[0:00] To introduce Hazel, who is our board president, and she's going to now going to be our rep for the infrastructure committee. Hi, Hazel.
[0:09] Hi, I know I'm not
[0:10] I'm not for real, Wayne.
[0:13] I know Yeah, I know you know me, so I just want to take 1 minute and I'm going to focus on the role of the select board person in here is to liaise and facilitate communications with the select board. So, I'm taking that as a I'm not going to be hands-on. definitely not voting in the minutes for the I'm going to sit back and I and make sure that this committee you have what you need to do to do your work as a committee and be more
[0:43] of an escalation point and a if there are barriers and same with Shannon. So, I'm like this helps support her. I don't know anything about roads, but I got a background in directing people. and when I directed people, I didn't tell them what to do. I wasn't a micro manager. I said tell them what your problems are and how I can help them solve problems.
[1:05] That's nice music. I'm actually down a certified project manager. Same way I do have extensive background in planning and scheduling and budgeting and HR and communications and all the things related to project management. And like my recent job at state I just retired from I had a extensive background in procurement.
[1:27] so, RFPs and contracts were my and still are active as consultant for a little while for them. but so, RFPs and contracts were also my background too. So, I think there's some kind of synergies with what you do, but I'm going to be very hands-off. Tom said I can, you know, I can speak and I will speak if I if I need to, but I'm I'm not going to try and direct you on the work that you need to do and what you know needs to be done.
[1:52] I'm here as a support, not to not to be like giving a whole lot of direction unless you need it. If you want my opinion, you can ask for it. I'll certainly give it.
[2:04] And we will.
[2:05] Okay.
[2:07] Okay.
[2:08] [snorts]
[2:09] Anything else? All right. So, we'll roll right into the agenda then. The first thing is to request a motion to accept the minutes of last
[2:19] Make a motion to accept the minutes of September 28th.
[2:22] Second.
[2:23] Okay.
[2:24] And look at that. We wanted that one to one to [2:27] One to change I would make on those would be the eight 8:30 start time.
[2:31] Yeah.
[2:32] Yeah, that was my fault.
[2:39] Okay, so motion to accept as
[2:44] amended.
[2:44] as amended. Second.
[2:47] Second.
[2:49] All in favor?
[2:51] I.
[2:51] I.
[2:52] I.
[2:53] So, going right into the agenda. I had originally requested on the agenda that I had sent out that we get our a financial update from Shannon about where we stand money-wise,
[3:08] what we've spent and what we're going to what we're So, that means what we have available. So, if you would, please.
[3:14] So, since the last meeting, we haven't had any change to our capital reserve account yet. we did send out that one invoice that Paving Pipes had requested. And so, that leaves after we pay out everything, we'll have a balance of 369,000.
[3:35] Approximately.
[3:38] Okay. And do we have any contracts out that we haven't paid yet?
[3:45] That will be after everything is paid. We don't have any other
[3:48] Okay.
[3:48] So, that includes the payments to Paving
[3:51] Okay, great. And So, any questions about finances at this point? Shannon, did you make any decision on adding the gravel to the shoulders?
[4:04] Not yet. So, I do need to go get another quote. I did get one request from Heights. This was for the wide shoulder gravel for hard's gravel in Fairbanks only, and that was for 34,000.
[4:20] And so, we're I've got to reach out to some other local contractors and get another quote on that. As far as looking at specifications, I guess it would just be adding gravel and doing shoulder work. I don't know if there's anything more in-depth with that, but Yes.
[4:39] Okay.
[4:47] I think McGee might have one. We'll see what happens.
[4:52] [snorts]
[4:53] Well, my
[4:54] So, the question I've got then, the specifications, the town specifications say 2-in gravel. The town specifications say 2-in gravel. If we If we put an inch on I mean, if we if we put if we when we put the inch on, if we put 2-in gravel on that, those 2-in rocks are going to fall away.
[5:16] Should we Should we take the maximum dimension to be an inch?
[5:21] Where do we have a policy or
[5:23] It 's It's in We don't It's a There's a policy on roads, and it says 2-in. So, I'm using that as where I'm coming up with a 2-in for shoulders.
[5:37] Yeah.
[5:39] And I looked at it a long time ago. I can't tell you right where it is, but I know I've looked at it. But, should we leave Should we leave that 2-in policy on when we're doing shoulders that are only an inch thick?
[5:50] I don't think so.
[5:52] I don't either, but I'm That's my question to you to the committee.
[5:57] Should when we do the RFP, should we should we specify inch maximum?
[6:03] Inch minus, actually.
[6:06] As far as the material or the depth of the material?
[6:10] As far as the size of the material.
[6:12] Size should be 3/4.
[6:14] Okay, so then
[6:15] Crushed stone.
[6:16] And that's I haven't There's nothing specific for shoulders that I have seen in anything that I've looked at. So, then our recommendation is the changes to make the RFP say 3/4 minus.
[6:28] 3/4
[6:29] With
[6:29] crushed.
[6:30] Yeah, 3/4 crushed minus with the with the 12 to 14 or 10 to 12 fines. And we 've got it someplace in our language.
[6:41] Is that
[6:42] Is that your specs?
[6:43] Yeah. So, is that a recommendation that the committee approves?
[6:50] [clears throat]
[6:50] They don't say in here what they're putting for material. That might affect their price, too.
[6:55] Well,
[6:56] I see nothing on it.
[6:57] [clears throat]
[6:58] You've seen material?
[6:59] Yeah. So, one of the things that I did do when I was talking to Hazel was that the only thing that we vote on as a vote at this point is the minutes. Other than that, we go by consensus or recommend by consensus. We're not voting on everything that we do. So, what I what I do is I'll ask, "Okay,
[7:20] this is what I hear. Is this a consensus?" And that's then what we recommend to the town. Is that still okay with all you guys? Okay. So, then it will stay with that way. Hazel did say that if anybody doesn't like our consensus, we can do a minority consensus. So, you can have plus or minus and go both ways.
[7:41] And I had forgotten about that when I you talked about it. All right.
[7:44] So, you were saying 3/4 crushed gravel for all eight roads on the shoulder work, correct?
[7:50] Yes.
[7:50] Okay. And then for the
[7:52] in the past?
[7:55] What have they What have they used in the past?
[7:57] In the past we've stockpiled it at the salt shed and they take it from there and
[8:01] Well, okay.
[8:02] It's three. McGee's 3/4 inch crushed
[8:04] But did not we did not we The last time we did it, didn't we use Stevenson's 2-in?
[8:12] The last time we did it, yes.
[8:14] Yeah.
[8:14] Yeah. So, that's why I want to get away from that and go to the 3/4. It's going to be more expensive, but it'll stand a lot better.
[8:22] Okay. So, 3/4 inch crushed gravel on all eight roads.
[8:26] Okay.
[8:26] And then some kind of some kind of tool that creates the slope coming off.
[8:32] Shoulder widener and then back it and then compact. Shoulder widener and then shoot.
[8:37] So, a shoulder widening machine and compacted.
[8:40] So, are we going to Do we want to do 3/4 minus crushed? Do we want to specify that it's from a blast quarry or do we want to take bank run?
[8:51] I'd leave it open as long as 3/4 minus crushed.
[8:54] I'm just asking. Yeah. 3/4 minus crushed. Just asking. Okay. So, that'll take care of
[9:01] And 2-ft wide, correct? Okay.
[9:03] Yeah, plus I'd put a plus or minus.
[9:05] Yeah, because sometimes you're you're only going to get 6 in you don't want
[9:10] 2-ft out of places.
[9:12] Okay.
[9:14] Need anything else on shoulders?
[9:19] And financial updates. Okay. My question is where do we stand on Tempe Bridge?
[9:27] What do you mean?
[9:28] As far as we've we're 3 months into talking about a bridge that's been declassified. Have we done Has the town done anything yet to either look at or hire or do some kind of consulting work to come up with a final design on Tempe Bridge?
[9:47] We have not yet.
[9:47] Okay. So, that 's still in limbo at this point. Okay. That's my that was my plan.
[9:57] All right. Would you like one of us to get a hold of that somebody to look at that?
[10:02] So, Calderwood Engineering had already reached out and given us all those steps on what they thought. there's another contractor out of Massachusetts that works out of Bangor, I think. and New England and is another contractor or excuse me, an engineering
[10:23] firm. So, there's a couple of engineering firms that we can reach out to. It's a matter of putting out a request for specific engineering design. and then coming up with a timeline. And right now we have 50,000 in our capital reserve account overall. again, we discussed those three different options as far as repair,
[10:46] which would be putting potentially a slip liner in it, which is a short-term fix. A replacement that town would cost the town through a local contractor. and I think that was like 3 to 600,000. but did not require all the state permits. And then there was another one up to about a million dollars for the 100 year.
