Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[0:03] Speaker A (unidentified): Mr. Chairman, this is the draft budget dated November 5th, 2026. It's very close to what we are likely to present to the Budget Committee on Monday, and I know Select Board Member Gilley will be at that meeting at 4 o'clock. We did want to meet with the board ahead of time to just give you an overview of the budget to let you know some of the things that have been worked into the current budget, what might not be in the budget and seek any guidance and input from you folks that you want to provide the current proposed budget would increase just under nine percent and we're talking about seven hundred and twenty five thousand dollars over fifty percent of that increase would be related to a recommendation that's coming out of the fire and rescue planning committee that we have the municipal firefighters on staff 24 7. so it would then provide two people at night from the 6 p.m to 6 a.m seven days a week piece and some of the figures there include not only their wage and salary but their benefits and one of the things we wanted to talk to the board about tonight was the fire and rescue planning committee is recommending that the town offer Maine State retirement to firefighters because it is a recruitment and you know an ability to recruit and then retain these folks because they may want to stay in for a long time and they won't they want to have this particular Maine State retirement program Maine State retirement added this area for firefighters only and there's a specific plan called 3c that the fire and rescue committee is recommending and that we met we the staff myself Terry and then the fire administrator Frank true we met with the woman at Maine State retirement and she provided information to show us that the employer's contribution would be like 13.2% in 2027. And she talked about how I believe you get 20 years in, and then they're able to collect like 2 thirds of the salary that they had been earning type of thing. I mean, I'm just summarizing right now. But apparently, many communities have needed to add something like this in order to get people to be interested in applying. So we feel like Harpswell needs to do it so that we're not necessarily right up there with Brunswick and Thompson, but getting closer to offering some of the benefits that they offer.
[2:50] Speaker B (unidentified): Do we know, do the surrounding towns offer this to their firefighters? So, yeah, I mean, if they offer it, we have to at least be competitive.
[2:58] Speaker C (unidentified): And the key thing about that, too, is the 20 years, it's not at one location. This moves with you. with you and so to recruit maybe somebody from another town yeah they would not come here before their 20 years are up unless they're able to carry that and have that build towards their 20 years
[3:17] Speaker A (unidentified): that's a good point too terry thank you yeah and so we had to add health insurance you know and we had to make some assumptions about you know maybe a couple of them would select family plans and maybe a couple would select single so you know budgeting is not an exact science but we do the best we can to try to make certain assumptions so you know not knowing that yeah but i mean you do the best you can you have to make certain assumptions and did we assume that they were
[3:44] Speaker B (unidentified): all going to take that state retirement but yes we put it in there as if they would yeah
[3:51] Speaker A (unidentified): if they don't they could still do the town's 457 plan yeah and but that was at least budgeted on
[3:57] Speaker D (unidentified): the high end yeah assuming everybody right i think part of the theory is some of the older guys you know, say you're 50, you're not going to do 20 years. The main state retirement is not going to help you all that much.
[4:10] Speaker A (unidentified): So they might do the 457 in that case, yeah. Somebody did ask the question today at the Fire and Rescue Planning Committee if the TAM would consider we currently match 6% of the 457, and they wondered if the TAM might go higher, given that if somebody didn't join the main state retirement program and the town would be putting in 13% for that would we consider higher and I said to Terry I think we should go back and look at the salary survey information we got because it included benefits to see if other towns were doing more than 6% and maybe you want to consider I don't I wouldn't bump it to 13 but I don't know some towns might be doing 7% or 8% I don't know we could go take a look at that if you'd like us to yeah that'd be worth looking at and then maybe that would help all employees too applying that additional increase so right now what we have in the budget is a six percent figure for that so you can see overall the operations side going up and the capital side going down primarily we weren't preparing to budget or appropriate for the recycling center project we have about 1.2 million in that fund and we've been working with an architect and we think that some of the latest information would lead us to believe that we have enough funding for that building
[5:40] Speaker D (unidentified): CHRIS JERRAM, M.D.: Wow. That's new and different. CHRIS JERRAM, M.D.: Yeah. [Speaker A (unidentified): So this-] CHRIS JERRAM, M.D.: We'll know fairly soon. We have some- Yeah.
