:37:40] Speaker H (unidentified): i had one quick question on vehicles and i may have messed it in here but do we have a vehicle schedule we talked a lot last year about the very high mileage i know there's three in the plan which i think seems in kind of in line with what you were expecting but anyway there's two [1:37:58] Speaker D (unidentified): Two this year. Two this year? Talking earlier in the summer with transportation people, they thought that we have three vans right now. We're hoping to get through the school year. Right. But that's why we're looking to replace them. But there is a schedule. [1:38:10] Speaker H (unidentified): There is a list. With the mileage and with the replacement. [1:38:12] Speaker D (unidentified): Mileage, the date when we purchased it, yeah. Okay. All right, so it's on here. Okay. [1:38:19] Speaker A (unidentified): That informs the vehicle replacement request that you've got. you're asking for the amount that would replace what's desperately needed right now this year just I think the question sorry let me rephrase it does the amount need to be higher instead of just oh there's a lot of concern last year from the public about the condition of some of the out of district placement vehicles I think you know the mileage and so yeah good point right now we [1:38:50] Speaker D (unidentified): I think three is when we look at our replacement schedule. We don't have a lot of replacement schedules, even in our technology. We just hired a new technology director, fabulous. We had some really great summer hires this year. Two of them are sitting right here. But he was surprised that we didn't have a replacement cycle in technology, servers, machines. He's wonderful, he was in a New Hampshire school, he came here so he's working on that for the budget too so which at some point may be a big number that we might want to think about capital because it could be a bigger number so but he was surprised that we hadn't had anything like that so we break ours out probably similar size operation [1:39:33] Speaker A (unidentified): a number of locations as you have and it's in the hundreds of thousands per year for when you're talking about that so it definitely trips the capital it's good even we kind of aggregate it so we'll be talking about that in a future meeting we haven't heard from alex yet but He aggregates all of the, you know, $10,000 switches and $20,000 firewalls and everything that needs to be done and recabled into one couple hundred thousand dollar a year general request. So it can be handled differently. It can be done operating, but it's just how you want to see it and how you want to view it during the year. [1:40:08] Speaker J (unidentified): So and if you're if your consolidation plan involves vacating the central office Which I understand is where your technology hub is so to speak is that? either an opportunity or part of The consolidation budget to do some upgrades as well as moving [1:40:26] Speaker D (unidentified): I think at first it was a scary number you up to the right because the hub actually is at the middle school we run a Line down to the central office then back to the middle then out to the schools i think at first the technology group felt that was going to be very pricey i don't think it's going to be as pricey as they thought so it can be redone so middle school we did move some servers up into the library to get them out of that basement area where there was water and whatnot so it seems to be much better losing power you're losing power but we're not going yeah exactly we're not going down so it's been good can i assume that all the big software [1:41:09] Speaker C (unidentified): purchases the past and now everything's pretty well subscription now subscription and what we're [1:41:14] Speaker D (unidentified): doing currently with the new tech director is looking at all these prescriptions and if some of them double over we're going to eliminate them and get them out of the budget so yeah matt cliff clifton he's been fabulous just had a brand new baby i mean it was great to see that young family but yeah multiple subscriptions that do the same thing we're trying to get rid of that we don't need to be buying three things to do the same thing because you can get caught in that real quick with software especially in schools thank you [1:41:47] Speaker E (unidentified): you guys all you had some really great questions and great we took a lot [1:41:51] Speaker D (unidentified): of notes so next week you will have a one-page breakout of what this possible to school we call it two and a half school model to school model will look like with timelines and votes and numbers so i think you'll like that because i think the families will really like it because it gives like 29 30 we should be moving if everything goes well that's what they asked for last year too and we didn't have that so amanda first thing she did in july as she got right on that and fixed it up and put out a nice piece that can be shared so [1:42:23] Speaker I (unidentified): well and this model would also reduce the number of transitions that which is another big you know concern of families that people transition kids transition at the same potentially at the same time based on amanda's timeline or that you don't [1:42:39] Speaker A (unidentified): switch schools one year switch schools a second year and switch schools again the third year that kids adjust once or as few times as possible so yeah i think i think and i've seen a couple different variations so i won't guess as to what the one that you'll share with us that comes out of your meeting this week but they've all done a good job in my opinion of showing you know the kind of thought put into it that i know you guys have been over the year about minimizing that number of transitions and also communicating to people when certain things under different plans would close when new items would come online meaning new kind of pods for the kids and what grades would move where so i think you're on the right track i haven't seen the final draft but the previous drafts have all looked very informative to me so thank you i don't [1:43:23] Speaker D (unidentified): was it mid-july you and i met we've been meeting quite a bit this and i've used pete as a sounding board for these for these pieces hey what do you think you know your town manager parent does it make sense so thank you on and you know we tweaking as we went along but i think you'll [1:43:39] Speaker A (unidentified): appreciate it i think it's much better thanks for the neil and amanda and marie and tim thanks for the discussion today i think it's good we're it's definitely comprehensive and moving in the right direction so i'm sure we'll have lots more to throw on the table and pick apart and hear your answers to and after you know this week and next week but this is definitely a huge start for me so thank you yeah great super awesome thank you thank you thank you okay again out 10 minutes early do you 40 minutes yeah that's good 40 minutes early before noon is that okay with the other items we'll take the other items up with Okay, all right, we're adjourned at 10.