[11:08] But that would also probably include an expansion. And then there are funding options there. and the state can potentially support funding for that up to 50%. But there's a whole process that involves them getting into that. Are we looking at trying to hire a firm? Is that what you're ask like talking about is hiring an firm?
[11:31] That was one of the options that from conversations in here, there is a firm that we go to them and say, "We want a bridge put in. We want it to be replaced." And they do everything. They do the engineering. They do all They get the different areas where there's funds available.
[11:55] That's one of the things that we've taken away from here. The other way we can do it is if we if we in -house do everything ourselves.
[12:03] That's what Carl was doing though, didn't they? We got a name of Pine Tree Engineering. Also, that was the which I would at least call them to send to say. They supposedly engineer, find grants to
[12:20] Yeah, and we've we've heard good word I've heard good words about them, so
[12:24] Yeah, those local towns around us have used them.
[12:28] So, I think that 's what you know, one of the areas because my base feeling is we rebuild the bridge. We build the bridge. We don't do anything with what's there now.
[12:40] Yeah, that's
[12:40] Let's just take out
[12:41] talked about that before, but it's sort of one way.
[12:44] Yeah,, if it may be more expensive, but then if we if the town doesn't have any responsibility after the bridge is installed, if the state takes it over, I think it's worth the expense.
[12:59] Okay.
[13:00] I had previously decided we were just going to change it as
[13:03] Yeah, I think so.
[13:04] I thought we were going to go with the in kind like replace it with what's already there, but a new one.
[13:09] Right.
[13:09] So, it's that corrugated metal culvert.
[13:14] All right. All right.
[13:15] I have that under new business as a priority. Yeah, it's actually priority coming here, so that I didn't have it down under my list as a current priority. Just saving money to work towards it.
[13:25] Well, yeah, I was looking at what the status was and we just got carried away. So, we'll we'll come back
[13:31] How much is the air mark?
[13:33] 50,000
[13:33] 50,000
[13:34] Yeah.
[13:36] Okay. So, under old business, last time when we met, we there were three RF piece specifications that we were going to thought we were going to be getting drafts out of to go [clears throat] through.
[13:51] Tree limbing, road mowing, and road grading.
[13:55] I think the most important one right now is to go through road grading.
[14:01] We're not going to We do We will be doing tree limbing eventually. We will be doing road mowing eventually. But, right now we need to get the contract out for road grading.
[14:14] On the bottom of the
[14:19] Is it on the bottom?
[14:20] I have a question about that, but maybe Hazel can help us with. My understanding we just extended some contracts by a year. Did we extend the grading contract? But, we should be grading already, not putting out our RFPs.
[14:38] So, one of the things I'm working on is the purchasing policy. That's significantly revised. [14:48] and I'm trying to remember I can't remember what the current policy says versus what the new policy says. the options to the main contracts
[14:58] in both policies. And I think we'd look for a recommendation from the purchasing manager, which is the town manager. the best course of action was the best value for the town.
[15:16] Do you want us to extend it?
[15:19] This
[15:19] point?
[15:20] At this point, we're out of time. We put out our RFPs last year and snowed in November 16th. So, I would start before then.
[15:29] Or you can talk to our contractor and see if that's something that they'd be willing to do. In the meantime, I do have all of the comments that you did make in the last grading RFP at the last meeting. And so, that was just I have the verbage in here. I haven't incorporated it into it yet. So, I think that 's a valid point. to send it for a year.
[15:51] In the meantime, I will update this and get this to you. I just haven't done
[15:55] Okay. So, update it the way it is now. What the
[16:02] This is an extension that they'd extend
[16:05] Well, extend the extend the RFP that's in place now and not do any of the changes that we talked about.
[16:14] Yes.
[16:15] So, I think that's a recommendation that you should bring to the select board. Do we have time to do that?
[16:21] Yes.
[16:22] Good. So, does it
[16:23] next board meeting. I mean, I actually would like ready this week.
[16:26] Yeah. Yeah. So, does the committee agree that we make a recommendation that it gets extended for a year with the current contract the way it's read and not with any of the changes that we made in the past couple months.
[16:40] Yes.
[16:41] Okay. So, that'll put that
[16:43] Yeah, we make changes, it seems like there could be negotiation and the price and I think we just want to
[16:51] reiterate it.
[16:52] So, then
[16:54] If they're willing to agree, but
[16:56] Yeah. My problem that I have with doing it that is that then I view all received the email that I sent on Harshbarger Road, there are two rocks that are an inch and a half full with the surface of the road and they are at least a foot across.
[17:16] All right. do we just over place gravel on those? Do we put out a an RFP to have somebody come in and dig them out like we did on Hearts Gravel? How do we get rid of those rocks? Do we or do we try to do that this fall or wait till next spring?
[17:34] I'm pretty sure a few years ago that CH Stevenson went down through there with a hole ram and tried to get rid of some stuff and it didn't I don't know if those rocks were particularly
[17:47] Okay, can of worms maybe too.
[17:49] I don't know if those rocks were particularly part of that but that rock is was super hard. They didn't weren't very successful. So I think for right now we just need to leave them there.
[17:59] Okay.
[18:00] Add the material to all of them.
[18:02] So should we add material on top of them?
[18:04] What about
[18:05] Do we should we recommend to add material on top of them? Let me Let me get my wording right here. Should we put two or three inches of gravel on top of them because if they graded it the way it is now
[18:16] That's going to be
[18:17] there's going to be a hump in the road right there. It's on the shoulder and it's an inch and a half over the what's there. So what should What would we should be the recommendation from the committee on place where that there's rocks that are above us the surface of the road that can't be replaced?
[18:38] I'd add material for now. So we wouldn't start digging those out. We may be having a bigger project than we need. Plus isn't that where we need to do some work is by after Georges, right?
[18:48] It's between Georges and all Yes, it's it's after Georges between Georges and the God pasture there. Right. Yeah. And I don't know if there's any more on any other roads or not. I have with the seven miles of gravel road we have, I don't know if there's any more rocks or not. We have to think about that.
[19:05] particularly most rather than they
[19:08] It is.
[19:09] The reason why they
[19:10] So anyway, okay. So our recommendation is to just put 2 or 3 2 or 3 in of 3/4 brushed in there.
[19:23] Well.
[19:26] Yeah. Yeah, I guess. Yeah.
[19:29] There's a it'll be a it'll be on a length of road of about I'm going to say 200 ft to cover both of those at the same so we don't have any rises and falls.
[19:42] Okay, so the rec- the recommendation from the board from the committee then is to put 3 in of 3/4 minus gravel that meets the specification we used before. And then we'll put this on an agenda to look at next year or the year after to see if those rocks could come out.
[20:02] Do you know any of following are there any other place any other rocks on gravel roads?
[20:08] No, both. No.
[20:11] Okay. And I haven't walked any of the other roads so I don't know really either. Okay. So, that's on so on between George's Lane and
[20:24] I saw them when I drove down there last week. Okay.
[20:27] They don't really affect us much typically affect us much on plowing. They've been like that for a long time.
[20:33] Well, I know but it's a grading when they try to grade they're not going to be able to grade it. Because if they weren't sticking out then I wouldn't feel they are. The other thing that I would request that goes into that is that they don't leave any rocks on the side of the road that a car can hit.
[20:48] Right.
[20:49] In that same area in that same area a year ago when they graded they left a an 8-in rock in the ditch. Rather than pushing they could have pushed it off on the other side of the road cuz there's a big fill there. So, in on those rec- on those when you do the RFP, Shannon, don't leave anything in the travel way.
[21:14] Okay. All travel lanes will be graded. Don't leave anything.
[21:20] And you however you want to reword that, but just because it was like I said, there was an 8-in rock in there a year ago. And it was because there's no shoulder there and there's no ditch, it was right in the travel way. Okay.
[21:37] Anything? I mean, as far as rocks exceeding 5 in diameter or 4 in, 3 in?
[21:45] Well, what do you think? From a roadside mowing perspective.
[21:50] You know, we do our best with the roadside mowing those roads and you can't put your bar down where there's rocks or large behind. Especially if it's an area where grass is growing, you don't see them and you hit them and you stop. They should be thrown off the road.
[22:04] What size?
