York Select Board Reviews Capital Plan for Roads, Equipment, and Police Vehicles
Speaker identification was not available for this meeting (plain auto-generated captions only) -- this transcript is not broken out by speaker. Home addresses that residents give are left out of this page.
[0:00] Everyone, welcome. We got 10:02 on Thursday, October 22nd. so we are at the library community meeting room here in York. and this is our second meeting capital planning process. and let's see on tap for today, we've got we're going to hear first from the public works department.
[0:23] So we got Tim Depario, superintendent of public works here. Tim's going to talk about the public works projects for proposed for this year with a long range view towards I think Tim you put together even more than five years. You've got a couple more years beyond that but we've got a good capital equipment schedule to talk about and also there's some other folks from public works here.
[0:47] we've got our chief equipment mechanic Matt Gray is here with Greg Casbomb as well the number two over there. So, they might come up and talk about individual items. Then after we get done with public works, we're going to hear from Owen Davis, who has one lonely item that he wants to talk to us about for the shared vehicle replacement. and we can go from there, you know, and you can if you got to take some phone calls for the next hour or so or take a walk or anything, feel free to do so.
[1:12] So, we'll probably be 45 minutes to an hour and a half with Tim here. So, thanks.
[1:19] All right, Tim, do we do you want to start? Do we want to start or do you want to hand me the Do you Can you give me a copy? Yeah. Thanks. Thank you. All right. Of your work. I put these in the order that you sent them by email. They're all FY28 projects. I believe the worksheets. So, they're not in order on the front.
[1:40] So, why don't you present how you would like to?
[1:43] Okay. order.
[1:44] So, the sheets behind here are printed in order that they were attached to the email you sent
[1:50] different on the front. Yeah, it might be a slightly different order than the schedule.
[1:54] Whatever. Is there any preference to the board here how they want to
[1:58] No. Do you want to do you want to explain the front the cover sheet the front sheet for capital table that you did because you showed 27 with items crossed off [2:07] Sure. So the items that are crossed off are the FY27 items that went to the ballot but were voted down.
[2:15] Okay. and some of those have been moved ahead to the FY28 budget.
[2:25] Okay. Could you could you let us know which of those you're moving ahead before we get started or you're proposing to move because there's some that you're not. Correct.
[2:33] Correct. So, the Mountain Road pedestrian safety project, we didn't move that one ahead. we moved ahead the basically the equipment one. So, the bucket loader replacement, utility tractor, sidewalk, snow removable machine, we moved ahead and an I 550 truck we moved ahead.
[2:53] All right.
[2:54] FY28.
[2:56] All right. Do you want to [3:01] go ahead in the order you'd prefer? Yeah. So, you've got eight or nine items talk about here. So, go ahead.
[3:08] we could start with a new one. this is a box culpet on Brayboard Harbor Road. It's a concrete 6x6 6' 6 foot concrete box culpet that we've noticed recently. It has significant failure to it. as you can see in the attached pictures, there's quite a bit of deterioration to the concrete.
[3:33] it's we've done some temporary fix work to it, but it could be a safety h or will be a safety hazard. Could be sooner than later. So if I'm asking for 400,000, which is at this time is an estimated cost. I'm still waiting for proposals to come in.
[3:53] And this would be for a liner similar to what we're doing on Long Beach. structural liner to slide inside it and grout around it and make it make it like new for quite a long time.
[4:10] Could you talk about how many So this is obviously a span of less than 20 feet falls in the responsibility of the town.
[4:16] Correct. Yeah, it's only six feet wide. Anything less than 20 feet is a town maintenance responsibility. Anything over 20 ft would be state DOT.
[4:25] And how many culverts roughly do you maintain in town with public works?
[4:31] Thousands. probably I mean anywhere from a foot in diameter to up to 20 feet in diameter. We have probably 6 8,000 anyway. Probably more.
[4:47] And typically they're handled in your operating budget.
[4:49] Yeah. Most right most of the smaller pipes are all handled in the operating budget. but you know culvets almost bridges really could call them of this magnitude obviously capital. and this is just a repair. If you had to replace this you're two to three times this price probably.
[5:08] You mean if you had to excavate and build new?
[5:10] Yep.
[5:16] Is this the one that goes is near 103? Yes. By the house.
[5:20] Yeah. Exactly. That's the one. Yeah. [5:26] so it would I guess if there are any pluses to it is if it does become too significant of a safety hazard before we were ordered funds to fix it, we could close that section of road where Braaybo Harbor Road does have another entrance off of 103. [5:44] so only a half mile detour for everyone who lives in the neighborhood
[5:47] approximately. Yeah. Yeah. I think that's probably better probably better than spending $400,000, don't you think, Tim? [laughter]
[5:54] Sarcasm.
[5:56] That was sarcasm for everyone at home. We have maybe a neighborhood resident sitting around the table with us who I'm who I'm ribbing. So, yeah.
[6:05] All right.
[6:06] Any questions on that?
[6:07] I think that's a good that's a that's a mustdo project.
[6:10] Yes. Yeah. And I think I did I did check that as a must do project.
[6:21] sure this is working.
[6:22] So, just to clarify, it says repair or replace, but you're proposing a repair.
[6:26] That's what I'm proposing at this point. [6:28] good.
[6:29] Yes.
[6:30] Thanks.
[6:33] All right, Tim. I'm thinking at this point what I'll do is we will do all the you know, road and property stuff first and then we'll group equipment together.
[6:44] So,
[6:53] So, next on the list is road bike pedestrian safety projects. this would be something similar to say Nubble Road or various roads we've done throughout town where we not only repave the road, but we widen it so we can either add a sidewalk or
[7:14] stripe it with a white line to give that safe shoulder for people to walk on, a little more room, make it a little more pedestrian, bike friendly. We have a short list of candidates for this, but we didn't specifically name out one just to keep it flexible for whatever the priority winds up being and work with the utilities if they have projects going on these roads that they're not quite ready to do.
[7:40] We can hold off on that certain road and move to the next priority road. But examples would be Broadway A where we're stopping the Noble Road project. We'd have Weber Road where we could widen that, put a you know either sidewalk or pave shoulder on that. Beacon Street, same thing. That's on that list.
[8:02] Woodbridge Road was on that list
[8:06] and there'll probably be others, but so we're asking for 250,000 for this account. [8:16] and we have this checked off as a should project.
[8:22] So this I know this is kind of an outgrowth of our
[8:28] conversations last year. It's it's listed as a separate project, but instead of listing so everybody can kind of understand I think where you're coming from. So instead of listing Weber Road sidewalk construction for $250,000 and then next the year after that Beacon Road widening and shoulder work to these are things that we've identified with the board for example as priority upgrades for
[8:54] bike ped connectivity like hight traffic areas. The idea is that one of those roads would be focused on by this project and it would only the only use of this would be road work that incorporates bicycle pedestrian improvements. That would be the intended use.
[9:11] But it wouldn't limit you to one specific road. So, as we go through this, like with the select board, if the board wants to say priority road is blank, get that done next year, then we should amend the title of this and when it goes on the warrant, it should specify the specific road. Good. If it has
[9:28] this has this one always been by itself or has historically it been part of the paving budget?
[9:36] No, it we try to use the paving money just for the actual paving for the overlay. so you'll see this like as a Noble Road project or Woodbridge Road project or there's very there's a lot of
[9:49] Yeah, I think the Mountain Road is the perfect So we've had several
[9:52] organ
[9:52] Yeah, organogue. We've had several appropriations also for Mountain Road up until
[9:57] last year it didn't get approved, but that was the intent. the mountain road would be resurfaced as well, but the intent of listing it specifically is because it was a bike ped
[10:09] and the rest of the bike ped network. So
[10:12] So guidance if we have specific guidance as to which projects to tackle and we can get into that during the budget process.
[10:22] Yep. That would be your take would be that would this would get replaced with like a specific road
[10:27] either a specific road or maybe a short list of you know couple roads or something like that. Yeah.
[10:32] So you're sort of proposing a bucket for these type of projects it sounds like and I'm curious because the focus is on bike and ped safety. Has there been coordination with that committee?
[10:43] We have. We 've spoken in the past about certain roads that I'd like to see.
[10:48] These would these would be sort of top of their list as well? I assume it'd be a it would be a blend of bike ped committee recommendations, select board recommendations, you know, general public input.
[10:59] Jen, do you have a general sense for how much you could complete with this dollar amount like number of feet or num?
[11:07] It all depends on which project we would do, right? Some of them are long.
[11:11] So, you know, this is a small dollar figure starting out. So, we'd want to it' probably be a smaller
[11:16] project. I think we could like a Weber road. we could get pretty far and something like that where it's already kind of wide. it wouldn't take as good material there.
[11:26] So this would likely only cover maybe one road.
[11:29] Yes.
[11:30] Okay. Okay.
[11:32] Yeah. I think it's to just without getting into too much detail in specific, but Weber is been identified kind of with the school work that's going on. There'll be a sidewalk there. There's a real lack of connection from the existing town sidewalk network on both ends of the school road. So to Long Sands Road on the Long Sands Road side and to Weber on the other side.
[11:53] And when they make that kind of connection, which I think they're intending to do, we'll probably hear about that. It's kind of more of a school project that's on the property, even though people would probably look at it like a road project. But when they make that connection or we make that connection, however that's done, doesn't do any good to have the sidewalk at the new track completed along I mean it does some good along Robert Stevens Drive, the driveway, but doesn't really make any connectivity.
[12:19] People are then kids essentially are then walking on the street on Weber. It's a relatively safe street to walk on the shoulder on, but you're still not a protected pedestrian facility at a major school facility. So, I mean, you 'd want to that one stands out to me, but I understand kind of your thought process. It may not timing wise that may be a two-year versus next year kind of a thing or something like that,
[12:41] you know, and we they can walk out the other end, the Long Sands Road end, and there's a sidewalk on Long Sands Road. and if they walk out the Weber road entrance, there's no sidewalk on Weber, but when they hit Ridge Road, there is paved shoulders for ways, which that Ridge Road would be on the project list, too, eventually to
[13:00] widen the rest of that. But we have started that. [13:03] you know, it's not a curbed sidewalk, but it is a paved shoulder for, you know, bikes and pedestrians to travel on. The thing that I like too about the bucket is it gives you a little bit more I almost think about the seaw wall where it's like there's more flexibility. You know, if we finish a project and it's like favorable weather or budget, you can just move on to the next thing without having to wait for the next
[13:25] capital cycle, which I think is like efficiency important. I like I like the bucket for that with some, you know, guidelines, but like I like the bucket for that. Yeah,
[13:34] agree. Are you expecting this will be a recurring?