[5:48] Speaker A (unidentified): I was going to say this draft does not contemplate money, additional money for that project. But we're still proposing to put away money for Capitol roads, emergency vehicles, boat and motor replacement, office equipment, and vehicles.
[6:04] Speaker B (unidentified): CHRIS JERRAM, M.D.: What's the other Capitol with the double asterisk? that is down below and we see the single it's just oh you're right it doesn't have the well
[6:17] Speaker A (unidentified): it's listed sorry do you see the heading other capital down below and okay yeah okay yeah sorry no we should put the Astros next to that down yeah so we that makes sense now sorry yeah
[6:33] Speaker B (unidentified): You don't have to put the asterisk. I was slow on the uptake. No, it's OK.
[6:38] Speaker A (unidentified): Special projects, we're currently proposing $15,000 for a solar consultant, $50,000 for an emergency services consultant, and up to $100,000 to move the Garrison Cove project along the town landing there to a more complete design and getting permitting so we could go out to bid. We did apply for a grant. We didn't get it. We think this would get us closer to knowing the construction cost and then hopefully there'll be a grant program that will come along
[7:09] Speaker D (unidentified): that we could Apply for I think a lot of that it wasn't just the ramp No, they were in berms around it. You're right which In my mind is frankly the waste of money because the water is gonna go right up the ramp and spread all the way around The road anyway, yeah, and the new house being built there is on stilts that's the way to go it is we can really look at that but I remember but there's
[7:38] Speaker A (unidentified): a lot of money with project garrison was going to be we can find it a lot of
[7:50] Speaker D (unidentified): wasn't the ramp you might need to go to the money yeah it was part of that
[7:59] Speaker B (unidentified): i agree it being applied for it was like a resiliency grid i think part of the concern is
[8:07] Speaker E (unidentified): and this is something we're learning i think as well we did a real initial to get approximate price to think about right however before you can start construction you're going to have to have good architectural designs plus permitting and when these grants come through you don't have time when these construction grant you don't really have time to do all of those processes to be competitive so i'm we're thinking and garrison was the first one that came up is if we get the engineering design and i'm sure there must be a case where things change over four or five years but if you have really good engineering design done you will be ready then to go out for a construction bid and I was kind of looking I was kind of looking online today because a lot of this is federal money and you have to be ready to grab at it when it comes so I'm thinking this is a good way to start getting ourselves ready and on the landings as well on some of the roads so that we're ready for construction grants when they
[9:21] Speaker D (unidentified): come out we need barney baker i
[9:24] Speaker E (unidentified): said we need barney baker well we've had barney baker on this already he started that project actually there's a drawing somewhere that's how long it's been we have them but they're but they're just they're they're they're not construction drawings
[9:39] Speaker A (unidentified): so but they did give estimated costs oh yeah and i just don't remember what that number
[9:47] Speaker E (unidentified): that was six years ago well we gave that grant Margaret was looking at we put fifty thousand in as I recall should be ten percent of the total I think it was
[10:02] Speaker C (unidentified): around five hundred thousand it had come down a little bit for some reason yeah
[10:08] Speaker D (unidentified): but my thinking it should be any different than the Maricopa boat launch
[10:14] Speaker C (unidentified): Well, there's sand dunes there apparently that they're You have to do sand dune restoration or something, which is I didn't I didn't quite get that either
[10:25] Speaker D (unidentified): That beaches that beach never moves Yeah, because we don't even use the ramp half the time the ramps being used The beaches is sturdy enough and compact enough that you can launch your boat or any you know any way you want there
[10:40] Speaker A (unidentified): so we kept hearing that the town should be in a position to be ready for construction funding.
[10:47] Speaker E (unidentified): And that we can't really get there without,
[10:50] Speaker A (unidentified): but if you don't think this is an important item, we, it's, you know.
[10:56] Speaker D (unidentified): How much was the Bailey-Allen ramp, do you remember? Mackerel Cove? Like, yeah, like 150? Mackerel Cove was.
[11:02] Speaker C (unidentified): Oh, you're testing me. Oh, man.
[11:06] Speaker D (unidentified): We don't have to deal with it right now. Yeah.