[22:06] All sizes, yeah.
[22:07] Well,
[22:08] That's right. That's correct.
[22:09] 2 in 2 in 2 in max 2 in 2 in over?
[22:13] Yeah, 2 or 3 in.
[22:15] Okay, so you 2 in 2 in and over?
[22:18] 2 in would be about 3.
[22:20] In the you said travel way, but you're saying the ditch or roadside.
[22:25] Well, it's anything that's in the shoulder. A lot of it in the older issues. So, you really need about 3.
[22:30] Like if there's a shoulder where there's a ditch.
[22:32] If that makes sense, down in the ditch. But if there's like the road just kind of narrow and next to the edge of the road there's rocks. They should be swept away to the other side, wherever they can get rid of. They don't need to haul them away, but they certainly could find a place to
[22:50] Put them.
[22:51] You can move them to
[22:52] Yeah.
[22:52] Where they wouldn't get hit by a car.
[22:54] There is on our side without a problem.
[22:56] Right.
[22:56] Yeah.
[22:57] I don't know about the rest of it.
[22:58] We're saying about the roadside mowing.
[23:00] Sure as if the rocks are there, you're going to hit it when to it. If they're a you can't mow it very well.
[23:05] I was looking at the mowing roadside with the tongue weight to the bottom of the ditch. So, isn't the Aren't they still mowing down into the bottom of the ditch?
[23:14] No.
[23:15] That's what I had down from your notes for the specifications.
[23:18] into the ditch. They're mowing to the back of the ditch.
[23:21] To the bottom of the ditch.
[23:22] No, the back of the ditch.
[23:23] Oh, I had down in your meeting minutes for 2013
[23:27] say to the bottom.
[23:28] To the bottom of the ditch.
[23:29] We didn't say to the back.
[23:30] We didn't say We didn't say it was a horizontal mow. have been a It could have been a vertical mow in there.
[23:37] I said yeah.
[23:37] To the back of the ditch.
[23:38] Back The back end like cuz it's a horizontal So, the horizontal bars goes out and mows.
[23:45] Yeah, horizontal mow.
[23:46] go down in ditches and it doesn't do the back of the ditch. Or if a big mow will go
[23:52] So, if that is down
[23:54] Right, if the rock's down where the mow will go over it, wonderful. If or and a car will be there. If the rock is sitting up on the shoulder and two cars meet and one of them goes over that, then mow it and it'll all
[24:08] Okay.
[24:09] Okay.
[24:09] So, that takes care of the of the grading and my Those are my concerns about grading. Are there any other concerns about grading?
[24:19] I have to have one, but I don't know if it opens a whole another can
[24:22] Let it open the worms cuz if we don't know it, we don't know it.
[24:25] me yet cuz there can be a lot of leaves in this grading operation. You're better if we don't drag these clumps of leaves into our road.
[24:33] So, what you want to do is you want to blow the leaves off before it's graded.
[24:36] Yeah, it's a can of worms, right?
[24:39] Not really. Yeah.
[24:42] Yeah, that's our problem.
[24:43] Yeah, we should be grading beforehand.
[24:45] Well, but those leaves will end up in a big massive pile anyway along with the grader and
[24:51] Should we then Should we then put in the request that we that they use a leaf blower to blow the leaves off and let's do that kind of money.
[25:01] That's a 7-mile problem.
[25:03] It's a 14-mile problem actually. Okay.
[25:07] Tasks for grading are to take place in the spring and fall. Do you want to specify no later than date so before like the leaves really start falling?
[25:15] We can get there anyway realistically. They just won't warn us.
[25:19] We'll do that we can do that when we do the total grading but with this with this one that we're putting out to extend it a year
[25:29] Oh.
[25:29] It's too late to do that.
[25:31] Yeah.
[25:31] Right. I'm still making notes for the
[25:33] time.
[25:34] Okay.
[25:34] Yeah. As you probably gone through it. You probably got your notes from it.
[25:37] Yeah, this was just something new I was thinking and I brought it up and So then at this point then we're not going to do any leaves. We're just going to grade them into the road. Okay. That's fine.
[25:47] I don't know what other people do with leaves.
[25:50] All right. So the next thing that I had down was the Berry Richmond Road Survey.
[25:56] Complete.
[25:57] Complete.
[25:58] As of last Wednesday.
[25:59] Okay.
[26:04] Realize realizing that
[26:09] Oh, great.
[26:13] Gentlemen realizing that you know, we're not looking at until next year but at least at least we're 5 months ahead of where we were 4 months ago cuz now we're looking forward. So that's all complete. And then you'll be working with
[26:31] I'm going to just got to type them up and send them to you.
[26:33] You'll be Okay. All right. So that's great. Thank you for doing that work for us.
[26:37] You want me to follow this up?
[26:46] [laughter]
[26:53] Office boy, I'm up there with the pen. I'm not going down.
[27:01] So, the next thing we talked about was the RFP specification for Dexter Pond Road and rock filled up. Do we still want to put that on for next year?
[27:12] And if we do, who do we think who do we want to have design it so we can put it out for an RFP?
[27:19] So, the last meeting you talked about grading, fabric, 4-in minus rock with a depth of 8 in, and then surface gravel of 4 in. Correct?
[27:27] Mhm.
[27:28] That's right. Brushed, yeah.
[27:29] Yeah.
[27:30] Brushed.
[27:31] That's worked very well for us in the past.
[27:33] Okay.
[27:34] Do we Do we just Do we still recommend that RFP be put out for next spring?
[27:44] We have a committee.
[27:45] Yeah. Just to me, it depends on the timing of when do we want to look at realigning that. So, if we're going to realign that road, then we can limp along with the way it is now, then
[27:57] We're not going to realign it in that area.
[28:00] Yeah, that area
[28:00] No, but it could be all one project. Just saying.
[28:02] Well, yeah, it could be, but I you know, but that's 3 years down the road.
[28:06] That's just a lot bigger project.
[28:08] That area becomes basically almost impassable every spring.
[28:12] It does.
[28:13] So, it
[28:13] It needs to have it something. Okay. So, then we'll we'll recommend that if there's money available, then we'll put the RFP out for that, and we'll know better after we exchange. Okay. Good. Thank you.
[28:29] The next one that I have is
[28:31] Can you put that RFP out, I wonder?
[28:33] So, I'm thinking about that RFP for Dexter Pond.
[28:36] Okay.
[28:36] The we already have the fabric for that road.
[28:40] Sure.
[28:41] animal supply.
[28:44] Where are they?
[28:45] Where is the fabric?
[28:46] Yeah.
[28:47] That's all set.
[28:49] Yeah. That project was supposed to be done 3 years ago.
[28:53] Yeah.
[28:54] No work so the fact is they
[28:56] Okay. All right. Well, I just don't want to put out an RFP and have somebody drain the whole account.
[29:04] So Now is now is when we start tap dancing. The next thing we have on the budget
[29:13] the budget that towns the budget amount recommendation for the town meeting for a town warrant should the listing that we have now and this is this isn't the reserve fund. This is the regular. Should the listing we have now be the same up down? I mean, we always want to go up.
[29:33] I know that, but we realistically
[29:36] I think we wait next meeting we look at it line by line cuz something should be increased on that. Like brush thinner.
[29:46] And that's fine. I just it just needs to be brought up cuz it's we're getting into that time when we have to go look for money and all right.
[29:54] Well, then we should have some RFPs back so we can plug in some better numbers. Right, road mowing, road grading those sorts of things. If we have it cuz we don't I couldn't [clears throat] tell you road grading's going to double. You want to carry the same price you've carried or is it going to go up or down?
[30:15] So yeah, we have to get some RFPs.
[30:18] So we'll put that in the back pocket then until the next meeting. But at least we 've thought about it. So the next question is the reserve amount What is there any recommendation what the reserve amount we should request from the town?
[30:36] Kind of the same thing like you said before. If we can find out what these projects are going to cost But my gut recommendation is right off the bat 350. Let's start where before we got caught. Get back to where we were trying. 450 would be better frankly.
[30:55] I think
[30:55] We've done 300 for decades. That's our feeling. We never did it.
[30:59] 350 is a joke cuz we've been doing 300 for decades, right?
[31:03] It should be more than that. And build that up. Now we're going to get pushback, I guarantee you. Especially when we have the neighbors say, "Oh, you got 369 sitting there."
[31:12] Well
[31:13] There's nothing wrong with that. That gets us started. That'll be gone I assume before
[31:19] Yeah.
[31:19] June.