[13:37] I would. Yes, I am. Hopefully
[13:40] until we improve every single street in New York that's a connector [laughter] road, right?
[13:44] I don't have to worry about that.
[13:45] Yeah.
[13:45] So, but let's just talk about that. We get that question sometimes. [13:50] which is valid, right, from the public. So, we're going to put a bike path and a shoulder on every single road in town. I mean, that's tens of millions of dollars.
[13:59] Just to be clear, so for everyone who's watching this and you know, so we're on the record. We've identified kind of connector and I mean, this goes way back. this is comp plan work. This is planning board work. This is bike ped committee work where there's been kind of this understanding of connector roads should be prioritized. and deadend neighborhood streets don't necessarily always get a sidewalk
[14:23] a shoulder. They don't even get striped in a lot of in a lot of instances due to traffic volume. Right. So we're identifying routes where that are connector routes that have the bulk of pedestrian and bicycle traffic. That's why Mountain Road, a lot of people kind of I know that one failed last year, but a lot of people asked, well, why are we even focusing on Mountain Road?
[14:43] there is a bicycle ped there's a good shoulder network leading up to the point that's still the part that is now unfinished, right? And then there's a recreational facility on the other side, which is Mount A, that a lot of people ride bikes to either to mountain bike or to road bike up to the top of it. So I mean this isn't done in a vacuum.
[15:04] I think there is an intention to focus on connector roads, major routes rather than just every road's a perfect example, right? Like you improved sidewalk all along Nubble Road. That is a connector road for all of those major all those minor neighborhood roads that are there, you know, between the beaches and the lighthouse.
[15:25] And that is the route. We're not going to add sidewalks and shoulders to every single road interior on that all those small roads, but one road that everybody can collect on and walk.
[15:35] And speaking of that, so Neville Road turns into Broadway, which Broadway has a sidewalk except for the last
[15:42] few hundred yards between Nble and Broadway sidewalk. So that
[15:46] perfect example making the link. Yeah.
[15:48] Make that connection. I I know there's one road that bike ped committee is concerned with is Rididge Road has a good bike lane from York Beach up to about Smith Field and then it disappears until you get to along Sands Road.
[16:08] And that's
[16:09] that's a that's a priority for them. I know because if it 's good it's good and then all of a sudden it disappears
[16:16] and you're right on the travel lane. And there's also a sharp drop off there in a couple of places. So I would hope that would be in the in the long term.
[16:25] And I kind of feel like that's a good thing about the way this is set up is that it,
[16:32] you know, then if we get the funding then, you know, we can or even before we get the funding, but we can discuss as a group all these different, you know, and come up with a prioritiz prioritization list. And [16:45] Yeah. Yeah. And if I could there's There's been some talk about Beacon Street, the end as far as the sidewalk, the on the Long Beach Avenue end of it. A lot of people walk there with, you know, strollers and things on the right. Cars do pull off, but there's no there's no lane.
[17:07] There's no sidewalk on that side. which is is kind of kind of scary sometimes.
[17:14] I think that was the initial round that Tim and I brainstormed a year ago. Beacon and Weber were kind of you know missing links if you will that everybody uses but that don't really have any pedestrian facilities.
[17:25] It does for a way. So it's only a few hundred feet.
[17:29] Mhm.
[17:29] or maybe even less than that.
[17:32] Yeah. It's both ends of there's like a sidewalk in the middle of Beacon, but it doesn't connect to Long Beach and it doesn't connect to Ridge Road.
[17:38] I've walked that before with Chinese children. It's scary [laughter]
[17:42] and that gets a lot of pedestrian traffic. There's Yeah, there's always a lot of
[17:45] a lot of cars looking for a place to park, driving around there,
[17:48] and it's a nice straight road. People tend to go a little faster on it.
[17:52] That's right. [clears throat]
[17:52] Probably should. But
[17:54] so I noticed on the list you gave us for everything that the planning department wants to update the bike pedestrian master plan. So that dovtales nicely with what you want to do and prioritization.
[18:13] good on that topic. [laughter]
[18:15] All right. So, why don't we kind of segue right into now the roadway and sidewalk paving program. we're asking for 1.6 million for that. This year was 1.5. So, just kind of boosting it up a little bit.
[18:30] Do you have paving schedules?
[18:33] Yeah. So, what I passed out to you folks was the completed FY 2026 or the 2025 paving. the 2026 paving that we're currently working on and a and a not finished but proposed [18:52] the boy 28 or 2027 paving.
[18:58] [clears throat]
[18:58] So, kind of the red's completed. The the green is in progress and the blue is what we'd be asking for or partial as to what we're asking for the FY28 program. [19:15] can I see a blue one?
[19:16] Yeah, I don't have blue or green. We got red.
[19:19] Oh, shoot.
[19:23] All right. Thank you for color coding them.
[19:27] Yeah, that's actually great. Thank you.
[19:30] And when you
[19:33] And when you The blue one says 2027 paving, but that really
[19:38] That's not the FY, that's the
[19:40] Exactly. It would be FY.
[19:41] It gets confusing. So for us, it's it's easier to put the physical year.
[19:46] Yeah. Yeah. But just for all of the rest of us,
[19:50] green.
[19:51] Thank you. I appreciate that.
[19:52] Yeah. So, the red list is completed and the green list is
[19:55] I've got green. Yep. Thanks,
[19:57] everybody. Good.
[19:58] [20:02] partially why the 2027 isn't completed. we're currently doing a scan of all the roads to update all our data. So I'm interested to see how the new data compares to the old data which is four years old now and still am working with utilities to see what they're discussing future projects and kind of
[20:25] going back and forth on that stuff.
[20:28] Who's who's doing the scanning?
[20:31] City Logix is the name of the company.
[20:33] And where did that money come from to pay for that?
[20:36] That I'll take out of our contracts line. in the contract schedule.
[20:44] I'm curious about how you're what trend you're seeing year-over-year of this line increasing.
[20:55] you can see like our what we completed last year for paving and then with the so in the 2025 we only pay 5.4 miles of road. that number is a little lower, too, because a lot of the roads on this list were in subdivision. There's a there's at least one subdivision that we did the whole thing.
[21:15] So, you have a lot of intersections, wide areas that they take up a lot of mix. So, that lowers our mileage. for this year, we're we're projecting to be able to pave about 8 and a half miles of road, and that was that was an increase of $200,000.
[21:34] So, you know, I guess you know, each 100,000, you know, might get you probably not a mile, but close to it.
[21:44] It's hard to tell because if you look at your linear length to a yard.
[21:51] So, that's actually really interesting the way you say that. So, linear length to yard of one this year as opposed to almost 2 and a half to one last year when you got 5.4. So you're doing 72,000 yards to only 28,000 lane miles lane feet as opposed to the other way around.
[22:11] You know, a highly a more traveled road. we put on a little thicker.
[22:15] Yep.
[22:15] And if the road is out of shape, that first that shim layer they put on to fill the fill the wheel ruts is going to take a lot more mix.
[22:24] Yeah.
[22:24] and that's just you just best guess estimate on that stuff. [22:30] so sorry, go ahead. No, I was Thank you. [22:35] I'm hearkening back to my very first days on the budget committee when which was 10 years ago when we had a million dollars on the budget and I just did a little calculation to see what the inflation rate is over the last 10 years approximately 40% in the US. Mhm.
[22:54] so I'm just curious about how we are, and this may be more of a policy question than a Tim question, but how we're thinking about the spend on roads as it relates to other costs and the cost of living changes and inflation and because that's a that's a pretty big 60% is a pretty big bump in 10 years.
[23:20] I'm probably a little aggressive on the paving, but it's trying to trying to get us caught up to the point where it will cost us less to pave the roads if they're in better shape. Then you're using less mix. So you're not having to dig up the road and totally replace it, which then you go from a say a 2 in two to two and a half inch total mix to at least four inches of mix and plus all the work it takes to get to prep the road for that.
[23:46] [23:48] at what point do you think we hit that balance?
[23:51] I know it's a magic question.
[23:53] Or drive the roads. And when we feel like the roads are in good shape, we've made it. I don't [laughter] I don't think we got there yet.
[24:00] I got here today. I had to
[24:02] I am not disagreeing. My biggest issue is that I still think this money should be in the operating and that's I've been crowing about that for a really long time. And so
[24:12] it's a it's a policy question and it's a different issue, but it does speak to the continual increases.
[24:18] That's yeah, that's something too. If this fails, if this votes, you know, if voters voted no, then that's zero appropriation and that would that's going to set every road in town back.
[24:30] Yeah. Which is
[24:30] to get closing the town.
[24:33] So there's no way people will vote. Yeah, [clears throat]
[24:36] you know, I 'd like to see us paving definitely over 10 miles a year.
[24:41] Okay.
[24:41] [24:43] you know, probably closer to 15, but to get to that point
[24:46] you're you're maintaining is going
[24:51] more.
[24:51] Yeah. No, I think it I it all makes sense to me in the grand scheme of things. I just as we continue to add more as we need to as appropriate for the growth in town and for maintaining and to get to a lower point later where we have to maintain the roads. I think it is important to continue to bring up the fact that can we start to shift even some of that delta into the operating as opposed to always funding it with bonds.
[25:20] I can put all of that into the operating this year if the parties that
[25:24] Good luck. Yeah. [laughter] No, I think it's going to die. I mean,
[25:28] I know the reasons not to and I'm never going to get out of the cycle and it's getting more and more and more and more every year.
[25:34] I think there's a philosophical split on that and parties at the table may be philosophically split on that. For example, I may align more closely on the opinion that should all be in the operating budget because it's a recurring cost, but other people at the table who can speak up if they want may think that it should all be
[25:53] because my kids are going to pay for debt finance. They're going to use the rest.
[25:56] Exactly. Yeah. So, [25:58] what's the what's the life what's the life of doing
[26:01] 20 years? Yeah. 10 year 20. So the the that's a great that's we don't need to solve that for Tim but that but I mean it's worth discussing here. I mean bringing it up it is yeah it is a policy question of where that belongs. [26:18] the 10-year increase in the asphalt paving mix PPI is measured by the federal government is 50%. So 60% increase means we're 10% ahead over
[26:32] So yeah. So we're just 50.6% specifically. So a little
[26:36] I think you could make the case we were spending too little.
[26:38] That's exactly what I was just going to say. I mean it's clear that there's been a humongous improvement. So I'm I'm very much in support of this. I'm just want to keep bringing the funding.
[26:48] Well there well so that's so that kind of semi answers the question. We're 10% baseline increase over 10 years ago in what we're spending on asphalt compared to what the asphalt cost is.