[11:08] Speaker A (unidentified): No, but I think it is one of those questions we have about how far do we want to go with this project at this time how much money do
[11:15] Speaker B (unidentified): we want to put in locally well then once if we use that money to get the set engineering down that engineering is only good for a set amount of time before it becomes what that's true so we could spend the money getting engineered still don't get the grant potentially and then after we do it again in five or six years or maybe who did macro go was it barney no will haskell well will
[11:43] Speaker E (unidentified): did mackerel the other thing and i have a question also to your point i wonder how much is just i hear what you're saying but i'm trying to figure out for us to be thinking forward on all the roads. How much of it is just going to, once you have the construction design and done, how much you can't just add overhead and inflation? Because does the design itself change? I don't know.
[12:20] Speaker C (unidentified): I think Margaret was saying, and the reason why it's been a decision between garrison and lookout point, And I think as the R&S went through these different projects, was hearing from the public that it was a priority for another area of town, and that's why Garris, and I just texted Margaret to see if she could come down, but was hearing that, you know, we've done several projects on 123, and it's really time to make a good, strong, sturdy, accessible ramp.
[13:02] Speaker D (unidentified): garrison it's heavily used it's very heavily used yeah but look out was the
[13:09] Speaker C (unidentified): next one that she has on her on the horizon those are the two that we looked
[13:14] Speaker E (unidentified): at just because of I mean we looked at look out point before Mitchell field was
[13:19] Speaker C (unidentified): finished yeah we did pots back right and look out is heavily used too and they're both in fit so is the ramp itself at Garrison not in poor condition I thought
[13:30] Speaker D (unidentified): it was it is but it's stable there's a barge comes in all the time and he keeps it in gear to keep it on the beach it washes away every time he uses it in a week later it all comes back problem there though is the flooding right
[13:48] Speaker C (unidentified): that's the big problem yeah stop that well are we hearing that 's not a priority then what's that the 100,000 up to 100,000 for garrison no I think it is
[14:02] Speaker D (unidentified): important I don't know if we have to the extent of that last engineering study with all the berms and everything along there so we'll make you have to stop
[14:11] Speaker B (unidentified): flooding even with the berm I don't think we I don't think we'll necessarily need the full $100,000 to come up with a design for just a simple ramp.
[14:26] Speaker E (unidentified): Excuse me if I might just add one more thing. Many times when you're going for the
[14:31] Speaker B (unidentified): grant, they're looking for something particular. Right. That's why the berms were there originally.
[14:37] Speaker E (unidentified): Yes. Or they might be. I think you probably found this on some of the—anyhow. so they might be looking for I want to stop because I can't come up with the words right now be a more resilient well resiliency but they'll pick a certain thing that they're looking for so if you can build your project into that and cover that you have a much better chance of getting the funds well I guess yeah
[15:08] Speaker B (unidentified): and I hear you guys are saying because I got a question how are we going to engineer design the project when we don't know really what the end goal that they're looking for is.
[15:22] Speaker E (unidentified): I hear what you're saying, you know, and it's a lot of it I guess is, I'm trying to stop talking here, Margaret. A lot of it is I think trying to project what they might be looking for so you are ready to go when the grant comes out, yeah.
[15:38] Speaker D (unidentified): But if we get a price from an engineer just for the ramp, it might be something that the town pays for if we could figure out what bailey allen cost and add 50 on top of that would have some idea i thought it was around 120 000. they're talking
[15:56] Speaker C (unidentified): about garrison margaret yeah you're a resident and not doing the berms and the sand dunes and all
[16:03] Speaker F (unidentified): that stuff so distance text right i'm not sure where marianne left off but when we did the grant application for DOT the work I can't remember working waterfront or whichever one it was a lot of that grant was towards resiliency and so we built in a bunch of resiliency effort into that grant application specifically so when we got a quote from GEI for kind of a basic quote about the project which is what we need we needed to know how much grant funding we were asking for they said it was about $105,000, $100,000 for items one through nine on that list, which was permitting, final design and permitting. So that includes this improving the berm and the sand dune and all this resiliency work that we would take out of our permit application to replace the boat launch. we can always do work on the sand dune if we want to separately but the focus is really about
[17:13] Speaker C (unidentified): getting the boat launch replaced so do we so i thought you wanted all that resilient stuff are you saying we don't need the hundred thousand i don't think we'll need all hundred
[17:25] Speaker F (unidentified): thousand but we don't know until we go out to bid a hundred thousand is just the number that
[17:29] Speaker A (unidentified): we have to work off of but that's only for engineering and permitting right but just that and i think the board thinks that's high yeah a high engineering cost yes i agree but we won't
[17:39] Speaker F (unidentified): know what the actual cost is going to be until we go out to bid so 100 was just our ballpark number you we could pick 75 and hope that we have enough i agree that it sounds really high i would hope it was closer to 50 or 60. but the whole point in doing it with taxpayer funds instead of waiting for a grant is that i feel like we'd be better suited to get a construction grant if we are shovel ready so we would in the project the both lookout point and garrison cover in such dire shape right now they both really need replacement but i think the projects probably from start to finish would take two years at least probably three years so if you wait till town meeting to get approval, and then it takes a year for permitting, final engineering and then permitting, and then you have to either get a grant in that period for the construction or budget again for the construction. And I think you can probably only do it during the winter months anyways. The work in the intertidal, I don't know. So it's just gonna take a while. So that was kind of the plan. the one engineering thing that we would the resiliency portion of the project that we'd like to keep in there is making sure that the beginning of the boat ramp is elevated in a way that if there is flooding or sea level rises you can still access it and I don't know that would be feasible but it's something that at least we would want to know everybody I've talked to
[19:21] Speaker D (unidentified): who wants it at the same rate as the boat.