[31:20] And it would certainly be nice to get out of this constant cash flow battle.
[31:24] With what the
[31:25] With roads.
[31:25] Exactly.
[31:26] All right. So, the recommendation from the from the committee at this point is 400,000 and we'll look at it again.
[31:35] 450.
[31:36] Fine.
[31:38] Sold.
[31:38] I'm I'm I got too low last time. I don't want to do that again. And he caught me another deputy, so I'm definitely not going to do that twice.
[31:45] 50,000.
[31:47] And do we want to recommend another 50 for Tempe?
[31:52] Keep it going.
[31:52] Tempe's going to be somewhere between 3 and 300,000 and a million.
[31:58] We need to keep it going because
[32:00] So I can So it's like a fire like the fire truck.
[32:02] You got to start building somewhere.
[32:04] It's just like the fire truck. Okay, so then we'll recommend that 500
[32:09] Nobody's sold on
[32:10] We're only getting 100% grant on.
[32:12] Not at all.
[32:13] Okay. We'll we'll recommend
[32:14] Especially with the DOT, all the funding was a lot of it was cut this year and they're not expecting to get that back. And so for the this the grants and things that they give out, they're really cut back on that funding as well.
[32:26] So we'll recommend $50,000 to go in the reserve fund for Tempe bridge.
[32:31] All right.
[32:32] Okay.
[32:34] Good.
[32:35] There was some reserve funds that will come off, right? Then we put this year at the town meeting. Henry's took some of our money and put it in the reserve like wasn't there a time there were a couple of different things we put money in that were like maybe going to be long term?
[32:54] Like real like he moved it from capital reserve to operations.
[32:58] Or related to the roads
[32:59] going to But it's going to come back. Those are one-year deal, one-time deal, right?
[33:04] Those for contractual.
[33:05] Okay. All right.
[33:07] The other thing that they did is they took money out of our out of the town operation funds to put into personnel.
[33:15] Okay.
[33:16] No problem.
[33:18] So that would never come back to us cuz the personnel are still there.
[33:24] All right. So next one Wayne Dam and North Wayne Dam treating the water. Yeah.
[33:35] So David Taylor and I went up look at both dams, the Village Dam and North Wayne Dam. So each needs significant amount of clearing. So I think we thought too much to put out in one RFP. So we thought we should phase it and we can start with either bridge, but me, I say Village Dam first.
[33:59] And so that would be a phase one and then we would do looking at North Wayne from the road, we would do the left side towards the town building first, second, phase two, and then the other side, so which would be the east side.
[34:13] we were going to combine two together.
[34:16] Well, we said three phases, yeah.
[34:19] Well, they Again, it Well, it depends on finances. There's a lot.
[34:23] Right. Yes.
[34:24] Okay. So it's just a matter of
[34:26] if we could get bids one, two, and three or one and two and three, you know what I mean? We could
[34:31] [clears throat]
[34:31] piece them back together if we where the numbers came in.
[34:34] Yeah.
[34:34] It would give us options.
[34:35] put Yeah, we'll put it out in an RFP but in three phases and we'll get prices for phase one, phase two, phase three.
[34:41] Yeah. And if
[34:42] And we can bump depending on funding, we can either combine or not.
[34:45] They might give us a better deal if we put like one and two together or something, though. But if we just made that clear then when they did it.
[34:52] Did you look at certain size trees or what size
[34:55] It's all going to be trees and brush, so it I think the easiest way is really to just go out and tag the major trees that need to come and then everything else is the brush all around it from here to here, from here to the air.
[35:08] So, for brush, are they
[35:09] Just lay it out.
[35:10] cut it off or are they trying to pull it up?
[35:12] No, cut it.
[35:13] Cut it up.
[35:13] Yeah, cut. So,
[35:15] You don't want to disturb the soil in there.
[35:17] Yeah.
[35:18] Leave the soil as much you can.
[35:20] So, I just wanted So, that was the approach that we 're thinking of taking, so if that's good, I'll put it all together.
[35:26] Okay. So, it's it's there as you're talking three phases.
[35:30] Yeah.
[35:30] But when we put the RFP out, we put the RFP out as phase one, two, and three.
[35:35] Correct, yeah.
[35:35] And then we take the bids on however the people want to give us the bids, whether they give us one or whether they want it two or one, two, and three and then the town will look at those. We're going to Is that a priority for this year?
[35:54] Well, timing-wise, it's not something that we talked about. We want to do in the summer when everybody's around.
[36:00] But does it have to be done in 26, 27?
[36:04] I think if you get the RFP done and then we can get that put out before April, then we can at least have those put into the budget for the fall because when the water is dropped down as low as it is now, that would be great to get done in the fall time line.
[36:19] Yes.
[36:19] There's no running water and
[36:21] And no leaves.
[36:22] And no people.
[36:24] And no peeps.
[36:24] Yeah.
[36:25] Yeah.
[36:25] All right.
[36:26] So, a thought on that from a I know from a state perspective on our state contracts there's language that says multiple awards may be multiple contracts may be awarded as a result of this RFP. So, I don't know if you can put something in that might account for your phasing and give you a little flexibility on how you make those awards.
[36:47] Is that something you've seen before, Mark?
[36:52] I was just saying if we bundle they might get a better price if we can do two together instead of okay, well this with this stage one, stage two, stage three. Okay, so you get a better price then.
[37:02] Yeah, well we can always in the RFP funding something that says give us options. Give us best pricing and
[37:08] Yeah, and in the previous in this current road contract we put in there that the town can choose to use the bid alternates or not. So, we have the flexibility to add the extra work or not, right, dude?
[37:21] Any on funding, right?
[37:23] Something that I really like to see in our tree program is herbicides. Like we don't touch them. But all this brush that's and I don't I haven't even looked at these jobs. I don't care about these jobs. But every time we cut brush and stumps and trees, if we're not treating that stump or that brush stump, it's coming back.
[37:43] It's a very short-term fix. If we can get somebody with a pesticide applicator's license to treat the stumps then that's it. We're done with that brush and that stump. It ain't coming back.
[37:55] When we're out doing the dam Taylor mentioned that the there's a guy that does very environmentally friendly herbicide and direct treats instead of you don't just do a broad spray.
[38:06] Yeah.
[38:07] Directly treats the areas and like across from me he did that for that weed that's growing everywhere.
[38:15] Right.
[38:15] And Taylor was saying, you know, where they've got Pond Road cleared now you need to do it now.
[38:20] Yeah.
[38:21] Or all this cuz it'll come right back again. I'm only familiar with this one product called Torodon RTU. And it's a stump treatment. It comes in a bottle. You can either squirt it or pour it on the cabinet and leave. And that's it. That thing is never coming back. But I'm not licensed. I used to be many years ago. This is my name. So, what is his name?
[38:39] Okay.
[38:39] It's just a shame to have this stuff.
[38:42] You put a lot of money into clearing it.
[38:44] Yes.
[38:45] And then is that should something that should be included in the RFP?
[38:49] I If
[38:50] If it was my money doing this, yeah.
[38:53] Does the committee agree that this should be should be in the RFP?
[38:58] It is my money.
[38:59] Is that something that I think
[39:00] clearing is a top priority to me.
[39:02] Well, I know.
[39:03] This is a luxury on top of that.
[39:05] Well, when it's cleared, it has to be done in a certain amount of time. Every you're going to do a stump treatment.
[39:11] Yeah.
[39:12] It And I'm not the expertise anymore. So, [clears throat] there's
[39:17] We'll have to check with the DP since it's also in control.
[39:19] It's also in control. The guy with the applicator's license is going to know what he can do and what he can't do.
[39:25] Right.
[39:26] Is it I mean, Taylor's position is that it is a safety issue, so permit permits could be exempted, but I don't know if herbicide treatment is exempted under the same. So, that would be a concern.
[39:40] I don't think that there's a permit for herbicide. You just have to follow the standard that your license gives you. And they may say you can't spray within 50 ft of the water. This is a dead issue. I don't know.
[39:52] Yeah.
[39:52] But I would
[39:52] I have a process for that.
[39:54] No, I know.
[39:55] Yeah.
[39:56] Awesome.
[39:56] So, should it would so would somebody from the committee want to explore that so we can talk about it next month to see whether we can put herbicides out or not?
[40:05] I'll find out who the guy is.
[40:07] Okay. So, Dave will put on hold putting it on in the RFP until we get a report back from next month. Okay. Thank you. And I want to thank you three for going out and include Taylor when you do that, for going out and looking at those cuz that's really good.