[26:59] Thank you.
[27:00] So
[27:00] appreciate it. So slightly better, but to get to Tim's point, not at the point where we're we're improving things 10% at a 10% higher rate or putting down 10% more asphalt than we were 10 years ago at this current expenditure level.
[27:17] And 10% may be conservative on asphalt costs in the coming
[27:21] coming years.
[27:22] An excellent point.
[27:23] Yep.
[27:27] Great discussion. Bet you weren't expecting that one.
[27:31] [laughter]
[27:34] Nothing's off the table
[27:35] about everyone's favorite topic which is vehicles and equipment.
[27:39] So you got this as a should do.
[27:42] That's another philosophical question.
[27:43] Yeah. Right.
[27:44] Should do versus must do. Yeah.
[27:46] I just wanted to
[27:47] that one I was bouncing you know.
[27:49] Yeah.
[27:50] Yeah.
[27:50] Is your is your thought that we could not pave everything for five years? Is it just we would have massive civil unrest when we didn't [laughter] do that or but people would still theoretically be able to drive over the
[28:03] you know I feel like it would be a should do for a couple years but then it's going to have to go under must do. You're going to have potential life safety issues where we wouldn't be able to keep up with the patching. So yes, there would be a certain point where it has to shift to a must do.
[28:16] Each road's probably different, right? Some of these are we really should get to them and some of them are they can
[28:21] they can fester for five years. Yeah. Let me see. Yeah. Pay me now. Pay me later. And it's going to cost a lot more later.
[28:29] Shouldn't
[28:29] if only to get a laugh.
[28:31] Yeah. Yeah. [laughter]
[28:31] Sorry.
[28:32] Should and a half.
[28:34] Okay.
[28:34] Yeah.
[28:38] Want to do Chase Pond facility next and then that will just leave equipment after
[28:43] Yep.
[28:43] that something that was in the capital table at least the last year or two, couple years. [sighs]
[28:54] asking for
[28:55] can I start with the bigger picture because what you and I have actually talked about then you can go to the stuff that you can surprise me with what we haven't talked about. Chase's pawn road versus 810 US Route 1. So that there has been years ago there was a long-term plan to upgrade A10 US Route 1 to a
[29:15] premier high-end public works facility if you will. so new facilities workspaces including office space like construction of new facilities. The price tag on that Tim that you were throwing around that you were aware of tens of millions.
[29:32] Yes.
[29:33] High tens of mill medium tens of millions.
[29:35] Tens of millions.
[29:36] And for those that were here when that was being discussed who was not me that was five years ago maybe
[29:42] that sound right? Yeah.
[29:43] Five to 10 to more years ago.
[29:47] Yes.
[29:47] Okay. So, sorry, just to set the table. So, we've talked extensively about that when you were installed as public works superintendent. Your thought process is to focus on Chase's Pond Road for operational reasons. but obviously, we are going to continue to use 810 US Route 1, but your priority is not to do a massive improvement at 810 US Route 1 and relocate the entire public works operations there.
[30:13] Could you talk about that briefly so everybody?
[30:15] Not at this point. [30:16] so everyone can hear your thinking on that.
[30:20] So,
[30:20] however rough it may be.
[30:24] So, we're at Chase's Pond right now. That's where that's where our mechanics are. That's where our offices are. and it's it's functional. You know, it could it needs some part of this money here is we need a new roof and we could use a little expansion for more office space, clerical,
[30:45] things along that nature, but it's it works. It's, you know, it's not new and modern, but it functions well. 810 Route 1 is good for storage. it has three goodsized buildings that we can keep I would say a lot of our equipment in. A lot of our trucks are housed in there and they're all heated. So, that's nice in the winter. but you would there's nothing there that you could convert to
[31:12] there's nothing there that I would convert to office space. so you're talking a new build and we all know how much new builds are. And then if we moved everything there, we're also talking salt sand storage facilities. The one there now is very undized. [snorts] So, if you wanted to say
[31:35] totally move from Chase's Pond to Route One, it would be it'd be very lengthy, very expensive. You would probably remove all the buildings that are there now to make room for new buildings. [31:53] it's I feel like it's good for what we use it for right now. And we upkeep those buildings. They were built, I believe, in the 50s or 60s. So, they're quite old, but they're you maintain them and they're they're doing all right. [32:09] what the rolling into kind of the talk about Chase's pond facility. The facility is kind of rough. I don't think I think there's been some tours out there in recent years.
[32:21] Yep.
[32:22] At least half the people at the table and half of the people at the table working there either all day or weekly with you. [32:29] I think they have done I mean I just want to speak up here. I think I'm really glad to see this on the on the capital plan. when we did the tours last year there were a bunch of us around the table who were there. I think your team has done the most amazing job of of doing the best with what you have there.
[32:50] And you know being able to literally eat off of the floor for the garage is amazing. but it's a dump.
[33:00] Oh, come on.
[33:03] And I
[33:04] It's actually the dump is a witch. This is just This is a garage, but Yeah. Yeah.
[33:08] facility. And I and I think as we are doing the right thing for our employees in the police station and the town hall, this feels like a really important project to make sure that we are also honoring the team that works really hard and making sure that you have the facility that you need and people aren't in the hallway, you know, the offices aren't in the hallway.
[33:30] seems like a really a high priority.
[33:36] So tell us what 500,000 we'll we'll get to.
[33:39] Well, that's to be determined. but [33:42] talk about can you talk about the immediate mechanical needs roof specifically?
[33:46] That's we do need a new roof. We've we repaired it multiple times in the past. The last time it was done was it was probably maybe five years ago. It was a just a coating that they said would get us through for a little while, which it has. But now it's leaking again. So, it's it's time for a new metal roof. so we'd like to do that and maybe just a small
[34:10] remodel addition type thing, you know, maybe just a little redesign. Nothing too extraordinary, but enough just to, you know, give us a little bit more flexibility, a little more room. [34:22] would this include, are you thinking this would include showers and some sleeping space?
[34:27] What's a metal roof cost? I would estimate it's at least 100,000
[34:34] for that main facility right now.
[34:37] For the main facility building?
[34:40] Yeah, the whole building. Yeah.
[34:41] And we might be able to tie it. We do have an addition on there that was put on
[34:47] oh 20 years ago now. That roof is probably still okay, but whether it makes sense to tie into that,
[34:56] I don't want to say new roof because it's it is 20 some odd years old to tie into that or just to replace the whole thing. That would be up to the contractor. Give us a price on
[35:04] You're thinking about reorganizing the workspace, the upstairs and the kind of downstairs workspace. So, you're going to make Matt's office totally inconvenient to him. He's going to have to walk to a different part of the building now or something like that.
[35:16] Yeah. But that's what you're you're talking about the changing area the mats locker rooms mats downstairs what's in front
[35:25] more probably more the second floor but obviously you need
[35:27] something on the first floor to make us second floor bigger so yeah
[35:31] probably need sorry go ahead
[35:32] as I recall in touring the two facilities the 810 US Route 1 had our big snow plows they were in nice heated
[35:42] bays and as I recall at Chase's pond ond all of the vehicles except maybe those that were being worked on are outside.
[35:52] Correct.
[35:52] Is that correct? So in terms of lengthening the lifespan of our work vehicles were you thinking about a large garage so that those could be also u indoors? I know they're in and out and working all the time, but
[36:14] in this money's no
[36:16] this would not this would not bring the vehicle
[36:18] in the $40 million proposal. Yes. [laughter] but you know, we park what we can inside in the in the winter months, you know, at Route One. and at Chas's Pond, but there's there's not quite enough room to put all the heavy trucks inside. Almost, you know, we can put most of the trucks inside. Overall, what percentage of your vehicles are inside versus outside?
[36:44] 75.
[36:46] Looking
[36:51] or how do you split them? Do you think of plows versus other or how do you think of your of your fleet in that regard?
[36:58] We got equipment, heavy equipment. We got small
[37:04] trucks like class.
[37:07] You have your sidewalk and
[37:09] pretty much all the small trucks outside
[37:17] have to keep the sweepers in because they have water systems.
[37:30] We have 13 I think.
[37:33] And are the 11 inside solely at Chase's Pond or does that include 810?
[37:38] No, they're they're at they're inside at 8:10.
[37:41] At 8:10. Y.
[37:42] So at Chase's Pond, you have
[37:44] that's more of the repair facility and we can we'll put a couple one- ton trucks or pickup trucks in there for the night type of deal depending on what's
[37:54] in there for repair. So, three big garage. But
[37:56] I guess I'm just thinking about if we're going to do a project on Chase's Pond, would it be long-term cost effective to include garage space for equipment and smaller trucks to expand their lifespan
[38:14] or even as a
[38:15] I just remember stuff sitting around outside and feeling like the elements were just eating up all of our a lot of our equipment. We could I feel like with this money is being asked for it wouldn't hamper anything in the future from that. if we want to do both at the same time,
[38:36] you know, we're going to really
[38:37] this number would really go up.
[38:39] Oh yeah.
[38:39] To add garage space
[38:40] to try to get garage space
[38:42] even like a quonet hut kind of thing.
[38:44] Well, that's that's
[38:45] I don't mean to push but
[38:47] if I guess you could do a quonet hut, you know, something with a shelter over it be unheated. you know at that point would it extend the life of the vehicle? I don't I don't think it probably would a lot.
[38:59] Well, it's if we're talking about I'm thinking coverage. So, kind of two levels, right? You have covered storage pole barn or greater. and then which you see at a lot of public works facilities for equipment. and then heated and made in condition space is a whole different story which there's a benefit for daily drivers there for that but not necessarily for
[39:23] you know the equipment that's going to sit for 3 to 15 days between being used or whatever you know if you're storing stuff seasonally. Matt, do you think that there's a benefit to covered storage for vehicle longevity or equipment longevity? like simple pole barn just to keep the rain and snow off
[39:44] or grade or something
[39:45] if the sides are enclosed.
[39:47] Yep. So, three
[39:49] not a pole bond like an enclosed building. I don't when the sides are open. No, because
[39:55] you still credit as
[39:58] [39:58] so unconditioned space. Unconditioned space is fine, but you would recommend that it's enclosed unconditioned space.
[40:05] Yeah,
[40:06] that's that's good. That's Yeah. Well, I mean that is something to for to discuss Tim. I think you're hearing that people wouldn't necessarily be opposed to you going more ambitious on
[40:18] Yeah.
[40:18] that.