[19:24] Speaker F (unidentified): Oh, on the beach, yes. I'm talking about the beginning, the top of the boat ramp, making sure that it's elevated. So if there's sea level rise.
[19:32] Speaker B (unidentified): So are you going to drive up a little hill?
[19:34] Speaker F (unidentified): I don't know. That's why it would be an engineering thing. That came up during our resilience through our DOT application process.
[19:41] Speaker D (unidentified): Yeah, it's got to be even, Stephen, with the road. It might get impractical to launch anything there.
[19:46] Speaker F (unidentified): Yeah, that would be like the one thing that we would want to discuss with our engineer but other than that we would leave the sand dune piece yeah in the wind it comes it goes and there might be a grant at another time that we can apply for dune restoration we
[20:06] Speaker D (unidentified): haven't had to do any restoration maybe
[20:09] Speaker F (unidentified): we don't want to maybe we want to I don't know the beach you're there all time kind of stays the same in my 37 years I don't know I don't know how it's
[20:19] Speaker D (unidentified): been for the rest of the years yeah well i get twice that on there and it's always been the same
[20:25] Speaker E (unidentified): one thing i think if we're going to be going for resiliency grants keeping it where it is right now if we're considering that sea level rise is rising you're going to have an issue i would think of where the road meets the ramp won't you i mean kevin you live here
[20:49] Speaker D (unidentified): and I guess I'm sorry I miss what you said you can't have a hump up there so
[20:54] Speaker E (unidentified): you have you have to start I would think start grading back that
[21:01] Speaker F (unidentified): would be part of our discussion with the engineer but it wouldn't it wouldn't be you know if it was impractical it would be something that we definitely would skip right all right thank you thanks madrid and we'd like to repeat the process for lookout point whenever we can oh boy yeah oh where
[21:28] Speaker A (unidentified): were we well so we 're kind of just reviewing that summary sheet and i don't know if you have any specific questions on that here there is a backup sheet behind that and it will show you kind of department by department where some of the increases are we are proposing to increase the legal budget from 65 to 80,000 some of the increases you're going to see are in the employee benefits line and again a lot of that does have to do with the additional firefighters that we're talking about hiring in the municipal facilities area you'll see an increase we're looking at trying to do some painting and flooring upgrades starting on the first floor in 2027. Let's see, I talked about employee benefits. The Department of Safety is an increase. You'll see that's down in 3230, that account number. So overall, this is our starting point, and we welcome feedback. It is not within the LD1 compliant range at the moment. It's about 119,000 above, but again, on the Garrison Cove piece, maybe there's some room to lower that number and maybe there's an opportunity to take it out of fund balance and it would not impact the raise and appropriate level. We currently do not have the work plan and removal costs for Phragmites. I don't know if you recall, the board received a letter about that issue behind the recycling center. Yes. And we sent it to the committees. It's been under review. Margaret found someone who did a plan identifying how much of that particular species we have. There's a concern that it's going to continue to grow and it's going to get into the Long Reach marsh and it's really going to present some problems. There's another species, too. Shoot, I can't remember it at the moment. Margaret knows. [Speaker F (unidentified): Japanese knotweed.] Thank you, the knotweed too.