[40:30] Okay.
[40:36] That's not what I wanted. That's not what I wanted. What did I want?
[40:43] I want to do established a priority in these for the coming years. We've covered a ton of that. I would say one thing Tom
[40:50] Brian and I and Taylor looked at that intersection of Lovejoy, Hand Road, and Walton. We need to get somebody in this with a signal. Go through the culvert and find out where they where it goes.
[41:02] Which one?
[41:03] There's a large culvert that comes out, but we can't find exactly where it goes in, and that sinkhole is in between the two.
[41:09] The intersection.
[41:09] But not in a direct line. It's over here, and there's another culvert that goes a different direction. So, it wouldn't hurt to get somebody in with a scope and shoot those culverts. So, we'll see what we got. There's a reason that sinkhole happened.
[41:26] Left in the food.
[41:27] So, we've got listed and we've got the you all have the spreadsheet that says what we look forward what we're looking forward to for paving priorities and where we're going to go. At this stage of the game, it's varying and then Yeah.
[41:48] Mills Road.
[41:49] Did you not want to finish Hardscrabble and Fairbanks Road, the overlay?
[41:52] That's on top of it.
[41:53] Did you?
[41:54] That No, that's been changed. It's It's just but
[41:57] So, this is a priorities?
[42:00] At this stage of the game, we're we're talking about then we'll come up with the order. Okay? So, if you look at page two of the thing, what I've done is I've just listed them here not necessarily in any order that we prioritize them, but just things that we had talked about the last at the last meeting. So, there's hot scramble Fairbanks overlay
[42:20] and shoulders. Then there's a Berry Richmond Mills preparation and reclaim and base course application. There's a Dexter Pond rock sandwich. There's the intersection of Lovejoy and Wilton and Walton Road. There's the Tappy Bridge repair replacement.
[42:41] And the Dexter Pond relocation, which we've talked about a lot, but that we never really done anything and are we really interested in doing that? I know it's a 3-year project, but are we interested in starting the engineering on that yet? So, these are the This is the list of ones that I have found. Are there any others that I have not included in here
[43:03] that you can think of?
[43:07] The Berry Road culvert.
[43:09] That's what I'm going to say.
[43:10] Is the culvert included in that?
[43:11] That's That's That's included in the preparation for recommend for Yeah, because it's exactly like we when we rec when we were going to do reclamation for Fairbanks Road, the first thing we did is we went in and we replaced the cross culverts. I consider that part of the reclamation
[43:32] aspect of it.
[43:33] be done way before the reclamation happens. So, I think we should be replacing these culverts 6 to 8 months earlier. Let them settle before we go in and grind and pave right afterwards. Berry Road culvert especially has to be done quite in advance.
[43:49] So, and
[43:51] before. That was before. It should be done before.
[43:53] Okay. So, then
[43:55] I Fairbanks looks like they didn't put the overlay on that. It comes right flush to 133 like it was already at the overlay.
[44:02] No, quite not down again.
[44:04] Well, okay.
[44:05] All right. So, do we want to make then
[44:08] We're done with the overlay.
[44:09] Fine.
[44:12] do we want to make them the cross culverts are separate from preparation for reclamation
[44:26] preparation when I put preparation in there that's to me that's doing the cross culverts and all the rest of the stuff that needs to be done.
[44:35] There's two others cross culverts besides the big one. Well and that might be big one. Cross culverts private culverts and ditching and then they should come in and rebate and brush so you want to do the driveway culverts before you do the before reclaiming and into this rabbit hole we don't belong in the rabbit hole doing driveway culverts after
[44:57] and I that's fine. I just need to know that so then part of the preparation would be all culvert work. Yeah and ditching and no driveway culverts. But there are no driveway culverts.
[45:08] Well in this road but they will be coming up okay well but they will be coming up so that the preparation will include all culvert work. Okay.
[45:22] You can include those two cross culverts on Berry Road with the Berry Road project.
[45:29] Well that's what I'm thinking both those roads should just go out as an hour one hour as feet. Yeah for culverts
[45:38] yeah like we did our three RP let's get the freeze done first freeze yes freeze first and then ditch it change all the culverts another RP then reclaim it and pave it another RP and then shoulder work another shoulder added gravel to the shoulder or fiber optic then the project done project done
[46:00] okay only two cross culverts on Richmond Mills.
[46:05] Three, sorry.
[46:07] No, we saw a couple of cross culverts on Berry when we went out and explored it. On this side of the big culvert.
[46:12] Yes, that's where they are. We have We coming down here. We may have missed marking one, but we know we did a good job. I'm going to take a picture on my phone so I can remember where they were so By this I could only do so much out there.
[46:24] You did a fantastic job here.
[46:26] [laughter]
[46:27] Chasing squirrels. How many How many driveway culverts are on Richmond Mills?
[46:34] two three
[46:40] four five and one driveway.
[46:44] Do we have Do we have quite a lot of those in inventory still?
[46:48] No. Well, I mean we used up We have a bunch of 18s to We used all the 18s on Fairbanks.
[46:55] So, five cross culverts on Richmond Mills.
[46:58] Those are cross culverts?
[47:00] Yeah.
[47:00] 18-in?
[47:02] Yeah. Yeah, going to 18-in.
[47:05] And then how many driveway did you say?
[47:08] Just the one.
[47:09] On Richmond Mills?
[47:11] Yeah.
[47:15] And none on Berry?
[47:16] One driveway And no driveways on Berry. Just at 83 Richmond Road We're doing the driveway culverts there.
[47:27] And what did you say for the cross culverts on Berry because we have those There were a couple of two.
[47:33] Two plus the big one.
[47:35] Two plus the big guy.
[47:36] Is that a 36-in one? [47:38] The big one we're going to recommend a 36. It's 24 concrete right now. And going to 36. It's not in terrible shape the culvert itself but the end slope or the invert of what this just a mess.
[47:54] Would it be a situation where we could add to what's there or the new shed or just so far It's the slopes are one to one straight down to the
[48:05] Right.
[48:05] So it needs to come out.
[48:07] to get and garden.
[48:08] And it'd be better to maybe even build it up a little bit and get that dip out. Same time.
[48:14] So I think we should price that furniture's budget. I mean if you're looking at seven 18-in cross culverts times how much linear foot and then for the 1 15-in driveway plus the 136-in you're going to want to put that increase that culvert line on your roads cuz we currently only have $5,000 for culverts on operations.
[48:36] If you're looking for getting it done throughout the year versus capital
[48:39] Oh, yeah, they So somewhere along the way we switched. [48:47] The 5,000 we have in culverts only ever purchased culverts.
[48:51] Right.
[48:51] Never installed any.
[48:53] No, I didn't think they did.
[48:54] I never installed any culverts. That was just what we spent to buy culverts.
[48:58] Right.
[48:58] And then we had them pre-ordered just to put in.
[49:02] I got that. I'm saying that's what you have in the budget line right now.
[49:05] Right.
[49:05] I'm saying this is going to cost more than 5,000.
[49:07] Correct. The culverts but this year we didn't put culverts. We didn't give them culverts. They carried them in their beds so 5,000
[49:14] Oh, but the driveway ones.
[49:15] Yeah, everything. Well, just happened to have the cross culverts so they actually used them but yeah. They bought their own driveway culverts so it's just they just supplied their own material.
[49:25] Right.
[49:25] So if we're going to keep going that way then we can get rid of the $5,000 culvert line. The contractors are going to provide the culverts from now on.
[49:34] Okay. So we'll put this on the RP then.
[49:36] But my recall is that if we if we the town buy the culverts then we'll save a lot of money. Save some money.
[49:45] That's what I think but that's not what we did so
[49:48] Well, I know cuz we didn't have time. Again, we're working fortunately 6 months ahead. So we've got the time to do that if we recommend to go buy some culverts. We can do that because we're we're that far ahead from what we were 4 months ago, 5 months ago.
[50:05] Big concern, I personally think they should just let the contractor supply them and do it because you don't want to be in a position where we're we're short of culverts and now we're holding up the contractor.
[50:16] And the contractor is waiting and
[50:19] to get culverts approved for purchase, purchased, ordered, all the whole process that takes time. So just don't I just don't like to see the town you know, being accused of holding up the contractor. The Let the contractor just supply whatever he needs to do the job. We're not
[50:36] What's the price difference to your culvert compared to the town price? Ballpark. This is what I know. If you go to Paris Farmers Union to buy driveway culvert or any culvert, it's twice as much than at Paris Farmers Union. What is it? Is it 2 by 4 by 8 or something like that? So let's just say Shannon falls Bertwell Farm to replace a culvert.