[40:19] Yeah. I think the the covered space unconditioned is better in the summer. You know, you keeping the get the vehicle piece of equipment out of that sunlight that if it sits there day in and day out will, you know, fade the paint and which leads to rust. And of course in the winter you can't say much about the snow because it was snowing where working. So
[40:38] yeah. Yeah. I appreciate the humility, but I think that you need to ask for what okay what the vehicles what's going to you know lengthen the life of the vehicles and I am still concerned about employee safety for you know when we have snowstorms and understanding that there are staff members who are sleeping in chairs in an open space with no shower space for you know up to 72 hours for a really big storm and I just am I think that's something that we
[41:08] talked a bit about of making sure that there is safe space for people to rest in between and that's a safe more of a safety issue than it is a vanity issue. I just I think you want to keep thinking about that.
[41:22] How's the salt shed?
[41:25] That's fine.
[41:26] It's it's good.
[41:27] Good. So you have a $500,000 number. You have 100,000 for the roof. So you in the process now of getting bids for the other type of
[41:36] we're getting pricing on the roof and then see where that comes in at and then try to get a design idea you know what can we do with the rest of the money type of
[41:44] so have that in the
[41:47] I guess before this comes before the select board
[41:54] sort of a really round number placeholder
[41:57] I think I think haven't we talked in the past about before we put something on the ballot that it needs to be a lot more refined.
[42:04] Oh, yeah. Yeah.
[42:05] Yeah.
[42:05] Well, and also to be fair to Tim, I might have pushed him this week to include
[42:11] this roof repair.
[42:14] Yeah. He was going to put a roof and put this on next year. And I said, "No, I think you're going to hear from people, including myself, that we would support improvements for whether it's employee working conditions or you know, space or all that. So, I don't want to criticize you too hard on having just 400,000 tacked on to the 100,000 because you've had about [42:36] I don't know 36 hours to come up with that number. So, thank you, Tim. Yeah. But thank you for putting it in. I think it's important. Tim Matt 's got his hand up, too. So,
[42:46] I just closed building. One more thing as I think about it because I wasn't really in the mindset to answer a question like that. Sorry to give you a left fielder there, Matt,
[42:56] but and I think it goes along with what Tim was saying. So, three seasons it would be beneficial. Where it where it would be tough is in the winter time if there was no heat in it. It's likely to be colder inside it than it is outside. It'll be more difficult to clean the floors and stuff with salt and stuff dripping off, you know, and you
[43:21] like before we had 810 US Route One, we would go long stretches without even rinsing a vehicle off because it was too cold. They'd freeze.
[43:30] Yep.
[43:31] So,
[43:33] yes, an empty building would be better than no building, but heat is also important. give some
[43:40] just like a not like a 70° heat, but like a you know,
[43:45] yeah,
[43:45] enough so
[43:47] we could clean up salt and stuff that dripped off the trucks, clean up mess during the winter and also allow the truck to dry after it was washed.
[43:56] Yeah.
[43:57] Could I ask would a radiant floor be better than heating the whole space?
[44:01] Oh, yeah. I've worked in radiant buildings and they're incredible.
[44:05] Radiant heats the whole space.
[44:07] Yeah. Yes, it does. But also more efficient because you're gonna you're getting you're getting the heat right underneath your
[44:15] Yeah. And the floor is always dry. I worked for about five years. I worked in a building with radiant heat floors and it was amazing. But I
[44:25] All the objects get heated, which is a plus and dried. I'm not sure it's cheaper. I We went through a lot of
[44:36] heating oil. doing that.
[44:38] Yeah.
[44:40] Yeah.
[44:40] Car wash ability. I just heard someone up here mention it. so currently you think you're maxed out at both of those facilities because of septic treatment requirements. The facility like the options that we have. You want to talk on that a little bit? So a formal like a full commercial drive-thru
[45:01] drive-in car wash bay
[45:03] truck wash to be clear.
[45:05] Yeah. Yeah. Not I'm I'm saying yeah commercial size wash facility. you and I had talked about that you thought there were some concerns about septic [snorts] treatment ability. Right.
[45:17] There's I believe that they always want these truck washes hooked up to a septic and I mean excuse me to a town sewer. but they do regenerate you know they do regen the water they use. Chase Pond Road would be out immediately just for space and we're on well water there so the water
[45:40] demand wouldn't keep up with it. Route one we've looked into you know they're again very costly at some point it's it probably would be something to consider in that in that package. So you have manual wash facilities equipment now is what you
[45:56] manual wash. We do have attachment for our pressure washer that wheels under. It's on wheels in it and it sprays up under. So the you know the crew does use that to wash the unders sides of the truck. [46:11] I think that should be in the five-year plan somewhere.
[46:13] It's all outside.
[46:15] So is that a regional thing? I mean, could we could we
[46:19] Somebody could look see if anybody
[46:22] and Elliot and
[46:24] I don't know does any other town in the region have one of those?
[46:29] I know South Portland does. I don't know if anybody closer than that does or not.
[46:34] That could be a regional conversation about, you know,
[46:38] I know Kery, not the town of Kery, but there is a truck wash facility in Kitery
[46:44] that we could use. I think we've tried it before. actually Matt probably want you come up to the table now.
[46:57] Truck wash facility. Do we feel it's
[47:02] needed? Would it be helpful? What 's the pros and cons of a truck wash facility?
[47:09] So, it could only be helpful.
[47:13] I could think of many pros like cleaning the trucks and getting them dried off and stuff like that.
[47:23] I think anything that we add like that, my first concern is we're such a small department. We're all right tapped out now. So without any more manpower, adding stuff like that to maintain it just pulls us away from the stuff that we're not getting you like we're plenty busy. There's plenty to do now.
[47:42] So that's my first thought of it. Like okay, we add that 's
[47:46] talking about the actual wash equipment and it's going to have to be maintained.
[47:50] Yeah, someone has
[47:50] it's going to have to be maintained.
[47:52] Not a simple system. If we go back to the Kery one, we tried that and I actually went down there with some trucks, but sometimes it's a couple hour wait
[48:00] to, you know, the line down there is
[48:02] commercial truck facility.
[48:04] Yeah, there's one in it's just past the Irving on the Route One bypass
[48:07] by the truck stop area.
[48:09] Yes.
[48:10] The line sometimes you have to wait a couple hours to get through. Yeah. And they have two bays. So, because we were looking into getting cards so everyone could go down there, but you lose a couple of days trying to wash our trucks.
[48:24] So, [48:29] yeah, I mean, washing the trucks can would only benefit them
[48:37] obviously. I think that's Yeah, that's why we're pushing the issue. I think we'd love to
[48:41] How do we How do we wash our fire fleet and our police fleet? They always look super shiny. You know, they're doing different work and our parks and wreck fleet, but I mean, we have more than
[48:53] fire is all handwash. They might have washing equipment, but there it's all hand wash in place, right, at fire?
[49:00] I don't know.
[49:01] Yeah,
[49:01] I would I would imagine. And they're and they're w they're like historically I' I used to work on a lot of fire equipment. Historically, those guys are fanatic. So,
[49:11] in their downtime, they're wiping them down, shaming them.
[49:15] They're really fanatic about their equipment. They're polishing their you know, the chrome and aluminum and different things like that. So, I don't we don't have the manpower to do all that for one, and for two,
[49:29] like our trucks are totally different. like we're putting this product out on the road and it and on a lot of the trucks the the product's going ahead of the wheels so the wheels keep kicking that slurry up and it covers everything under there and it makes it a lot more difficult. [49:51] we've done some things to mitigate that some and it's helped but it's hard to eliminate all of it. I mean, that's a it's this isn't just a York issue. That's every place in the northern part of the northern half of the United States deals with, you know.
[50:03] So, if you had a truck wash, what how much do you think it adds to the life of a truck?
[50:10] I 'm not prepared to answer that. [laughter]
[50:14] We know you got to do that costbenefit analysis. You know what I mean?
[50:17] I mean, I would I would imagine a truck wash, you're looking at a couple million to
[50:22] get one up and running because it's going to have to be inside.
[50:25] Yeah. Yeah.
[50:25] But we're also paying millions for the trucks.
[50:28] Yeah.
[50:28] You know, I mean,
[50:29] how many more years you get?
[50:30] Right. Right. But if you could expand, if you could lengthen the life of assuming all of our commercial trucks by two years, you know, how quickly does that pay back?
[50:42] It's operational impact
[50:45] times 250,000. Yeah, exactly. Yeah.
[50:48] I feel like we're still evaluating the benefit of storing the trucks inside in the winter months. we acquired the Route One garage.
[50:57] and we, you know, I feel like it's still too early to tell. Is there a I'm sure there has to be a benefit, but I don't know if we've seen
[51:05] I bet the carpos people would know. [laughter]
[51:08] Well, I Yeah, I bet I know which direction they're going.
[51:13] Might have a one sheet that shows exactly how much you can save if you use their product.
[51:17] Maybe just a good discussion, something for you guys to
[51:21] continue to think about. I think we hit on something though a couple minutes back of regionalization on this because I know that this isn't something that any typical town smaller than us around us is biting off, right? simil they a lot of people probably have similar setups to what you're doing is it's okay, it's over 30 degrees, let's get the pressure washer route and do five trucks after a salt route, right?
[51:46] [51:48] there's Tim's right. We always ran like you do like one and a half trucks and you got to wait a couple hours for the well to catch up at Chase's pond. There's no there's just no water.
[51:57] Yeah.
[51:58] But that's also a human impact too, right? I mean, when we're we're talking about tradeoffs here, one would be capital. Another would be better for the environment that we're not continuing to buy more trucks and given the supply chain issues, you know, we have a little more bandwidth. And we're talking about you and your team not being underneath a truck washing and being able to manual do other things instead.
[52:24] So even that addition of potentially a human to be able to run the wash or to maintain the wash or some of that may get repaid by not having you all waiting around for a truck for three hours for the labor of you know the driver waiting plus you being under the truck plus you know plus. I just think there's a there's a much bigger case to be spoken to about it that's not just about the capital
[52:50] and I think it's something that needs to be studied, investigated because I don't I feel like just driving a truck through the truck wash isn't going to be a magic solution. Like I wouldn't be surprised you drive it through depending on how much salt is on the truck that it'll still have quite a bit remaining on it
[53:06] or you put it right back out on the road afterwards to drive home from the commercial truck washing kit and you've got this 70% of the same salt on the underside of the thing as you did when you went down by the time you get back to York. I
[53:18] mean do you think South Portland could tell us? I mean do you have a relation?
[53:22] Yeah, when we tore we tooured their facility back at least five or more years ago now and that was it was a new newer facility. So I don't know if they had enough time in but now they could probably yeah we could check with them. sense
[53:36] cost benefit and taking a look at just enhancing the the quality and speed of the undercarriage. Isn't that where a lot of the value of cleaning it is? Is the undercarriage from when we're especially talking about salt season?