[23:52] Speaker F (unidentified): So, Japanese knotweed. So we had Rob Bryan do a site plan next door.
[23:58] Speaker D (unidentified): People call it bamboo. Yeah,.
[24:00] Speaker F (unidentified): We had Rob Bryan do a site plan next door and map the invasives and he mapped two kinds of invasives and we are waiting to talk a little bit more with him and find any quote from anyone to say the remediation of the invasives before we have a anybody can recommend whether or not we should move forward with the
[24:21] Speaker A (unidentified): project mm-hmm that's not currently reflected in this budget this budget also does not reflect any salary adjustments beyond the 3.6 was it that we added to the budget that's the Social Security Cola so those are kind of the points we wanted to bring forth we did provide you with the Department of Safety budget so you could see some of those increases again in the full time wage line you'll see a significant increase and then there is a decrease in the per diem area but you've got to look at those figures together and there's also an increase in the equipment line to outfit these new municipal firefighters so that budget is up like two hundred and sixty one thousand we also provided you with our benefits page just because you can see some of the increases there we're looking at a 2.1 million dollar estimated payroll and we are looking at with you know your concurrence that we would offer this new main state retirement program for firefighters and that would be about 47,000. Again, we're looking at that for an eight month period so that does not reflect a 12 month cost which you would see in the 2028 budget. And in order to offer this program, we have to have a specific warrant article that the town approves to join main state retirement for this program. we also had to work in some assumptions as I said about health insurance family plan single coverage and so you're gonna see that benefits budget increase quite
[26:09] Speaker B (unidentified): a bit let's see the insurance went up 27% again insurance went up 26.1% yeah up oh six point one yeah this is just based on oh because we're adding employees okay yeah thank you yeah six point one yeah thank you yeah i'm trying to think if there's anything
[26:32] Speaker A (unidentified): else i want to bring to your attention or just you know if there's any general feedback from the board again our first budget meeting will be on monday we're open to whatever you might want to
[26:50] Speaker B (unidentified): the only question I have maybe it should wait till our next meeting but since it's in the budget what are we hoping to pay a solar consultant to tell us that
[27:01] Speaker A (unidentified): we don't already know well I tried to outline that in the memo that you'll be
[27:07] Speaker B (unidentified): right that's why I said maybe I should wait till next week yeah I mean this is This is a draft budget.
[27:13] Speaker A (unidentified): Wait a half an hour. Yeah. This is a draft meeting, and nothing's cast in stone, so.
[27:17] Speaker B (unidentified): Good point. I'll hold that until... Okay.
[27:22] Speaker A (unidentified): And we didn't mention...
[27:23] Speaker C (unidentified): It just gets piecemealed, and so Christy was thinking, we were, everybody was thinking instead of all these piecemeal offers, and you have to rush and get this done and everything, should we have somebody look at the entire town, what is best, what shouldn't be pursued, what should be the entire town is in town property and I think we will get to
[27:47] Speaker A (unidentified): some of that tonight on your agenda because we're gonna talk about that program that the island Institute is offering there is also a master plan for Mitchell field and that's in the Mitchell field number yeah I figured
[28:02] Speaker B (unidentified): that's what that increase was the paper some of the does that include like the consultants and going out for the meetings and all that.
[28:12] Speaker A (unidentified): CHRISTIE WOODARD- And we put in, was it $30,000 for that thing? Yeah, I think that one is $30,000.
[28:17] Speaker C (unidentified): CHRISTIE WOODARD- That one's $30,000, yes.
[28:19] Speaker D (unidentified): CHRISTIE WOODARD- Yeah, so
[28:21] Speaker A (unidentified): that is generally the 2027 proposed budget. We are not proposing to put money in resilience and sustainability. It's currently at about $112,000. And I think they definitely want to maintain it at $100,000 level So they can be ready for grant opportunities that come our way. I don't know if the Resiliency and Sustainability Committee would support using some of that money for a solar consultant or any way. You did. I know. I know. So that's an option. That's right. It wasn't to RNA. It was going to come from solar. It was going to come from, yeah. That's right. There's a little bit of room to...
[29:09] Speaker B (unidentified): Is that the one for Mitchell Field?