[50:59] I'm going to turn on the clock and I'm going to drive to Paris Farmers Union. I'm going to pay twice as much for the culvert. I'm going to drive back with it and then I'm going to install it and I'm going to get paid for all of that and you paid twice as much for the culvert. Now if we have some culverts at the salt shed, time is still stopped. So you save 50% on the driveway culvert and I didn't you didn't pay me to go to wherever to get it.
[51:22] And that's if you're paying time and materials.
[51:25] That's if you're paying
[51:26] But if you're in a bid situation like we are with Pike, just supplies it. He's not
[51:30] Now
[51:31] It's included in his linear foot price going to get it.
[51:34] It's included but the thing is he might mark it up 20% on top of the 100% already.
[51:39] And he's paying sales tax and we're not. So it's 20's 5 and 1/2%.
[51:44] Yeah, they're typically marking it up depending on how much profit they want to try to make. If they try to if they really want that job, they're not charging you 20%.
[51:52] Did they use our culverts when
[51:54] Just our cross culverts.
[51:56] Just our
[51:57] Which was part of an amendment. It wasn't part of the bid.
[52:00] Did We just didn't have enough to do the driveways as well.
[52:04] Right. We didn't have the right size.
[52:06] Yeah. We didn't have all the driveway culverts or whatever it was.
[52:09] But here we have an idea here we're going to have an idea cuz you measured we have an idea of what we're going to need for culverts. So why don't we just buy them and have them and Yeah. They're there to grab. And then if we if we didn't know what we were going to need it would be one thing.
[52:24] Yeah.
[52:25] But I look at it
[52:26] But
[52:27] Who manages this the barn?
[52:29] Who manages the stock pile of pipe?
[52:31] Who stacks it?
[52:33] Who keeps track of it all? It's just becomes a lot of work items that we don't have people to do. So Mark oversees it a lot just because it's part of the he's a
[52:45] Mayor.
[52:45] Henry had said he had gone there and counted pipe but the pipe were laying all willy-nilly a little bit, you know? So it's like who does it all? Hazel.
[52:58] Yeah. [laughter]
[53:00] So that's how that's how I look at it. What? Don't get into the stocking business. Just get into the fencing business. Stay that way. Let them deal with the handling of them, too. But that's just me. I come from the land of endless budget.
[53:16] All right.
[53:17] [laughter]
[53:18] Lucky dog.
[53:19] All right. So
[53:21] shaping the budget.
[53:23] Is there a recommendation on whether we buy culverts or we don't buy culverts or is there a majority consensus and a minority consensus?
[53:32] [clears throat]
[53:32] I think there's going to be a split decision cuz I think we should buy culverts.
[53:36] Okay.
[53:37] And I understand your perspective.
[53:39] I understand yours, too.
[53:40] Do you think that we I this when we come back to the table to go over line by line on the budget or something you can keep it will come back up again. Yes, I would say we still continue to buy edges of huge chippers.
[53:51] So you consider buying the culverts. But the town buys them and it supplies them. And you consider that the contractor buys them.
[54:01] I think it should comes as part of their business. They supply them.
[54:10] [laughter]
[54:13] Yeah, you're right and in this favor I'm in I'm in favor of the town buying them because we know what we need. Now it was just if it's going to take $500 to go down and straighten out that mess that's down there now and get rid of the garbage that's there but they just got stuff put there. I think we'll more than cover that with the with what we
[54:35] spend
[54:37] What's the $500 we paying? I'm not worried.
[54:40] What are we getting at? So
[54:41] Well, it's that's what that's my I go down in today. It's going to cost four or $500 to clean that place up and the culverts up like they should be and that kind of thing. And it's it's one of these things that we talked we put a con down Shannon can if she wants to can put up put the old
[55:04] the bid. She shouldn't have to even put out the bid cuz it's only going to be five or six hundred dollars to line that stuff up. And clean up the mess that's down there and get rid of the old iron culverts and things.
[55:15] They're all gone now.
[55:18] Oh, they're gone? Great. Okay.
[55:20] We used to have them down there.
[55:22] What's that? Yeah, you're talking about the ice?
[55:24] Yeah, the ones we took out. Is that what you're referring to?
[55:27] I am. But there's also some concrete culvert down there now.
[55:30] Yeah.
[55:32] Yeah, that we don't need so that can be Anyway, so it's three to one.
[55:39] To
[55:39] to buy the culverts between now and when we put a contract out next spring. Okay?
[55:48] That's all I had for the agenda. Any other items that we haven't brought up that we need to talk about?
[55:53] Well, we got a lot of thinking about it and down the road, but
[55:57] I have a couple items there.
[55:59] Okay.
[56:00] Striping. [snorts]
[56:02] Mhm.
[56:03] So, now that we're starting to repave our roads, do we ever consider putting a shoulder stripe or a center stripe on Pond Road or
[56:12] Old Winter Road.
[56:13] We're talking about Old Winter Road just for safety's sake. But are we Do we as a town do we think that 's just extra money? Historically, I don't know the reasoning we don't stripe it.
[56:23] The shoulder stripe.
[56:25] Doesn't stripe. That's it.
[56:26] And those roads They're going to be rebuilt. I mean, each year is going to be challenging where it's dark and there's a dark road.
[56:35] But they're going to turn gray here within 6 months.
[56:39] I mean, yeah, just to country road.
[56:41] For my own edit, you know, I'm just like going down Pond Road, that's that. It may would be nice to have something.
[56:50] [laughter]
[56:52] But it's striping is
[56:54] Okay.
[56:54] Striping is the cheap part of road construction.
[56:57] That is.
[56:57] It's a penny
[56:58] Any amount It's a penny what?
[57:00] No.
[57:00] I like doing the striping right before Memorial Day, so it looks fresh for the parade that came down Main Street with all the sidewalks and everything and going into school. I mean, that's the end of school year, but if we get it all done then, like right before school closeout, right before Memorial Day, is there anything else that you'd want me to add to it?
[57:20] We should definitely have a school zone some There's a ton of speeding people on that.
[57:25] We did. Yeah, we had the school zone
[57:27] Okay, we'll ramp it up.
[57:29] At this stage, we're we're talking two different areas. What Brian is talking about is the is to do old winter road the whole length.
[57:39] Well, he's talking about the whole length.
[57:41] I'm talking every road.
[57:41] Well, no, but let me get through finished, please. He's talking about doing the this six roads that we just paved with 1 in. The whole length. And whether he does whether we do a single yellow stripe in the middle or two white stripes on the side. That's what he's talking about.
[57:59] It would be nice to know cost.
[58:00] And then and then Shannon just brought up what we already do down main part of town. So, it's two different items. So, should we look at what it would cost to stripe the whole town just to get an idea for it?
[58:18] Stripe the whole town?
[58:20] Yeah, probably going to have to do it. Every road or
[58:23] Okay, so then what we should do then what we should do then is come back next month or when we have our next meeting and say these are the roads we think should be either side or middle striped the whole length.
[58:37] Well, I would imagine that the striper guy could just say it costs this much per gallon.
[58:42] Well, I know that
[58:45] But we need to know
[58:48] Cuz I don't even want to talk about it if it's 50 grand.
[58:50] Yeah, but we need the list of roads that we would like to have done so we can tell the striper guy this is what we want to do.
[58:57] We can't get a foot price without telling them what
[58:59] I know the striper guy.
[59:01] They I contacted several striper companies back in the spring and the ones that we went with had the lowest bid and they go, yeah, by color, they go by distance and then what type of like product they're doing. I mean, like for the road they charge different but school zone different for that or candy cap zone or parking spaces
[59:24] or sidewalks. sidewalks were pretty expensive, but the line striping I could probably get a quote on that. If you knew how long it's going to be, like what the feet are for the roads. Like if you're looking at the whole portion of a road or just a segment, like Readfield does the Innis Ridge just for that segment and around the corner. are you looking at certain portions?
[59:45] Well, that's what we'll come up with next. They didn't do the whole Innis Ridge.
[59:49] No.
[59:49] Yeah, well that's what we'll come up with next. That's what I want to come up with next month.
[59:53] We do just sections where maybe the newcomers
[59:56] Yeah.
[59:56] So maybe so this is
[59:59] Brace, I would just tell
[1:00:00] Guys,, guys,
[1:00:03] figure
[1:00:03] let's have one conversation, please.