[53:55] Yeah, I'm I'm not sure I understood you.
[53:57] I mean, you say you have power washers underneath it.
[54:02] One Yeah. Is there a better system that does it a little better, a little faster than that particular one? And
[54:09] I don't think so. No.
[54:11] Yeah, it's that one's really not that old. [54:15] like a cartbased under wash. Yeah.
[54:18] Yeah. It hooks to a standard pressure washer.
[54:22] It's just got some wheels on it with nozzles going up. [54:26] and it's similar to what you're getting.
[54:28] It's portable. It's about as big as you can handle. You have to pull all that in every time you use it or else it will freeze. So, anything like the stationary car washes or truck washes that I've seen, and I haven't seen a lot, they're all they're all inside so it's heated so it won't freeze in the winter time. And so those you can drive over.
[54:49] And [sighs] [54:52] when you when a truck comes to the end of its useful life or you need to replace it, is it because of undercarriage rust or is it more engine issues or other issues? In other words, as we think about would this be a benefit to truck life? If
[55:10] it's it's all of the above. So,
[55:12] some of some replacements are due to frame rod or structural stuff from salt underneath.
[55:18] Yeah. It's
[55:18] electronics being affected by
[55:20] Yeah. wear electronics. [55:22] you solve, you know, washing better or more frequently might solve part of it, but it's not a magic bullet. There's still
[55:30] age to other components that cause a truck to need to be replacement.
[55:35] I think our older trucks now we're having a hard time getting parts for them. which you wouldn't think, you know, 13 years old it'd be hard to get parts, but it is
[55:47] manufactured.
[55:49] Yes.
[55:50] So that's why that's why you can't get them. They want you to buy a new truck.
[55:55] A lot a lot of a lot of product is not made in the US either. So they're dependent on manufacturers outside the US. And [56:05] so would you would you feel that the current setup of kind of your current thought process on Chase's Pond Road being administrative headquarters if you will work heated garages workard at A10 US1 never mind Rogers Road which I know is a little postage stamp but it's still another third facility
[56:26] that th that kind of mix would allow kind of peacemail expansion as needs are identified in the future. So for example, truck wash facility,
[56:37] yeah,
[56:37] you could say, hey, which of our facilities is the best place to put that? It should go here and then we develop it there as opposed to that. This doesn't rule out any of that.
[56:46] It should all be in one spot,
[56:49] right? We have an overall site plan for US Route One. So we could you know, if we did a truck wash, that's already located on this site. So you mean you have a location for Yeah.
[57:00] So we could we could put that in where if we do an expansion or I mean a new building later it wouldn't
[57:06] hinder that. You know this truck wash we do that wouldn't it be in the correct spot.
[57:10] So not doing it all at once isn't
[57:12] isn't
[57:14] crippling you in any way shape or form. It lets you move forward
[57:17] as needed. Yeah. I don't I don't see a reason why we couldn't peace meal some of it. you know, you're not going to half bill.
[57:22] Make sure we get all the reasons out for not doing a high tens of millions of dollar public works process and no one thinks we're missing the boat on,
[57:30] you know, we'd have to break that out, see what we could peacemail meal, what we can't, and what each phase would cost, I guess, if you want to term it like that.
[57:40] Let's go to equipment.
[57:41] Okay. so I'll lead and then Matt can finish here. We'll start. How about the front end loader? this was on the ballot last year. it was defeated. we still we still need it. It's a this new loader would to replace a 1988 frontend loader that has served us quite well, but again, it's so old now it's very hard to get parts for.
[58:03] It's getting kind of unreliable. so I'm asking for 260,000 to replace this piece of equipment with a new one. For those of us [58:17] lay people, is there a better or a different word for loader that as I think about the voters like did they even understand what a loader was and maybe they thought it was a add-on piece of equipment? I don't know. I'm just
[58:32] They call them front industry calls him a frontend loader. The industry calls them a front end loader. But for those of us who aren't in the industry, a loader is I just throw that out in terms of
[58:50] should
[58:51] Yeah.
[58:52] Is it a is it a tractor? Is it a
[58:54] just won't fit on the ballot.
[58:56] It's [snorts] a front end.
[58:57] It's not a It's not a
[58:58] It's not a
[58:59] It's a type of tractor, but it's
[59:02] it's its own category. Yeah.
[59:04] Yeah. It's meant to just it's meant to
[59:07] What's the What's the etmology originally? Payloader and then front end payloader because you put payloads onto trucks with it and then it's just truncated to loader now. But
[59:17] I do think a photo in the voter guide would be useful.
[59:21] Yeah,
[59:24] it drive it to the high [laughter] school.
[59:27] It's a good strategy. Problem is Matt does a good job like keeping this thing bailed together. So
[59:35] Oh, I know it is. But yeah,
[59:37] it's as old as my oldest son.
[59:38] You can't see [laughter] the custom paint job anymore.
[59:43] The orange yellow the school bus yellow spray paint rattle can. Yeah,
[59:47] that's why you ride it in the parade. We
[59:51] So
[59:53] real quick, [laughter]
[59:57] has bought
[59:58] the town has purchased at least
[1:00:01] another loader with the money we've spent on it in repairs.
[1:00:06] Yeah,
[1:00:07] at least one.
[1:00:10] It's not worth it. It's throwing good money off the bad.
[1:00:14] loading trucks
[1:00:15] dayto-day basis. Beautiful salt stuff we put out. Yeah. Salt and trucks.
[1:00:19] Use that to load the bigger trucks.
[1:00:21] Yeah.
[1:00:22] Yeah. And we take it out on the road. And two of the loaders we have, we have three have forks. So whenever we have deliveries, we use that to unload deliveries. We use that to load culvert pipe. a lot of times they'll have a loader out on the road and we need one at the shop so that we can load culvert pipe. [1:00:43] catch basins, offload deliveries of sign stuff, repair stuff for me, and load trucks like gravels and all that.
[1:00:51] And it's a snow removal tool to get to bucket snow into push back in push back intersections.
[1:00:58] Can we quantify the amount that we spend on repairs in 2025 and 2026?
[1:01:03] so off the top of my head, about 45,000
[1:01:10] over the past two years. two years
[1:01:13] close to 50 grand.
[1:01:15] Is there definitive enough information, I know you're like a scientist with your data to be able to put that into the voter guide? And is there a philosophy of not allowing that kind of data into the voter guide?
[1:01:31] We you could say we as a reference that the town has spent I mean it's a factual piece of information,
[1:01:38] right?
[1:01:39] Plus Matt's time Right.
[1:01:41] Yeah. I mean, we could
[1:01:42] I don't track my time,
[1:01:44] but and some of it I've had to subcontract out.
[1:01:50] And some of it was done I mean, it's a 1988.
[1:01:54] So, a lot of things were done before I
[1:01:57] before computer records existed.
[1:01:58] Yeah. Before I was even there.
[1:02:00] Even a two-year even a two-year I think would be helpful.
[1:02:04] Or you say this is, you know, parts only does not include labor. Positive labor.
[1:02:09] Exactly. typical cost has been this and is expected to run similar in future years if not replaced.
[1:02:16] Yeah. Where it's Yeah. I think the industry standard is 10,000 hours on a machine like that and that one's got 22,000. It was on borrowed time. I mean
[1:02:25] there's another data point.
[1:02:26] Yeah.
[1:02:27] Right. And it's I mean 1988 not everybody like does the math. So then you put in parentheses 38 years old.
[1:02:35] You know I was five years old when you guys bought that. [laughter] He's in better shape than I am.
[1:02:43] Now, if you can get people to read the voters's guide, that's going to be a big one this year.
[1:02:50] Very big, right?
[1:02:53] That's also something I mean, DPW does a great job with social media. That's a great Those are some great
[1:02:59] things that you could put out there on social media if you have those facts that are truthful to be able to say, "This is why we're asking for a replacement."
[1:03:07] Yeah. Also, the quote I see is it's for 250, but it looks like expires January 17th, 2026, right? So, you're anticipating it'll be a little more expensive because we had to delay. Okay,
[1:03:17] that was the Yeah, last year I was asking for 250. This year 260.
[1:03:21] Thank you.
[1:03:21] Y
[1:03:23] good on that. how about the bucket truck replacement?
[1:03:29] so we right now currently we have a 2010 bucket truck. and when I say bucket truck, that's you know, person to go into, go up in the air. It also has a augur and a crane on it. And this is primarily used for sign installation, repair. we do also use it for a little bit of roadside tree trimming,
[1:03:51] but the bulk of it is a sign truck. this one we purchased used. It's it's served us well, but it's it's getting old. it's a little bit of a safety. There's no the seats are they're pretty they're solid seats. There's no suspension in the seats. These things ride rough, especially in the winter.
[1:04:12] So you know, we have had some aches and pains and things in this vehicle. It's really should be replaced. There's other parts that are wearing out and I think might be some parts that are getting hard to get for this. is it
[1:04:29] you say the town operates a single bucket truck and used as needed? Is this one the single bucket truck?
[1:04:36] This is our only bucket truck.
[1:04:37] Okay, that's what that means. Yeah.
[1:04:39] So, if it goes offline, there's no backup.
[1:04:41] No fire truck, I guess. Maybe.
[1:04:45] No.
[1:04:46] And used on an as needed basis. What kind of what 's the thought process?
[1:04:50] They use it every daily. Yeah.
[1:04:53] But it's not assigned to a route. It's to do
[1:04:56] thinking about the voter. Oh, well, if it's only as needed, then it's discretionary, right? Or it's not a it's not a it's not a core piece of equipment, right?
[1:05:05] It's used daily.
[1:05:07] Yeah. So, as you think about further communications about this, I don't know that as needed is the best.
[1:05:13] What were you thinking, Tim? [laughter]
[1:05:17] Well, good feedback.
[1:05:18] Even though now I see that. Yeah. Okay.
[1:05:20] Yeah. So, it's used.
[1:05:21] You remember writing that in there?
[1:05:22] I don't. Yeah, it's used daily
[1:05:25] hopefully
[1:05:26] like somebody else that was someone else that was spiffing up your documents might have wrote that in there and got you subjected to
[1:05:32] the select board's eye.
[1:05:33] It's okay.
[1:05:34] Guilty party. So
[1:05:35] I just think it's really
[1:05:36] a list of some of the tasks done would be helpful. Obviously you know there's contractors that do tree work and there's you know there's the power company does but you have specific
[1:05:50] this is primarily for sign replacement installation.