[29:13] Speaker C (unidentified): So we needed a consultant to help us with the what do we do with our energy credits? Oh, yeah And so this that our consultant ended up doing it at no cost, but the RNs committee Did allow I think up to 12,000 the select board authorized up to 12,000 from RNs But then it didn't cost us anything
[29:37] Speaker A (unidentified): So that might be an opportunity for the fund to think about
[29:40] Speaker C (unidentified): yeah cuz it's over 12,000 right now maybe an option so generally on the
[29:55] Speaker A (unidentified): salary piece too we do not have the Budget Committee discuss very people's salaries that's something that the board will deal with and that's usually later
[30:04] Speaker C (unidentified): in the process so did we hear that we move forward drafting including the
[30:11] Speaker B (unidentified): firefighters with main purse or yeah i think so i think we'd be selling on to we wouldn't get any firefighters i think we have to explain that because we're going to have to vote on that you said at town meeting i'm sure you guys will explain that to the town folk why we're doing it
[30:38] Speaker D (unidentified): we have to if any of you are watching our meetings it gets talked about a lot
[30:47] Speaker C (unidentified): But Matt's right, Selectman Gilley's right. It does help that town meeting and Chief Wallace is an advocate for doing that and may speak
[30:59] Speaker A (unidentified): to it as well. Yep. That's his world. So again, talking about things not included, we don't have any additional capital funding for the recycling center. We also have not put any additional capital funding for the emergency services building. We have a pending $1.5 million federal grant that we are hopeful will be included. So we may have to think about that issue at some point if we get a response. Because our current plan for the building and the location that's being proposed is around seven million and we you know have six approved by the voters so we would have to scale that back it's been scaled back already right some yeah
[31:52] Speaker B (unidentified): yeah it has been you know scale it back or ask for more money which is
[31:56] Speaker D (unidentified): worse I'd hate to say it I'd probably go ask for more money I think so I would
[32:03] Speaker A (unidentified): yeah you can only scale it back so far right that's the thing i'm a firm believer buy once
[32:07] Speaker B (unidentified): cry once yeah it sucks to have to spend the money yeah it you know do it right the first time and don't have to come back in five years and spend another six million scale up what we'd already
[32:18] Speaker D (unidentified): scaled back that's called false economy yeah you know and you see what's happening with the fire departments you know that you can say they started leading fires well there's been three in a week
[32:27] Speaker B (unidentified): Yeah, it was on my parents road. It was exciting. Oh, okay. Yeah the brush fire at the end of the road there Somebody's campfire got out of control late fire department did a wonderful job. There's no damage to anything They have but I think that's what triggered the sign when you come into town 24
[32:43] Speaker D (unidentified): Yeah, we went down to the Gurnett's the other day them. Yeah
[32:48] Speaker A (unidentified): Frank's been very busy. Their tank is coming from everywhere and our volunteers
[32:56] Speaker D (unidentified): The biggest one the dry hydrants is not working. It's gonna leak in it. They can't get a draw Wait for parts for that thing. He's talking about Wilson. Yeah
[33:08] Speaker C (unidentified): It's because we also changed the part two We went to a different kind and that's why we're waiting for it. The contractor did have The prior kind in stock, but anyways, it's supposed to improve it. So we are waiting for this new part but is there any part did we capture all the select board's thoughts is there something that we've missed that you wanted included in this draft budget for monday how
[33:39] Speaker B (unidentified): much do we have saved up for the boat motor for the what bone motor yeah was it five thousand i thought
[33:49] Speaker D (unidentified): we put some away i just saw it no
[33:54] Speaker B (unidentified): we're putting ten thousand away but don't we already have
[33:57] Speaker C (unidentified): already have some save i thought we had five in there we have thirty thousand nine hundred ninety
[34:01] Speaker B (unidentified): eight dollars oh for oh so that will bring us up to just over forty then all right so we buy a
[34:08] Speaker D (unidentified): note board yeah upwards half that i just bought it 150. yeah i just bought that very same outboard last year i
[34:25] Speaker A (unidentified): was just curious no good question yeah are we good then i think so i appreciate the input and feedback. It sounds like Garrison Cove, we need to refine what we're asking for so we can work on that.
[34:40] Speaker D (unidentified): Just for the hell of it.