[1:00:05] figure 5 to 10 mi.
[1:00:09] Yeah.
[1:00:09] Roughly. Just so he knows he's not doing 100 ft. He's going to do mass quantity and how much per linear foot. Then we can apply that number to however many miles of road we think it'll be. We pick out the roads.
[1:00:23] Number 5 or 10. We've got 20 28 mi of paved road in the town.
[1:00:31] And then we have seven in dirt. We have 32 total.
[1:00:36] You would be just looking at the white on both sides?
[1:00:39] I would ask him for the option. What would it be for the yellow down the middle? What would it be for two shoulder stripes? For the white stripes down the shoulder.
[1:00:48] Down the middle and two white stripes?
[1:00:50] No. Yeah,. Either or.
[1:00:53] No, he's not doing all
[1:00:55] Off Temple Way, the whole thing is
[1:00:57] [laughter]
[1:00:58] We have to peel that
[1:01:01] My own feeling is that we'll come down Innis and they'll go, "Why don't we stripe our road?" I'm like, "Well, that's Readfield. They're more They're more worried about safety than
[1:01:10] We have our striping.
[1:01:12] Yeah. That's how they did
[1:01:13] But they didn't do the whole thing.
[1:01:14] They only do portions.
[1:01:16] And that's what we would do. We would only do the portions that we feel are connector roads that are getting us from a state road a state road.
[1:01:23] I do stand corrected. We have 23.3 miles of paved road.
[1:01:29] According to
[1:01:29] 5 miles of straight
[1:01:31] Well, three and probably maybe 10.
[1:01:34] So
[1:01:34] If we let say what we paved.
[1:01:36] Yeah. What Well, why don't we get both five and 10?
[1:01:40] Yeah, that's just for him to price it, you know.
[1:01:42] It just depends about this. It's not rocket science to get a price for both.
[1:01:47] Okay. Anyway, so
[1:01:49] So
[1:01:49] What was the select board concern came up around the library specifically in the speeding on the Winter Road and the recommendation from this committee was to not put every speed bumps in.
[1:02:03] Right.
[1:02:04] And the suggestion the recommendation was the striping and other speed deterrent devices. Yeah, we have so
[1:02:14] That still is a recommendation.
[1:02:17] And I would say we don't do it. That's too late now cuz we can't plow it off.
[1:02:21] Let's do it this spring.
[1:02:24] Stripers?
[1:02:25] There you go.
[1:02:27] So I just want to bring that back
[1:02:29] Yeah, they
[1:02:29] They made that determination that determination whether or not to stripe that guy. What was that conversation about not putting those bump speed bumps in and drilling holes through the pavement and then
[1:02:46] And then that still is our recommendation is to is to stripe it not speed bump it. Yes.
[1:02:52] And was there some conversation about the school and the speed limit at the school or the time zones or like
[1:02:57] Oh, that was the time zone. Yeah, that was from there.
[1:03:00] So it's just the time zone thing.
[1:03:01] Yes, I did.
[1:03:02] Yeah, and parents are the worst. When I used to drive on roads, Billy's late.
[1:03:08] Okay. And then my other one was the old dam. So the management of the village dam. So right now the lake is low, but where the manual says it should be. Right? We spoke There's four boards in it. There's five days, four boards in each, so there's four boards high. The manual says on October 1st, we're to remove two of the boards and leave two in for the winter.
[1:03:32] So, right now we just what I took the two boards out in Friday of I'm staying again. And the lake is where it's at. So, then I've gotten and few comments about Lake Pocasset.
[1:03:44] Pocasset.
[1:03:45] Okay.
[1:03:46] Yeah. Thank you.
[1:03:46] Yes. Sorry. And then there's issues about the general store and their drinking water supply and that they pull the water out of the mill pond directly. So, we're currently their black water pipe is floating on the surface of the mill pond, which is where it's been the whole summer.
[1:04:07] But so, there's a concern that I dropped the boards two boards that I maybe I could put a third board back and that would get that pipe
[1:04:19] So, it wouldn't freeze.
[1:04:22] So, I said I can't I didn't tell these nice people that bring [clears throat] this to my attention that
[1:04:27] [laughter]
[1:04:27] it's just going to put it 8 in it's just going to float 8 in higher than it's currently floating. The pipe needs to have a concrete block attached to it and brought down. No, it doesn't have to be sunk into the mud, but you can just put a rope and tie it to the black pipe and keep the pipe couple feet off the bottom of the mill pond where it won't freeze.
[1:04:48] But it's not the dam keeper's job to do. And I said I do not I could go fix it today, but that's not my job to fix their water pipe. I go there crack the pipe and then so, I tell the people that I'm we're going to meet today and Henry is one, Lloyd Earlen is another. So, they're people that are concerned about the big picture.
[1:05:09] So, I'm concerned about the big picture, too, but I said, "I don't want to make a decision that's outside the engineered manual for the dam. I don't want to put a third board in when the manual says there's not supposed to be a third in because then if heaven forbid anything should happen, we're not operating the dam in accordance with the engineered manual." Well, did the manual take into effect that there was drought?
[1:05:32] I said, "The manual took into account all rain history of this town for the till 2003 when the manual was put together." So, yes, but they didn't know what the rain conditions were going to be in 2026. I said, "Well, why not?" I know cuz then
[1:05:49] So, I just Do you feel that the level of the lake is where it typically is?
[1:05:54] Well, so I talked to Wayne Bryant who's his did it for 25 years. So, Wayne would leave a third board in just because just because. It makes it easier for him to pull docks and boats and stuff in the fall. So, but it makes him a lot more difficult to pull the boards because we're supposed to be down to one board in March.
[1:06:15] And when the water's high and rushing and freezing cold, icy, he's slipping and sliding and trying to pop more boards than he needs to, whereas currently the manual would have him just have to pop one board out.
[1:06:30] I don't see what would happen if you deviate from the manual.
[1:06:33] That's my engineering brain, but for people's concerns and Hazel, if you hear it, I That's where I'm coming from. So, I'm happy to go put a third board in, but I don't want to do it unless I'm
[1:06:46] I would suggest that you came back from this meeting and that the recommendation of the landowner is that they should put a weight on their waterline. It's up to them. They should sink it. Very easily done. There's no reason why they couldn't do it. But I Who's going to tell them that?
[1:07:03] Nobody needs to tell them that. Nobody should tell them that.
[1:07:06] They called the town office.
[1:07:08] I've been given
[1:07:09] Yeah.
[1:07:09] I've been given a recommendation to sink their line cuz it's currently floating. And I And I should take a picture and I'll go down and take a picture of that. And then the recommendation will be to sink it.
[1:07:20] And it's not the town's responsibility.
[1:07:22] Right.
[1:07:22] No, cuz you're at risk. Why would I want to mess with someone's Can you come tell me what to do with my water line? What's more durable? Why would you tell these people what to do with their water?
[1:07:32] I would recommend it. I wouldn't tell them what to do, but I would recommend it because obviously when you come back to the policy, there was a structural engineering done on that dam in the spring. Now we are not following that policy and like Brian said, if suddenly there's a dam failure because of all of the spring run off and we have significant flow, then who's liable for that?
[1:07:52] The general store or the town?
[1:07:55] I don't think anybody's And the town should be responsible for somebody's private water supply. Or get involved in it.
[1:08:02] They got to look at the potential first. The problem is they're
[1:08:05] Yeah, they're asking.
[1:08:06] And they come up at the select board meeting this week. the concern that last year they pipes froze at the general store and they had all kinds of damage and yada. It's a normal pipe that's exposed, but I think if you're operating under the standard operating procedures for the dam, regardless of what the previous dam keeper did,
[1:08:29] then at least you've got I'm not speaking for the select board, I'm speaking for myself, but at least you've it's backed up by something. So, I think you should make your recommendation to Shannon and
[1:08:41] so maybe yes, I Thank you, Ace. So, I don't think you, Shannon, you should tell them what to do to fix it. I think you should advise them that they should get a plumber or water supply expert to look at their situation and try to ensure that it doesn't freeze.
[1:08:56] It's not for The realm of the simple fact is Tyler sinking.
[1:09:00] Yeah.
[1:09:00] That's it.
[1:09:01] Yeah, but if they do that and there's a problem then we got to
[1:09:03] Then you've taken liability.
[1:09:05] Don't tell them what to do. They shouldn't do anything.
[1:09:08] I wouldn't [clears throat] do anything with my water supply.
[1:09:12] Once I surround it, then they'll figure it out.
[1:09:14] Okay.