[1:05:53] Okay that's good specific. Y
[1:05:57] this truck it digs it has a post hole digger on the crane so it can it can actually drill a hole in the earth 4 ft down and then but that same crane the hydra the air operated postp pounder we have to tow an air compressor behind it but to drive the post into the ground to the required depth and in Maine we have some ledge and different things like that they use an air operated jackhammer
[1:06:23] and we put We put the crane on. We bought the truck used and we kind of made it into what we needed and the postp pounder is about 100 pounds. So a man holding a 100 pound post. We used to do it on a ladder, different things like that.
[1:06:44] This truck has like a
[1:06:46] So we use the crane.
[1:06:48] We used to several many years ago, right? Many years ago, man. Yeah.
[1:06:51] 24 months ago. [laughter] holds the 100 pound air operated postp pounder and pounds those U channel posts into the ground that we apply the sign to. But then the post hole digger also drills the hole for the 4x6 post that you see sometimes. So
[1:07:09] and then the bucket truck we use
[1:07:11] is the bucket
[1:07:13] separate
[1:07:13] boom separate from the separate.
[1:07:15] Okay. So
[1:07:16] does this live outside at Chase's Pond Road? No,
[1:07:20] it lives inside at US
[1:07:22] A10 US Route one
[1:07:23] half and half.
[1:07:24] Most of the time it's it's kept in the lower building at Ru one.
[1:07:28] Good. Because it looks like Yeah.
[1:07:31] It's complicated.
[1:07:32] Shop.
[1:07:33] Yeah. Yeah.
[1:07:34] In conjunction with the sign shop. Yeah,
[1:07:36] makes sense.
[1:07:36] Yeah. It stays out It stays out in the summer a lot because in the summer they put the paint machines in undercover at night and they're using it every day, but in the winter it'll go inside. Yeah.
[1:07:47] Yeah. And again, I would just say I really appreciate your like we'll deal with it attitude and these are safety issues that impact workers comp that impact, you know, worker retention and I think those things really need to be included in the writeups. Don't be afraid of that,
[1:08:06] the human side.
[1:08:07] Yeah. Because I do think that's really important to be considering. And
[1:08:12] something Matt triggered too was the so the air supply for the for the postpounder The new truck we're asking for would have an onboard air compressor, right? This one doesn't have that. So, we have to tow a trailer air compressor around with it, which can be cumbersome and a little, you know, if you get to a dead end road and you need to try to back that trailer around in this big truck.
[1:08:32] [1:08:33] but it's also more work, right? It's also more hours.
[1:08:36] Yep.
[1:08:36] And it's another piece to maintain that's getting to be 20 years old. So,
[1:08:41] so is the combination of functionality for the truck with the bucket and the sign installation equipment, is that still the right mix moving forward or is there any
[1:08:53] I'd say yes. I mean, we obviously we 'll tweak it a little bit. It might not look exactly, you know, a new truck probably wouldn't look exactly like this truck, but it'd be pretty
[1:09:01] better.
[1:09:02] Those are kind But those are kind of limited uses that there's not a conflict to having them on the same vehic There's a benefit to having them on the same vehicle, Swiss Army knife style, as opposed to
[1:09:13] the Yeah.
[1:09:14] Yeah. There's a total benefit. I think
[1:09:18] we worked with what we got. We got a used truck. So, I think if you bought one brand new, it would be much more efficient and streamlined if we had that option, but we had to take a used one.
[1:09:32] But you would still This is
[1:09:33] the functionality.
[1:09:34] We do a combination of something.
[1:09:36] I don't know what you look exactly like that.
[1:09:39] Okay. Yep.
[1:09:40] Thank you.
[1:09:46] All right. a patrol plow truck replacement.
[1:09:53] This is the truck that you see on the on the capital plan pretty much every year. so for this year we're asking for 295,000
[1:10:05] and this would be to replace a 2016 patrol plow truck. the good news on this is it's we're asking for the same money or maybe a thousand or so dollars different than last year. The price is the prices have actually kind of held on this for whatever reason and our tradeins are worth a little bit more. So, I'm comfortable that we can
[1:10:29] [1:10:29] do we buy one every year or what's your replacement cycle?
[1:10:32] We try to do one every year now. We do have if you look at that equipment guide that I
[1:10:37] Yes, I love these. Thank you. there are several that have the same the trucks are the same year and that's either because of a vote or because of lack of supply. So by the time we placed an order for one year and then the next year we order it again. The trucks wind up being the same model year. but we do try to replace one pretty much every year.
[1:11:00] And how many do you have?
[1:11:02] We have 11.
[1:11:03] We have 11 six wheelers and two 10 wheelers.
[1:11:06] So 13. So lifespan is about 12 years.
[1:11:09] That's what we shoot for 12. A lot of times it winds up being 13. But
[1:11:13] yeah, by the time it gets into service, it's about 13.
[1:11:20] So on these, are line routes. Each one corresponds to a plow route and you're sized. You're you're kind of sizing on how many trucks you need in the fleet is driven. That's your peak that determines how many trucks you need is how many plow routes we need. Heavy plow routes. And then
[1:11:37] [1:11:38] would you say they're half used in the summertime as heavy dumps or three quarters of the time?
[1:11:43] Three quarters.
[1:11:44] Yeah, at least three quarters.
[1:11:46] So pretty consistent usage on plow and off plow season.
[1:11:49] Yeah.
[1:11:50] You know, off plow season we can kind of get away with one's broke down there's some usually another one to grab or something like that, but in the winter they're they're counted on you know 100%. So when one's down, it's some another truck that's going to double up on a route while that truck is down trying to repair it and get it going.
[1:12:08] That's why Matt can have one week of vacation in the summertime only and not in the winter time.
[1:12:13] No,, no real spares.
[1:12:15] Yeah.
[1:12:16] So, this brings up another point about the potential truck wash. What I just heard you say is that we're starting to see that we're starting to get better value for our tradeins. So even if we looked at it the business case from the perspective of maybe it doesn't lengthen the time we have a truck but maybe it increases
[1:12:39] the value our trade in value by 10 to 20%. That's meaningful.
[1:12:45] They're going to want to see some data or get some gather some data on that to see if that's
[1:12:50] would do that.
[1:12:56] white medium plow light truck. next.
[1:13:00] Yep.
[1:13:01] There's a pause. Just keep going. [laughter]
[1:13:06] So, this this one was on the ballot last year. This is for a what we call our medium plow truck size. This is a F550 size truck, which has a plow and a wing. it can't do everything that the big truck does, but it can do a lot. So, we use this on the off you know, side, not side roads, but the off roads that are not main routes.
[1:13:30] you don't need to have an employee with a with a CDL license for this vehicle. So, that's kind of handy. so we're looking to replace a 2014 F550 truck, and we're looking for 190,000 to do that. That would be completely outfitted with snow removal gear, plow wing, you know, salt body. [1:13:52] yeah,
[1:13:54] that's referencing to the to the system.
[1:13:59] There's a lot of little small town roads.
[1:14:03] Yes, there is spread all over, of course.
[1:14:05] And with the plow wing, it's very efficient because you can with a pickup truck, you're doing four, you're doing two passes each direction. So, four passes. This you can do just one pass each way.
[1:14:16] That's a 250. Yeah. And then your last one is
[1:14:22] this one,
[1:14:23] the multi-ervice utility tractor aka sidewalk plow. this one also was on the ballot last year and failed. So, we're looking to replace a 2004 tractor that's served us very well, but it is way past the end of its life cycle. This is our second machine like this.
[1:14:44] We have a primary we have we have a newer machine currently. This to clear the snow of sidewalks in the winter. Our inventory of sidewalks is getting long enough now that we really need two machines going to do it in a timely manner. this machine if it wasn't broke down for all of last season it was most of it and we were receiving a lot of calls about why aren't the sidewalks done.
[1:15:08] I just had to say because we only have one machine and if it's a heavy snowstorm to clear all the sidewalks with one machine is was Greg 16 hours
[1:15:19] at least 12. Yeah,
[1:15:20] say 12 to 16 hours. So, and we also don't have extra employees. So, now we're putting someone after they've been out plowing for who knows how long now we're putting them in a sidewalk machine to clear sidewalks
[1:15:32] with overtime.
[1:15:33] Yes.
[1:15:34] Everyone's working. Well, or it could be depending on the day. It could be straight time, but with without sleep is probably the more.
[1:15:42] Yeah. So, last winter you effectively only had one.
[1:15:46] Yes.
[1:15:47] Do you anticipate that'll be the same situation this winter?
[1:15:52] Yes. You don't think it's going to be zero?
[1:15:55] If the 2004 tractor remains out of service, I guess is the question.
[1:16:01] Yeah.
[1:16:05] This is not just a nice to have. This is this is you talk about safety now and people are out walking
[1:16:12] in the road on icy roads because you know you can't get to the sidewalks. It's pretty
[1:16:19] important. We looked at alternatives. I know you did most of the work by we. I mean I looked over your shoulder while you were pulling your hair out over this. [1:16:28] alternatives for the specific equipment. The weather cycle it operates in, the duty cycle being super heavy duty because it's running
[1:16:36] Yeah.
[1:16:37] 10 to 12 hours at a time. It's I mean it's heavy duty diesel equipment. I don't know if it's diesel, but it's heavy it's heavy duty equipment that's built to that spec. people. I think part of the disconnect is people looking at it and being like, "Hey, my snowblower, I got a really nice one that mounts to the front of my garden tractor with a cab and all that whole setup together cost me $40,000.
[1:16:58] Got heated seats, hand warmers, you know, you got luxury snow removal equipment
[1:17:03] for non-commercial use and then they look at this and see 250. So,
[1:17:08] it's a huge it's a huge jump. And so, what are the some of the alternatives?
[1:17:11] Very different piece of equipment. What people need to remember is that Most of the sidewalks that we're maintaining during the storm, all the snow from the road goes onto the sidewalk. So, you have all this salt mixed, slushy snow that is probably frozen over the course of the 12-h hour storm or however long.
[1:17:32] so you need a piece of equipment that can remove all this snow that's been pushed up there during the, you know, sometimes you're four or five foot high snow banks with ice chunks and everything in it and your garden tractor is not going to touch any of that. so this is a very specific and high horsepower heavy machine to in a skinny machine.
[1:17:55] So it 's it's very unique. just I last year when we received the price because the price has gone up significantly on these I was looking for alternatives and there 's a couple different brands but the say two or three brands that would do this job are in the same price range
[1:18:13] to try to save some money there's really nothing that I feel is out there that would do the same job.
[1:18:20] Not to get snarky or are most of these made in the United States? Most of these are made in Canada, I believe, right?
[1:18:27] Or overseas.
[1:18:28] That's reflected in the price.
[1:18:30] Canada or overseas. Yeah,
[1:18:32] I hope so.
[1:18:32] Asian manufactur [laughter] European
[1:18:37] it changes, you know,
[1:18:40] tariffs going to be different tomorrow.
[1:18:42] Some of these companies it they've been sold to like so bigger corporations have bought them and that's why some of the prices have gone up
[1:18:51] like trackless.
[1:18:52] Yeah. Yeah. Is that like Bombardier Group now or something?
[1:18:57] No. I actually don't know. I just know they've been sold and the dealer for them was the dealer for our plow trucks that just shut its doors cuz they were swallowed up by a larger company and then that company ran them down into the ground and they're gone now. So would
[1:19:18] yeah, my concern with only having one from a standpoint like the ultimate goal of having them is to maintain customer satisfaction by keeping your sidewalks plowed. Well, if that one machine goes down, sort of like a sidewalk mower and I'm, you know, waiting for parts from another country or and like sometimes I'm a couple of weeks
[1:19:44] getting it repaired in between everything else. So
[1:19:47] now, so that's and you can't run them.
[1:19:50] So it's that's from my point of view, that's where we're h
[1:19:55] what's the year on the newer one?
[1:19:58] I want to see
[1:19:58] 21 2021
[1:20:00] 21. So it's at five years old.
[1:20:03] It's got good reliability, but it's but that doesn't mean there can't be a part that breaks any given day that like when I'm thinking in my mind I got on the door first starts to age
[1:20:15] it took delivery.
[1:20:16] I mean this is a pretty this these numbers are huge. I understand the costs are huge but the but having two of these in a in a sidewalk network the size that we have to maintain is not
[1:20:27] it's not
[1:20:28] it's not unusual. miles of sidewalk.
[1:20:31] No, it's a I think it's at this point necessary. So your So your pl your typical plow route, we've went through this before. You might not have it off the top of your head. Your [1:20:42] 10 12 miles
[1:20:43] 10 12 miles for a plow. So that there's a good indicator. So the 13 trucks that we have, the heavy trucks, right, and maybe the medium ones, but the Tim just said the typical plow route being 10 milesish, that obviously the faster ones might have longer to try to keep them in the same schedule. The slower ones might be shorter, but you're talking 14 miles, Greg.
[1:21:03] Is that what you said? For
[1:21:05] for sidewalk maintenance, that's not [1:21:09] and one of the some of the sidewalk. So some of the sidewalks is one pass,
[1:21:15] right? Some sidewalks because they're wider now are becoming you can't
[1:21:19] you can't do sidewalk and your wide sidewalk with the same machine.
[1:21:24] Yep.
[1:21:24] You know, you got to make two passes.
[1:21:28] So, I mean I don't think it's unusual with the length of
[1:21:31] route that we have to be talking about two machines. twice
[1:21:38] as fast.
[1:21:44] [laughter]
[1:21:46] Yeah,
[1:21:49] Greg doesn't need a microphone. You can just
[1:21:52] and just for just for knowledge, too. So the 2020 machine or 2021 machine I have that scheduled for replacement in 2035 which is
[1:22:02] 15 years which is about I feel about
[1:22:05] five years too long
[1:22:06] for [laughter] a piece of machinery versus we 're looking at replacing you know 2004 in 2027.
[1:22:14] We got the honest answer and the political filter sitting right side by side. [laughter]
[1:22:18] You guys should be a duo all the time. So
[1:22:20] this is a great relationship.
[1:22:22] Yeah. So 23 years is definitely way [1:22:26] too long.
[1:22:26] If 10 if 15 years is five years too long, then what's 23 years mad?
[1:22:32] A lot too long.
[1:22:33] Well, it affects my operate my operating budget like when you talk about, you know, the common theme in a lot of this stuff is we want to save money and extend our money. But if you're putting thousands of dollars into old equipment, that's really not worth it. And even after you've put So, okay,
[1:22:54] like that 1988 wheel loader, we put $40,000 in two years and you can't tell I spent $40,000 on it.
[1:23:02] The average person can't look at that and say it's any better.
[1:23:06] Yes.
[1:23:06] Or safer or anything. It's just functional. But it came out of my budget. No, it's not my budget. It came out of the town's budget. Forgive me for saying my budget.
[1:23:17] You're responsible.
[1:23:18] Okay. If I lose an engine,
[1:23:20] I would rather I'd rather have $40,000 like in a bank account. So, if I lost an engine in the middle of a snowstorm, which has happened, and they're 50 grand to do.
[1:23:31] but I spent that on a 35 year old loader. I don't have it.
[1:23:38] It's frustrating.
[1:23:41] Thank you guys. Oops. Thank you.
[1:23:43] Oh,
[1:23:44] I think so. any [clears throat]
[1:23:46] Can I just ask one last question?
[1:23:47] Of course.
[1:23:48] So, there were
[1:23:48] probably ask like three more questions. Yeah.
[1:23:51] suggestions on the writeups and I'm just wondering if when they go to the full select board and to the budget committee if they're going to include some of these edits or because I think you're going to get the same line of questioning in each committee. So, if you can make some of those updates, I think that would be really helpful.
[1:24:08] Sure. Think the budget committee will ask the same questions?
[1:24:13] Yes. [laughter]
[1:24:15] Actually from the same person.
[1:24:16] Oh, okay.
[1:24:18] Talk about efficiency.
[1:24:20] Yeah. No, we'll
[1:24:22] All right. Thank you.
[1:24:23] Thank you.
[1:24:29] You can you can mine. I got it. Tim,
[1:24:33] yeah, no problem.
[1:24:34] There will be gentlemen.
[1:24:39] Oh,
[1:24:41] gets to go in front of the fire department. Every single budget meeting has to wait for somebody. It's pretty rough, isn't it, Chief?
[1:24:48] Very difficult.
[1:24:49] Oh, are we are we on this? Are we changing the schedule as of this moment that you're waiting and fires going first?
[1:24:58] Time penalty.
[1:24:59] Just one just one.
[1:25:03] Look at you. Slim.
[1:25:04] So, you've got the vehicle schedule.
[1:25:06] Yes. yes, we might. Yeah, it might be.
[1:25:11] There you go.
[1:25:17] I like this new format.
[1:25:18] Yeah, the Yeah,
[1:25:19] these are great. I was going to ask this is new. This is awesome.
[1:25:23] Heads followed the instructions. They did a very good job. I won't say who didn't, but they know who they are.
[1:25:29] Takes time. Yeah, it takes time, but this is awesome.
[1:25:31] You did great. [laughter]
[1:25:33] There's others. Yeah,
[1:25:34] there's others.
[1:25:38] All right, this one's pretty straightforward. looking for $130,000 for our police vehicle account. that would be to replace three cruisers. you can see basically our replacement schedule moving forward. I think that's relatively conservative.
[1:26:01] a couple of things I will say that the assigned vehicle program has been going really well. we are at full staff. our accountability of equipment has gone through the roof. We know exactly who's driving the car. I think your analogy was spot on way back when you said you drive a rental car a lot differently than you drive your own car.
[1:26:22] the officers are taking a lot of pride in it. you're starting to see some other agencies really look at this as a way for recruitment and retention. I will say that some of the ancillary benefits is that our overtime was down from previous years due to the fact that we were at full staff. Our response time when
[1:26:44] we need to call people in because we have an emergency has increased dramatically. our ability to [1:26:52] can you talk about how that works just for anybody that's watching the over the response time impact of this because we danced around that a couple times but
[1:27:00] sure well a few things right off the bat when our officers go on duty they're immediately on duty as soon as they leave their house so we're seeing traffic stops increase on those shift change times [1:27:15] now people who live next to a police officer actually need to go the speed limit
[1:27:19] yes unfortunately [laughter] I'm sorry about that. But but we've also seen it too where our officers are on the road at shift ch where we used to have shift change. one example that I've used several times, you probably have heard it is that we did have an individual on one of the beaches. Our officer his he actually lives in area one. The beaches are in area two.
[1:27:40] That was his assigned zone for the day. So before he went home, he was just going through the beach area where someone needed CPR and he was there immediately where you know if he had been at the station it would have been a 15-minute response time for that. We also had the incident
[1:28:00] and I've used this cuz it's pretty clear is when we had the individuals that we arrested for the homicide that occurred down in Texas. our shift was taken up with that and then we had a domestic dispute and a violation of a protection order. one of our officers, you know, he responded to the protection order within 5 minutes where before we'd be calling outside agencies, we'd be calling other officers to come in.
[1:28:26] so it's just greatly increased.
[1:28:29] Was that directly from home or coming on or off shift or
[1:28:32] was directly from home. We called them at home. They threw their uniform on. when they were in their cruisers and could respond right to the scene instead of you're driving to the station, you go to the locker room, you change up, you then have to find a car and sometimes if we had major incidents, I remember getting called in as a patrol officer and I'd get called in, I'd show up and there was no cruisers there. So then we
[1:28:51] to get that mountain bike, right?
[1:28:52] Well, we drive in our own personal vehicles and then, you know, get out, but we didn't have, you know, all the equipment that we needed. so again, it's been a great morale boost. It's been great for recruitment and retention. I will say that I was really surprised that I'd be asking for 130,000 last year. we decided not to move forward with the 130,000 request and it actually worked out really well.
[1:29:18] There was some cars that I anticipated because if you look at this schedule, the unit numbers, if you see like 83 down to 95, those are cruisers that those are cruisers that were shared vehicles prior to and now are just assigned.
[1:29:38] I knew the second, sorry to interrupt you. I knew the second he said that where you were going to go with that.
[1:29:42] Yeah,
[1:29:42] Mr. Bomber. So, so I was thinking that I was going to have to replace six vehicles this year to get on track. we are fortunate some of the higher mileages that have gone to single operators are holding up and the repair costs aren't what I thought they were going to end up being because again, you're going down to one driver.
[1:30:04] Even though the engine hours are high and the miles are high, we're seeing that we can extend that beyond the 100,000 miles that we used to we used to have to do.
[1:30:14] I see in your schedule you've got some two-year two unit year replacements in 28 20 I mean these are just forecast
[1:30:22] obviously but 28 29 31
[1:30:26] maybe that's all 31. You've got some two per year replacements which is lower than what you initially forecast. You thought you were going to be doing three every year when we went to this program a year and a half ago, right?
[1:30:36] Correct. And one of the things here is, again, I've I'm conservative on these. I think there's a real opportunity to see these cars go up to 140,000 miles.