[1:09:14] I just I don't want anything to happen. Personally, I don't want anything to happen to them, right?
[1:09:19] Right, but I don't want as much If this is my role with the town, I'm not comfortable telling advising them, personally.
[1:09:26] Yes.
[1:09:27] I have something else.
[1:09:29] Any Anything else?
[1:09:31] that was the my two things.
[1:09:32] All tread area related.
[1:09:35] That neighbor there has post posted signs over where our gravel is.
[1:09:42] To the left.
[1:09:42] Should we get that line surveyed? Cuz Yeah, that's just what I think about that. I think he's way off.
[1:09:50] Where the Where the gravel used to be?
[1:09:52] Where we stock piled the gravel, now there's a posted sign count 20 ft this way of the stock pile. We really should know where that line is.
[1:10:01] Does actually go into the left? Is that what you're talking about? That thing?
[1:10:03] That's where Pike has their equipment now.
[1:10:05] Yeah, like when Pike parked their rollers all the way into the left there, they're over the property line. We really should know where that line is.
[1:10:13] Okay. So the recommendation of the board is to have that at least that line of the property surveyed. That line surveyed.
[1:10:20] know why we wouldn't know where that line really is. So maybe it's further this way, but we ought to know.
[1:10:25] Okay. So the recommendation of the board is to have the town survey that. I was going to say I'm going to recommend
[1:10:30] recommendation here. So It's It's a recommendation.
[1:10:32] Okay, it's a recommendation.
[1:10:33] We recommend but we'd like to do more but we can't.
[1:10:36] Okay.
[1:10:37] All right. So Is that all right with the board?
[1:10:40] Yes.
[1:10:41] Okay. So that's our recommendation is to have that at least that line surveyed if not the whole property.
[1:10:49] Anything?
[1:10:51] The pothole on
[1:10:55] Which road?
[1:10:56] [1:10:57] Brown by Brown Hill.
[1:10:58] Yeah.
[1:10:59] Okay. And pothole by the new house on Pesco? Yeah. Okay. That was going to be my next one of my next questions is when we make this feedback back to the to the road commissioner Shannon to our satisfaction and I'm talking about the whole committee
[1:11:19] even though I don't make very many recommendations. Are our recommendations being looked at and completed or not completed or are they not being worked on? If we find a bad spot in the road or that kind of thing.
[1:11:37] Can I weigh in on that one? Sure. Talk about your process either now or the next meeting on how you keep track of all of these requests whether it's towns person wants a tree removed somewhere or somebody's reporting a pothole or something else and then there's a list of contractors and how you go out and get prices.
[1:11:59] Yes. So I have a list of different things. I do understand what Mark's saying as far as the washout and the pothole with the pothole law making sure that you know if there's anything that could be cause for defect to personal property such as vehicles
[1:12:21] then it needs to be taken care of within 24 hours. I should put out a notice policy on how to formally submit some requests to the town. Right now I've been taking by voice. I've been taking phone calls. I've been taking emails, voicemails. I write everything down and then when I get a substantial number
[1:12:42] of requests in one category I try to go out and handle all of that. Cranial Farms in the corner of Mount Pesco are definitely something that do need to be responded to. I did respond to the Mount Pisgah one at one point. It just didn't get done when they went out to do the potholes.
[1:13:04] And so that's something. And that's also part of the noise requirements for the state law is it does not necessarily need to be fixed within 24 hours. It needs to be addressed within 24 hours. And whether that is just sending someone out to take [clears throat] a look at it, putting in a cone, putting in a sign, putting something out there, or acknowledging it in one way or another.
[1:13:25] but yes, I do have a list and I'm trying to get down through that list.
[1:13:32] Then I have a spreadsheet that I had.
[1:13:34] And you have a spreadsheet of people you can call when your list needs dealing with?
[1:13:39] Yes, and I do have to give some follow-ups because I have put in requests for signs to be replaced. That has been ongoing with a certain individual for months. I requested Tempe Bridge and Maxim Road culverts to be addressed with beavers. That has not been handled, so I do need to follow up with that individual as well.
[1:14:00] but it's a matter of following up with the people that I also requested from because it does seem that even though I requested it, might not get done right away or it might not get done in a week or two weeks and then it just comes down to a timing thing.
[1:14:15] Brian, are you going to be out when Pike does the they left like the driveways and stuff to come fill in again? Are you going to be around then like you had been at all?
[1:14:25] Mhm.
[1:14:25] They missed when they did the Walton Road side. They ground out as a It's very little, but there's a hole and it's going to get bigger.
[1:14:34] It's all on the right there.
[1:14:35] I don't know why they left that one little It's like it chipped out.
[1:14:38] Yeah, it's like a piece of the old road chipped out there.
[1:14:41] it. They sprayed it. It's like it just
[1:14:44] Yeah.
[1:14:44] Something Well, that Well, they because they also left that very road side so they're going to be in the hand of
[1:14:50] Yeah, when they do that but they do that other little piece on just to check about that but
[1:14:54] Yeah, I did see that actually. Yeah.
[1:14:56] Just but you know Yeah.
[1:14:58] And Mark does it as well as it I saw a [clears throat] piece of it is out there so
[1:15:03] Mark here and Mark
[1:15:05] We requested that they fix the couple of spots on Pond Road.
[1:15:10] Okay.
[1:15:10] [clears throat]
[1:15:10] And I had them
[1:15:11] I drove there yesterday they did so the best the best they could.
[1:15:15] So the joint
[1:15:15] You see where they sanded applied more stuff you could see where the compactor the plate compactor scraped up the asphalt right straight near your house across from It's right where the log cabin is right in the middle of the map.
[1:15:27] Yeah.
[1:15:28] Right across from the table.
[1:15:29] There was a bump there 's still a Yeah, they got a bump. The other thing is the joint wasn't very good down by Lukens Corner right after Lukens Corner by Mercers place used to be. That was the overnight joint. if you headed North bound you'll hit it.
[1:15:44] [clears throat]
[1:15:44] I don't know why they couldn't get the butt joint better but
[1:15:48] Yeah.
[1:15:48] They're very responsible like if you just point out to them if they fix it while they're here.
[1:15:54] Right.
[1:15:54] So their intent is they're going to finish paving all the roads and then they're coming back to do all the driveways and the hand work.
[1:16:00] Okay. It's funny how they did some when they going by and others they didn't. Like why did they do Walton Road but not Berry Road?
[1:16:09] Hm.
[1:16:09] I think it only reaches out that little side it only goes out so far.
[1:16:14] Yeah.
[1:16:15] Yeah.
[1:16:15] Yeah, that's a mystery thing. Just
[1:16:18] Anything else?
[1:16:21] So the next question is when do we have a next meeting?
[1:16:27] Can I suggest December 14th as the only one to have open? What is December 14th?
[1:16:35] This is November 1st basically.
[1:16:37] Yeah. So 6 weeks.
[1:16:39] Yeah.
[1:16:40] Do we have anything that's critical before that?
[1:16:45] No shoulder. That's just her getting the bids and doing them. That should be just done. Okay.
[1:16:56] Yeah, cuz we've we've requested we've recommended that it be done. We've recommended it be done with 3/4 minus.
[1:17:06] And so then that's that's our recommendation to the to the to Shannon. So that's done really. So there's no the shoulders aren't aren't critical. On the roads that we've done I eventually I hope we're going to talk about shoulders on roads and haven't been done for 3 years.
[1:17:28] So but that's not now that's not today.
[1:17:33] I'm just really pleased that we're at least 3 months ahead. Looking 3 months ahead and not we're looking 2 weeks ahead.
[1:17:44] Thank you guys for that and for Shannon for doing the work so working tough.
[1:17:52] Is that a Monday?
[1:17:53] Yes. Supposed to be back in Rhode Island. Can we do the 7th after not good for you David? The 14th is the only
[1:18:02] Well, it has to be Monday.
[1:18:07] That's actually the only Monday to you it doesn't matter I can December 2nd is a Wednesday. Do this then. I can I can do that.
[1:18:20] Yeah, it's all right with me. Okay, so December 7th 2nd?
[1:18:28] Okay with you Shannon? Okay, December 2nd 8:30? I'll try to get it right in right it minutes this time.
[1:18:37] That's a Wednesday so the Just got to remember it's a Wednesday.
[1:18:42] So that's That's our next one. Just going to be a second.
[1:18:47] Do we have three of these?
[1:18:49] to 8:30
[1:18:50] 8:30
[1:18:51] 8:30