[1:30:46] And that's what I'm hoping. the cruisers that we're talking about right now, one of the vehicles isn't operable. It's basically parked out back to repair costs. it was one of our spare vehicles. [1:31:01] which number is that?
[1:31:03] the that one is
[1:31:10] 89. The other spare vehicle that we have is 90. and that one, you know, we can we can bring that to detail. That would be like an outside detail like a traffic post where I'm not expecting, you know, you to have to respond to emergency calls for service. you're basically driving that to a construction site and using the blue lights for safety.
[1:31:34] the other vehicle that we're looking to replace is that's 86 right now that's operated by Jordan Oaks. She's on our tactical team and so she has a tremendous amount of gear in those in that car and we need her to respond immediately to those types of calls for service. and we're starting to see some mechanical issues with her vehicle.
[1:31:57] And again, that was one of the vehicles that was a shared vehicle that was then assigned to her. So, those are the three cars that I would be looking to replace.
[1:32:08] And this is mileage at the end of the calendar year. So, if this is approved for fiscal 28, we would be buying those Oops. Start over. So, this chart is anticipated mileage at the end of the calendar year.
[1:32:31] And if you were this is approved, you would replace these three vehicles. If this was approved for the fiscal 28 budget,
[1:32:41] correct?
[1:32:42] You would replace these during calendar year or towards the end of calendar year 27.
[1:32:48] Correct.
[1:32:48] At which time they would have approximately these amounts of mileage. 20 plus.
[1:32:55] Correct. Yes.
[1:32:56] So when you replace them, if this is approved, they would be at that level. And one of them is already non-operable.
[1:33:03] Correct.
[1:33:04] So you would be replacing that one, a spare, and then Jordan's with high mileage.
[1:33:10] Correct. And what I would end up doing and the way this chart is going to
[1:33:14] and the following year you would have two vehicles that would end would you expect would hit the 120 plus miles.
[1:33:22] Correct.
[1:33:24] Thanks. [snorts]
[1:33:28] Good job. Thank you, Chief.
[1:33:30] This is good.
[1:33:30] All right.
[1:33:33] your schedule as an example for every committee or every person that comes in here with a vehicle budget. I just like I love the way this is set up. I just think it's so organized and it's clear
[1:33:45] gives us the long term.
[1:33:46] Thank you guys and the public works as well for having the charting that out. It got really easy to see once we started doing that. So, do you want to talk not to drag us on? Hopefully the answer is no. What long-term capital needs? This is a year one request. [1:34:01] I'm sorry, Chief. All right. I need I have an electrician on the way. You can't keep electricians.
[1:34:05] Well, the good news is I'm not going to throw any big surprises that I'm going to be asking for a $40 million new police station or anything like that.
[1:34:12] Now that Select Board member Palmer's gone, can we talk about what the real request is for police vehicles for next year? So,
[1:34:18] yes, I'm going to need $1.3 million.
[1:34:20] Got it. So, building maintenance specifically, we've done a lot of building maintenance projects. Can you talk about the condition of the station, long-term needs, that kind of stuff? Yeah, I we're in a we have a one challenging our fire suppression system isn't isn't working correctly and the overhaul to that system is about $50,000.
[1:34:44] So, we need to replace that right away. So, I didn't have the opportunity to ask for a capital item. So, we're going to have to utilize some of the building maintenance fee that we had gotten that we were planning on doing some upgrades as far as painting and pressure washing the building and things like that. So, we'll have to put off some of those to offset the cost of that fire suppression system.
[1:35:06] But moving forward with the capital items, you're going to see cruisers pretty consistently. unless they decide unless you folks decide to put that into, you know, an operating budget. but what's happening in law enforcement is you'd see a lot of capital requests would be like watch guard cameras
[1:35:27] or cameras, body cameras, and most of those type of systems are going to a subscriptionbased where you're purchasing those on a 5year payment plan. After 5 years, you're getting the upgrade because the technology is always changing. So,
[1:35:47] again, that's, you know, a lot of times we're already entered into that. body cameras is the biggest thing that you know obviously I 've made it very clear that you know it's very important for us to get one of the issues with bodywn cameras is that they're all AI enabled so with the current [1:36:11] ordinance pending I want to make sure that anything we do would be compliant upon those you know because it is a large investment but I will tell you know the other thing that when you're talking about expenses with law enforcement, it's all technologydriven right now. I mean, AI isn't going away. criminals are using it.
[1:36:31] We have to, you know, stay very aware of it and have, you know, the equipment to identify when AI is victimizing our citizens. We have two officers that are specifically assigned to monitor AI type of events, whether it's criminal activity, whether it's our ability to increase efficiency in report writing
[1:36:53] or training. But again, they've done a really good job because so much is out there right now. you know, there's some training modules that are out there and that, you know, I've heard of other departments buying for $70,000 and they're already obsolete. So, you know, these two officers are doing a really good job of evaluating it, but also keeping us current.
[1:37:13] So,
[1:37:14] long-term building maintenance systems are in good shape other than the your fire suppression system. I know we did an HVAC overhaul,
[1:37:21] correct?
[1:37:21] Plumbing, electrical, perimeter of the building.
[1:37:26] Yeah.
[1:37:27] Walls, roof, weathertight, everything good. No major [1:37:31] no,
[1:37:32] no immediate long-term needs, maintenance needs that you're seeing.
[1:37:35] Correct. Okay. Yeah.
[1:37:36] How about that records management that you spoke to us about a couple of years ago and then the opportunity to maybe partner regionally?
[1:37:44] Yes.
[1:37:44] On that system. Where does that
[1:37:46] So that's that we're in the process of implementing that. That is we did partner. It's basically all of our PAP partners. So it's it's York Kery Elliot Aunquit Kabunkport and Wells. So, Wells uses Logically just like we do as for our cyber security.
[1:38:12] Wells has a larger IT room. So, they're going to be housing a lot of the hardware there. We're going to be the backup in York. And then, so basically, long story short is all of York County, the chiefs got together and we put together a group. So all of York County decided to go with Motorola Flex as the new records management system.
[1:38:34] So that effectively got us a better price point. but then what we realized is you couldn't have one major silo. You had to break them out. So Bifford is a silo, Sanford's a silo, and then York and Wells are basically a silo for all the towns. But Motorola Flex gave us a better competitive deal because
[1:38:55] you had all of York County York County a big ticket item is it now
[1:39:00] subscription
[1:39:00] that you're able to absorb in your operating budget.
[1:39:03] Yeah, it's again it's subscription. So we were very fortunate with that.
[1:39:08] I don't think it's well it's not all good. It's a cost. It's there's an impact and that was in this year's operating budget part of that right and it will be in next year's operating budget too. So
[1:39:17] correct. Yes.
[1:39:18] Yeah. I mean it's
[1:39:19] it's already big cloud that looming that it was
[1:39:23] correct. We were we were talking
[1:39:25] right it's not 700,000 it's 100,000 over 70 million something like that
[1:39:29] and now that has come down to and the nice thing about the subscription is then it's not going to be obsolete in 10 years because they're always making those improvements and then you get those immediately. So
[1:39:41] that's great.
[1:39:42] Yeah.
[1:39:43] However, there are concerns about ecosystem and being locked into certain technology that's compatible with other technology that we need to keep an eye on in that case. And I and again, I'll say Alex has been instrumental in really helping us out with this. He does a great job in just making sure that the whole network is secure and asking all those
[1:40:01] really important questions.
[1:40:03] Okay.
[1:40:05] Excellent.
[1:40:05] That all you need to talk to us about, Chief?
[1:40:07] That's it.
[1:40:09] Thank you.
[1:40:09] Thank you.
[1:40:11] Else you want to talk about? We're all good to go, right? We'll take a shorter one for now and we'll be back next Thursday.
[1:40:16] no Tuesday. There's Thursday for I think it's Thursday, right?
[1:40:23] Hold on. Let me make sure on the website before I say that of the schedule.
[1:40:28] I think it's Thursday and I think we got fire and some other You'll be talking about you be talking to me about several of the various town smaller town departments.
[1:40:39] Thursday is everything else before we move to schools the following
[1:40:42] if we can get through it. If not, we can get through it on the tail end. Everything else [1:40:47] so not Tuesday. Well, I'm just making I'm trying to pull
[1:40:49] I don't have it on mine, I think.
[1:40:51] Yes, just the next Thursday.
[1:40:52] Just Thursday. Yeah. [laughter]
[1:40:57] Yeah. So, So, yes. So, let's just talk about that real quick. So, Thursday. So, there's no Tuesday, but then we have Tuesday and Thursday the following week for school. So, the we were going to have next Tuesday, I think. And then we're going to do Tuesday, Thursday, Tuesday, Thursday for two weeks. But one of those two days the there's a school conference or something.
[1:41:19] So a lot of the school stuff isn't available. So we moved the town stuff to that public safety.
[1:41:24] Sure those are all on the town calendar because I didn't see the
[1:41:29] d I'll check it.
[1:41:30] The six should be [1:41:34] yep. So Thursday the 29th 10 a.m. here. Let's see. Is October not on there yet? that it might not have got added yet because it's or November might be next month's calendar. [1:41:49] yeah, 10th is on there. The [snorts]
[1:41:55] Yep. They're all on the website. So, third and fifth.
[1:42:02] Oh, fifth isn't on there, huh?
[1:42:04] I don't have it on the fifth.
[1:42:05] Okay, I'll I'll [1:42:08] I'll clean that up. Yeah, we have what's that?
[1:42:10] But it's not on the website. Yeah. Okay, you're right, Wayne. So,
[1:42:14] we are meeting on the 5th is the plan.
[1:42:18] Is that what
[1:42:18] that's in third and the 5th or the school in the email I sent out? Correct. Or did I Hold on. Let me go to my scent.
[1:42:26] I should have that right in front of me. I'm sorry.
[1:42:30] Go ahead.
[1:42:32] Yeah, of course.
[1:42:37] Working on the debt. that you would ask for.
[1:42:41] I will anyways we're next Thursday. I will confirm those make sure everything's on the website for the future meetings after that and we'll go from there.
[1:42:51] Oh, thanks Owen. Good job. We keep you
[1:42:54] Oh, so you're right. So it's the it's the 3rd and the 10th. 3rd and the 10th for school. So Tuesday and Tuesday
[1:43:04] school either one of those. And then I think we're going to do the I'll confirm this, but I think we're going to do the 19th instead of the 17th for the final meeting. So,
[1:43:14] thank you, Owen.
[1:43:17] Okay. we're we're adjourned at [1:43:21] good day.
[1:43:21] 11:46. Kim, thank you.